Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Mechanical (HVAC) Installation Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract encompasses the installation of heating, ventilation, and air conditioning systems requiring detailed shop drawing submittals and close coordination with the general contractor to ensure seamless integration into the broader construction scope. The work is classified under NAICS code 238220 and is structured as a subcontract, indicating it is part of a larger project managed by a primary contractor. All activities must be executed in compliance with technical specifications and scheduling requirements, with particular emphasis on alignment with the overall project timeline and design intent. The solicitation was posted on July 26, 2026, with a response deadline of August 27, 2026, at 6:30 PM, allowing qualified vendors a defined window to submit proposals. The contract is associated with the Engineering organization based in New York, though specific location details for performance or agency contact are not provided. Interested parties must navigate the procurement platform via the provided link to access full documentation and submit responses, ensuring that all submission guidelines and technical requirements are met to be considered for award.

General Info

HVAC installation subcontract requiring shop drawings, GC coordination, and compliance with project timeline and specifications.

Agency

New York → EngineeringView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

NY, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York → Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
New York → Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of heating, ventilation, and air conditioning systems with shop drawing submittals and coordination with general contractor.

Similar Contracts

Same NAICS industry code

More opportunities from New York → Engineering

Same awarding agency

NAICS: 562910
SLED
Hazardous Material Handling and DisposalThis contract involves the identification, containment, and proper disposal of hazardous materials, with a primary focus on asbestos, during demolition or renovation activities. The work must be conducted in strict compliance with environmental and safety regulations to ensure the protection of workers, the public, and the surrounding environment. The subcontract is tied to projects within New York and requires specialized expertise in handling regulated substances, including adherence to protocols for detection, isolation, removal, packaging, labeling, and transport of hazardous waste to authorized disposal facilities. The contract is categorized under NAICS code 562910, which corresponds to remediation services, indicating the nature of the work is environmental remediation rather than general construction. The solicitation was posted on July 16, 2026, with a response deadline of August 18, 2026, by 6:30 PM, allowing potential bidders a limited window to prepare and submit proposals. Although no set-aside information or specific point of contact is provided, the location of performance is implied to be within New York, and bidders must be prepared to meet all state and federal regulatory requirements for hazardous material handling. The contract is structured as a subcontract, meaning the successful bidder will operate under a prime contractor or larger project framework.
Remediation Services

POSTED

10 days ago

DEADLINE

in 23 days
View Details