Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Mechanical Repair & Maintenance Fittings (Lot 2)

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Mechanical Repair and Maintenance Fittings (Lot 2) involves the design, manufacture, and supply of critical hardware for prime contractors working on United Utilities Water Limited projects. The scope of work focuses on water infrastructure components ranging from 80mm to 1200mm, specifically including the production and delivery of repair clamps, taps, encapsulation collars, and hydrant clamps. Beyond the physical hardware, the provider is responsible for delivering essential technical documentation, including factory test certifications, O&M manuals, and detailed technical drawings. The contract requires that all repair clamps and collars be delivered with the necessary certifications to ensure compliance with infrastructure standards. The response deadline for this opportunity is January 11, 2027.

General Info

Documents

This scope was carved out of PRO005075.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Goods-Framework-Water Industry Fittings

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUnited Utilities Water Limited
ContactsNo contacts available
OfficeN/A
Organization / AgencyUnited Utilities Water Limited
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and manufactures repair and maintenance hardware for prime contractors on United Utilities Water Limited projects. Designs, manufactures, and delivers repair clamps, taps, encapsulation collars, and hydrant clamps for water infrastructure (80mm – 1200mm). Provides technical drawings, O&M manuals, and factory test certifications. Delivers repair clamps and collars with certification.

Similar Contracts

Same NAICS industry code

More opportunities from United Utilities Water Limited

Same awarding agency

NAICS: 332996
New
International
Goods-Framework-Water Industry Fittings
Solicitation # PRO005075
United Utilities Water Limited is seeking to establish tri-partite framework agreements for the supply of water industry fittings, specifically mechanical fittings for connection and maintenance. The scope covers the design, manufacture, delivery, and off-loading of fittings ranging from 80mm to 1200mm, as well as the provision of technical documentation and factory test certifications. The procurement is divided into five lots: Mechanical Couplings and Connection Fittings, Mechanical Repair and Maintenance Fittings, Ferrules and Saddles Fittings, Plastic Service Fittings, and Mechanical Bespoke and Fabricated Fittings. The total estimated value of the framework is 63 million pounds excluding VAT. The contract is scheduled to run from March 1, 2027, to March 1, 2032, with a potential five-year extension to March 2, 2037. Award decisions will be based on a weighted evaluation of commercial bids at 60 percent and technical capability at 40 percent. This is a two-stage competitive flexible procedure consisting of an initial Invitation to Tender and a Best and Final Offer phase. Work will be allocated via a call-off process, and pricing will be subject to an annual mechanism linked to market indices for metal, labor, and inflation. Bidders are limited to bidding for and being awarded a maximum of four lots.
Fabricated Pipe and Pipe Fitting Manufacturing

POSTED

about 9 hours ago

DEADLINE

in 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS