Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Measure BB Bond: Bid Bundle #10: Bixby & Sparks Middle School II

Closed
20260917005State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The work is to be performed in California, with subcontracting postings specifically targeting the Riverside and Los Angeles project areas. The solicitation was posted on November 2, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must provide proof of specific actions to avoid being deemed non-responsive, including posting solicitations in an online publication for 30 consecutive days and in a print newspaper for one day prior to the bid opening. Additionally, bidders must submit proof of utilizing the Small Business Administration and the Minority Business Development Agency with their bid package. While documentation for outreach and recruitment may be submitted up to three business days after the bid closing, failure to include the required publicity and agency utilization proof within the initial package will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 1 hour ago

DEADLINE

in about 16 hours
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Required pricing scopes are extensive, covering everything from demolition, abatement, and structural steel to mechanical, electrical, plumbing, and crane services. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in 27 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform comprehensive water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge that affected the first, second, and third floors, including dormitory rooms, offices, hallways, and conference rooms. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with specific LVP and rubber wall base standards, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with NFPA-101, ADA, OSHA, and EPA regulations. Contractors must also adhere to Davis-Bacon Act labor standards, including specific minimum wage and paid sick leave requirements.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 14 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring interior spaces damaged by water intrusion to return them to safe residential use. The scope of work includes repairs to sixteen residential rooms and bathrooms, as well as mechanical and utility rooms, involving drywall installation, joint finishing, painting, and the temporary removal and re-installation of HVAC equipment. The project is designated as an SBA set-aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The contract is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonds for the full project value, along with proof of liability and worker's compensation insurance, within ten days of award. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Final acceptance by CSD is contingent upon the successful testing of all restored mechanical, plumbing, electrical, and life-safety systems, the removal of all debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 17 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm fixed price project involves comprehensive renovations including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling with new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include upgrading HVAC variable air volume systems, installing simple dimming lighting controls, replacing ceiling fans, and updating doors and life-safety components. The scope also extends to repainting interior surfaces to a level 4 finish and providing new signage for all spaces. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by November 18, 2026, and will be evaluated using a best suited then negotiate methodology, with equal importance placed on price, past performance, and corporate relevant experience. Award eligibility requires at least a satisfactory rating for past performance and an acceptable rating for corporate experience. The contractor is required to provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. All work must comply with ADA accessibility guidelines and the FLETC Hazardous Waste Management Plan, and personnel must undergo background checks and fingerprinting for facility access.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes and epoxy mortar flooring, and the installation of updated HVAC systems, exhaust extraction, and compressed air systems. Additionally, the project requires a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements including paving, drainage, and hazardous materials abatement. The contract will be awarded based on the lowest price, with proposals requiring pricing for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. Administrative requirements include monthly invoicing via Wide Area WorkFlow and strict quality control phases for each definable feature of work. Proposals are due by November 23, 2026, and must acknowledge all amendments, including updates to flooring specifications and fire protection inspection schedules.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Hacienda La Puente Unified School District is soliciting bids for project 2026-27.03, titled Measure BB Bond: Bid Bundle 10, which involves classroom upgrades, select site work, and ADA accessibility enhancements at Bixby School and Sparks Middle School in California. The contract will be awarded to the lowest responsive and responsible bidder based on the combination of base bids and options that result in the lowest total project cost. Bidders must possess an active State of California Contractor License B or other specified classifications and must be prequalified on the District's Measure BB Bond Projects list to be eligible. Sealed bids are due by 3:00 p.m. on October 1, 2026, and must be delivered to the District Office in the City of Industry. Submission requirements include a bid security of 10 percent of the total bid price via a bid bond, cashier's check, or certified check. A mandatory job-walk was scheduled for September 21, 2026. The successful contractor will be required to provide 100 percent performance and payment bonds and must ensure all workers are paid prevailing rate per diem wages in accordance with California Labor Code sections 1725.5 and 1771.1.

General Info

Bids for Bixby and Sparks school upgrades due October 1, 2026, for qualified contractors.

Documents

1
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Hacienda La Puente Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #2026-27.03: This project involves classroom upgrades, select site work, and ADA upgrades at both Bixby School and Sparks Middle School. Contractors must be prequalified with the District for Measure BB Bond Projects to be eligible to bid. The work includes various improvements to existing classrooms and site accessibility enhancements.

More opportunities from California → Hacienda La Puente Unified School District

Same awarding agency

NAICS: 238210
SLED
Los Altos High School Aviation Electrical Upgrades
Solicitation # 2026-27.02
The Hacienda La Puente Unified School District is soliciting bids for solicitation number 2026-27.02 to perform electrical infrastructure improvements for the Los Altos High School Aviation Program in Hacienda Heights, California. The scope of work includes the installation and modification of electrical distribution systems, branch circuitry, receptacles, dedicated power connections, conduit, wiring, and grounding to support flight simulators, aviation training workstations, and associated instructional technology. The project requires the contractor to verify existing electrical capacity and perform load balancing. To minimize disruption to campus operations, work is primarily scheduled from 4:00 p.m. to 12:00 a.m., with a requirement for daily cleanup and restoration of instructional spaces. The contract will be awarded to the lowest responsive and responsible bidder. The anticipated notice to proceed is January 4, 2027, with a performance period of thirty-five consecutive calendar days. Bidders must provide a 100% performance bond and a 100% payment bond. Additionally, a Letter of Assent regarding the District's Continuity of Work Agreement is required for contracts valued at $200,000 or more. All personnel must comply with criminal background check certifications for working near minors, and wages must adhere to applicable prevailing rate determinations. Final acceptance is contingent upon the architect's written approval, the submission of as-built drawings, and the correction of all defects.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

20 days ago

DEADLINE

in 7 days
View Details
NAICS: 238210
SLED
Glen A Wilson High School Replacement Of Stadium Electrical Equipment & Wiring
Solicitation # 2026-27.04
The Hacienda La Puente Unified School District is soliciting lump sum bids for the replacement and repair of stadium electrical equipment and wiring at Glen A Wilson High School in La Puente, California. The scope of work includes the installation of 1,000 feet of replacement conduit and the comprehensive management of site safety, including the provision of temporary fencing, barricades, and facilities. The contractor is responsible for ensuring that athletic field operations, such as lighting and scoreboards, remain functional during construction. Additionally, the project involves the removal of hazardous materials, including asbestos and lead, as well as the repair of asphalt, turf, landscaping, and concrete pavement. The contract will be awarded to the lowest responsive and responsible bidder. Required submission documents include a bid bond of at least 10 percent of the base bid, a designated subcontractors list, a noncollusion declaration, and an Iran Contracting Act certification. The successful bidder must provide 100 percent performance and payment bonds and adhere to California prevailing wage laws. The project includes a 50,000 dollar allowance for unforeseen conditions and a 3 percent participation goal for Disabled Veteran Business Enterprises. The anticipated award date is December 15, 2026, with a tentative notice to proceed on January 1, 2027. All work must comply with the 2025 California Building Code and ADA requirements, with final acceptance formalized via a Notice of Completion by the District Board of Education.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

25 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS