Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Medical Marijuana Land Use Ordinance – Phase IV

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves four encroachments in Humboldt County, California, authorized under the California Department of Fish and Wildlife’s Lake and Streambed Alteration Agreement EPIMS-HUM-61866-R1C, pursuant to Fish and Game Code Section 1602. The work includes repairing and decommissioning an access road failure, upgrading two existing stream crossings—one from a natural unimproved fill to an armored fill crossing and the other replacing a 36-inch culvert with a minimum 48-inch culvert—and decommissioning a failing small pond with an eroding impoundment berm. Activities encompass excavation, removal of outdated structures, installation of properly sized culverts, backfilling and compaction, and rock armoring using riprap with a mean diameter of 0.9 feet to prevent erosion and stabilize slopes at 2:1 or 3:1 gradients. All work aims to restore natural hydrologic connectivity, minimize sedimentation, and comply with environmental standards under California Code of Regulations Title 14, Section 15096, as documented through a Mitigated Negative Declaration under the California Environmental Quality Act. The total earth disturbance across all sites is limited to 5.8 to 23 cubic yards, with vegetative restoration required for disturbed areas and specific channel dimensions such as 5-foot width and 2.5-foot depth to be achieved where applicable. The project is administered by the County of Humboldt as the Lead Agency under CEQA, with oversight and permitting responsibilities held by the California Department of Fish and Wildlife. Primary points of contact include Steven Lazar of the Humboldt County Planning and Building Department and Joshua Gruver and Corrina Kamoroff of CDFW’s Northern Region, who manage environmental compliance, inspection, and approval processes. Though the project is referenced under a title related to a Medical Marijuana Land Use Ordinance Phase IV, the substance reflects infrastructure and ecological restoration activities, not cannabis cultivation or zoning enforcement. No federal contracting elements such as FAR clauses, solicitation numbers beyond PLN-12935-SP, contract type, pricing, evaluation factors, payment details, or offeror certifications are present. The place of performance is clearly defined within Humboldt County, with specific project locations tied to legal land descriptions and watersheds such as Bug Creek and the South Fork Eel River. Approval of the project was contingent upon compliance with CEQA conditions, and formal acceptance rests with Humboldt County and CDFW, with records maintained

General Info

Repair and decommission stream crossings, pond, and road in Humboldt County to restore hydrology and comply with environmental regulations.

Agency

California → Humboldt County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

approximately 11 miles southeast of the town of Garberville, CA

Set-Aside

NONE

Documents

(26)

Notice of Determination - Genolio Water Diversion Project

PDFnotice-of-determination

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV

PDFnotice-of-determination

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV - PLN-12490-CUP

PDFnotice-of-determination

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV

PDFnotice-of-determination

EPIMS-HUM-59942-R1 Notice of Determination for Schanzle Water Diversion Project

PDFnotice-of-determination

EPIMS-HUM-66524-R1C Notice of Determination

PDFnotice-of-determination

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV

PDFnotice-of-determination

EPIMS-HUM-68245_MND_ND_NOD

PDF

EPIMS-HUM-60005-R1C Heinz Water Diversion and Stream Crossings NOD

PDFnotice-of-determination

Notice of Determination for Murrish Water Diversions Project EPIMS-HUM-56585-R1C

PDFdetermination-and-findings

Notice of Determination for Schafer Stream Crossing Decommissioning and Pond Spillway Projects

PDFnotice-of-determination

EPIMS-HUM-62310-R1C Notice of Determination for Stoft Water Diversions Project

PDFdetermination-and-findings

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV

PDFnotice-of-determination

EPIMS-HUM-62034-R1C Singer Water Diversion Project Notice of Determination

PDFnotice-of-determination

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV

PDFnotice-of-determination

EPIMS-HUM-60497-R1C Notice of Determination for Folev Stream Crossing Project

PDFnotice-of-determination

EPIMS-HUM-61866-R1C Notice of Determination for Meador Road Failure Remediation Project

PDFnotice-of-determination

Notice of Determination - Boyd Water Diversion Project

PDFspecial-notice

EPIMS-HUM-58770-R1C Connolly Stream Crossing Project Notice of Determination

PDFnotice-of-determination

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV

PDFnotice-of-determination

Notice of Determination - Genolio Water Diversion Project

PDFnotice-of-determination

EPIMS-HUM-61213-R1C Shumaker Stream Crossings Notice of Determination

PDFnotice-of-determination

Notice of Determination for Medical Marijuana Land Use Ordinance Phase IV PLN-13295-SP

PDFnotice-of-determination

EPIMS-HUM-43726-R1C Hazell Water Diversion Removal Notice of Determination

PDFnotice-of-determination

EPIMS-HUM-55748-R1C Notice of Determination for Baker Water Diversion Project

PDFnotice-of-determination

EPIMS-HUM-63112-R1C Sanders Stream Crossings Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseAwarded
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Humboldt County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Humboldt County
Office AddressN/A
Contacts
Georgia HamerEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-HUM-68245-R1C), pursuant to Fish and Game Code section 1602, the project Applicant, Amaninder Singh. The Project is limited to three (3) encroachments. The encroachments are for water diversion from unnamed tributaries to Chamise Creek and the Eel River. Water is diverted for domestic use and irrigation. Work for the water diversion project will include use and maintenance of the water diversion infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 17 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS