Meloland Road Bridge Replacement at Central Drain; County Project Number 6838

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Imperial County Project Number 6838 involves the demolition and replacement of a deteriorated wooden bridge at Meloland Road over the Central Drain in Holtville, California. The scope of work includes replacing the existing bridge with an underground pipe crossing and repaving the approach road. This project is coordinated with the Imperial Irrigation District for de-watering and vegetation removal within the Central Drain, which is a critical drainage system for the El Centro urban area. The project is subject to strict environmental and regulatory compliance under CEQA and NEPA, including a Mitigation Monitoring and Reporting Program. Key requirements include adhering to Imperial County Air Pollution Control District regulations for dust emissions and maintaining construction noise levels below 55-60 dB within 50 feet of the source. Biological protections are mandated, including specific construction windows for maternity roosts from October 1 to February 28, a prohibition of activities within 500 feet of hibernacula, and a ban on construction between 30 minutes before sunset and 30 minutes after sunrise. Additionally, the project requires authorization from the California Department of Fish and Wildlife and adherence to state laws regarding the accidental discovery of human remains.

General Info

Imperial County to replace Meloland Road bridge over Central Drain near Holtville, California, in 2026.

Agency

California → Imperial County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

East Hudson Road, Holtville, CA, 92250

Set-Aside

NONE

Documents

(2)

IS23-0034 Meloland Road Bridge Replacement Final Initial Study & Mitigated Negative Declaration

PDFmitigated-negative-declaration

IS23-0034 Notice of Completion for Meloland Road Bridge Replacement

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Imperial County
Office AddressN/A
Contacts

Full Description

Show more
The County proposes to replace the existing bridge at Meloland Road over Central Drain. Meloland Road is a north-south minor collector road serving the surrounding agricultural community and the Holtville area via Evan Hewes Highway. The Central Drain is a critical drain maintained and operated by the Imperial Irrigation District for the entire El Centro urban area, and discharges directly into the Rositas Waste Drain approximately 900 feet downstream, and subsequently into the Alamo River, located 0.25 mile from Meloland Road.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Green Island Road Class I Project
Solicitation # TR16-0704
The City of American Canyon is soliciting bids for the Green Island Road Class I Project (TR16-0704), which involves the construction of a Class I bike path along the north side of Green Island Road from Commerce Boulevard to Paoli Loop Road. The scope of work includes earthwork, traffic controls, storm water pollution protection, the installation of the trail, thermoplastic striping, signage, and the rehabilitation of adjoining roadways such as Mezzetta Court, Jim Oswalt Way, Hanna Drive, and portions of Commerce Boulevard. The engineer's estimate for the project is 1,193,000 dollars. Bids are due by October 8, 2026, at 2:00 pm, and will be awarded to the lowest responsible bidder. Eligible bidders must possess a California Class A License and adhere to a Project Labor Agreement, state prevailing wage requirements, and Buy America standards for steel and iron products. Submission requirements include a bid security of 10 percent of the total bid amount, with the successful contractor required to provide 100 percent performance and payment bonds, as well as a 10 percent warranty bond. The project must comply with the 2025 Caltrans Standard Specifications and the 1995 City of American Canyon Standard Specifications. Final acceptance is contingent upon the completion of all work, the resolution of punch list items within 14 days of issuance, and the submission of all required warranties and manuals.
Public Works

POSTED

1 day ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS