Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Medical Equipment Installation (LINAC, MR-LINAC, CT Simulator)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the on-site installation, calibration, and commissioning of specialized radiation therapy equipment, specifically focusing on Elekta and Siemens systems. The scope of work includes the setup of LINAC, MR-LINAC, and CT Simulator units to ensure they are fully operational and meet technical specifications. The project is managed by the Department of Veterans Affairs under the agency Pcac and will be performed in Lexington, Kentucky. Interested parties must respond by August 21, 2026, in accordance with the NAICS code 334510 for medical equipment installation.

General Info

Installation and commissioning of radiation therapy equipment for VA in Lexington, Kentucky.

Agency

Department Of Veterans Affairs → Pcac (36C776)View Agency

NAICS

334510 - Electromedical and Electrotherapeutic Apparatus ManufacturingView NAICS

Place of Performance

Lexington, KY, 40511, USA

Set-Aside

NONE

Documents

This scope was carved out of 36C77626Q0252.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Y1DA--Construction Industry Day - Construct New Radiation Oncology Building Minor Construction - Lexington Leestown 596-335

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Veterans Affairs → Pcac (36C776)
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On-site installation, calibration, and commissioning of Elekta and Siemens radiation therapy equipment including LINAC, MR-LINAC, and CT Simulator.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 236220
New
Federal
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation # 36C77626B0011_1
Solicitation 36C77626B0011, project number 519-371, is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for the construction of a new 10-bed Community Living Center (CLC) Cottage (Building 28) and associated site work at the Big Spring, Texas VAMC. The scope of work includes general construction, the installation of a complete and functional controls system, and security system adjustments and repairs. Key deliverables include software licenses, as-built drawings, and various testing reports. The project requires compliance with the 2010 ADA Standards for Accessible Design, the Buy American Act, and strict personnel vetting and background investigation requirements for all staff. Award will be made to the responsible bidder offering the most advantageous low price, provided they pass gates for SDVOSB certification, SAM registration, and VETS-4212 filing. The government intends to award the Base Bid (Line Item 0001), but may apply five deductive alternates in descending order if the base price exceeds available funds. The contractor must provide a detailed project schedule with updates every 30 days and execute a written warranty as a condition for final payment. Final acceptance is contingent upon a pre-final punch list correction and a formal final inspection attended by the contractor's management and government representatives.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 19 days
View Details