Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Memaloose Island Stabilization 2024

Closed
W9127N24B0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 10 hours ago

DEADLINE

in about 20 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 10 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 15 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Hood River, OR, USA

Set-Aside

NONE

Documents

1

Memaloose Island Stabilization FY24 SOW

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts
Andrea Smothers

Full Description

Show more
1. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. Reponses to this Sources Sought announcement will be used by the Government to make business decisions and to inform potential future solicitations. The North American Industrial Classification Code (NAICS) for this requirement is: 237990 The related size standard is: $45M. Formal Sources Sought Response Due - 15MAY2024 at 3:00 pm PDT. 2. Project Background. The U.S. Army Corps of Engineers, Portland District (Corps) in cooperation with the Bonneville Power Administration, the Confederated Tribes of the Warm Springs Reservation, the Yakama Nation, the Confederated Tribes of the Umatilla Indian Reservation, and the Nez Perce Tribe (together, known as the Wana Pa Koot Koot Cooperating Group) propose to stabilize portions of a historic cemetery. The site is located on Memaloose Island in Wasco County, Oregon at approximately River Mile 178 of the Columbia River. The United States owns the project area and the Corps operates and maintains it as part of the Bonneville Lock and Dam Project. The Corps previously stabilized portions of Memaloose Island in 2011, and also identified new areas of erosion. Cultural artifacts and human remains have since been exposed and are vulnerable to looters. 3. Project Scope. Memaloose Island Stabilization 2024 a.The following information represents the project objectives: This effort includes stabilization of sands for approximately 7,000 sqft across 6 areas of erosion on Memaloose Island. The stabilization will consist of stacking soil filled bags wrapped with a geogrid in the identified areas of erosion, connecting the stacked bags to one another via double edged spikes, spreading specified seed mix on top of the placed bags, and planting specified plugs between and into the placed bags. Initial watering will be required, but ongoing irrigation will not be required. The work will occur in the fall months to coincide with ideal seeding and planting windows and to take advantage of fall rains. No equipment is permitted on Memaloose Island, including irrigation equipment and wheeled equipment such as wheelbarrows. All work must take place with manual labor. Mobilization of materials to Memaloose Island may be done via boat or helicopter. A staging area for helicopter picks will be provided at Memaloose State Park and two designated staging areas will be identified on Memaloose Island. Personnel may access Memaloose Island by boat. No eating, drinking, gum, or tobacco use may take place on Memaloose Island. Bathrooms may not be placed on Memaloose Island. Any breaks for eating, drinking, or use of a bathroom must take place on the crew boat or at facilities on shore. All work completed on Memaloose Island will be observed by a Tribal Monitor. b. Anticipated Construction Schedule: CENWP intends to advertise (07/2024) and award (09/2024) Construction Contract with estimated construction completion by the end of calendar year 2024. c. Estimated Construction Cost (ECC): The current ECC is between $250,000 and $500,000. Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude. [SAKCUC(1] d. Number and Type of Contracts: NWP contemplates awarding a single firm-fixed price contract. The acquisition strategy decision has not yet been determined. Maximum small business participation is being sought at both the prime and subcontracting levels. e. Anticipated Source Selection Process: The expected method to determine the best value to the government is IFB (Invitation for Bids). 4. Project Specific Constraints and Challenges: a. No equipment may be used on the island, to include items such as wheelbarrows. All work must be completed via manual labor means. b. No eating, drinking, tobacco use, gum, etc may take place on the island. All breaks that include the aforementioned must take place on a crew boat or shore-side (off island). c. Restrooms, job shacks, or other facilities may not be placed on the island. All facilities must be located on a crew boat or shore-side (off island). d. Mobilization of construction materials to the island has historically been completed via helicopter from a Government coordinated staging area at Memaloose State Park. Mobilization of construction materials via water may be possible and is not restricted, but should be carefully considered to ensure feasibility. e. Site access for crews has historically been completed via a crew boat with landing on the northern side of the island. A boat launch will not be provided by the Government and the Contractor may coordinate their own boat launch location that is most advantageous for their needs. f. Work must take place in October or November. 5. Questions for Industry: a. Is there anything in our SOW that would discourage you from bidding? b. Is there anything in our SOW that would cause enhanced pricing uncertainty? c. Are there any market conditions or industry practices that you feel the government needs to be aware of? d. Would any information assist in the understanding of and execution of the requirements? -Other questions as needed 6. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought - W9127N24B0008 Memaloose Island Stabilization 2024. Please email to Andrea Smothers, Contracting Officer, at andrea.k.smothers@usace.army.mil and Julia Henry, Contracting Specialist, at julia.b.henry@usace.army.mil, before 3:00 pm Pacific Standard time on 15 May 2024. Interested parties responses to this Sources Sought shall be limited to six (6) pages and should include the following information: a. Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID. b. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB). c. An explanation of the prime firm's capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope. d. A description of work performed under similar project constraints and challenges listed under paragraph 3. e. Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available): To be considered for a potential set aside strategy, provide a maximum of three (3), minimum of one (1), soil stabilization OR cultural site protection project(s). These project examples must be similar in size, scope and complexity to the work described in paragraph 3 of this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following: Project Title Contract Number Contract award date Customer name, phone number and email address Prime or Subcontractor Initial contract dollar value Final contract dollar value Initial contract completion date Final contract completion date Customer satisfaction The Government may verify information in CPARS or PPIRS. f. Firm's Joint Venture information if applicable - existing and potential. g. Firm's Bonding Capability. h. Firm's interest and the likelihood in bidding on the solicitation when it is issued. (Refer to planned advertise and performance dates) i. Responses to the government's questions in paragraph 5 and any other information the contractor feels the government needs to be aware of. 7. Disclaimer and Important Notes. a. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. b. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract. 8. Attachments: a. Statement of Work draft

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
The Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement project in Cascade Locks, Oregon, is a total small business set-aside procurement issued by the USACE Portland District. The project involves replacing a seismically deficient 248-foot swing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, shoulders, and a sidewalk. The scope includes partial demolition of the existing structure, construction of a concrete stub abutment anchored into rock and a south abutment supported by drilled shafts, and the development of approach roadways. Due to the requirement for continuous vehicular access, the work will likely be performed in phases and must adhere to strict environmental and seasonal restrictions, including specific in-water work windows for 2029 and 2030. The contract is a firm-fixed price agreement with a performance period of 1,295 calendar days from the notice to proceed. Key technical requirements include lead and asbestos removal, barge crane lifting near high-voltage power lines, and compliance with CMMC Level 1 cybersecurity standards. Specialized qualifications are required for ground anchors, jet grouting, and professional archaeological monitoring. The project is subject to rigorous quality control and inspection processes, including a three-stage sequence of punch-out, pre-final, and final acceptance inspections. Bidders must provide a bid guarantee and 100 percent performance and payment bonds. The final solicitation closing date was extended to October 29, 2026.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 484220
Federal
Pre-Solicitation Notice - Bonneville Dam Equipment Transport Blanket Purchase Agreement (BPA)
Solicitation # W9127N27A0001
The U.S. Army Corps of Engineers, Northwestern Division, Portland District intends to establish a Blanket Purchase Agreement (BPA) for commercial equipment transport services at the Bonneville Lock and Dam. This 100% small business set-aside, categorized under NAICS 484220, involves the on-call transport of light to heavy-haul equipment, ranging from 1.5 to 60 tons, between facilities on the Oregon and Washington shores via public highways. The agreement will span a five-year ordering period with an estimated annual volume of 60,000 dollars and a total potential value of up to 300,000 dollars. Selected BPA holders will be required to provide DOT-compliant vehicles and manage all route planning, including obtaining necessary permits from local, state, and federal authorities. Performance standards include a standard response time of 48 hours and a best-effort emergency response within 12 hours. For call orders under 2,500 dollars, selection will be based primarily on cost and availability with payment via credit card; orders exceeding 2,500 dollars will be competed among BPA holders and paid via electronic invoice. Contractors must maintain current insurance, adhere to FMCSA securement regulations, and submit a Quality Control Plan for government approval prior to the post-award conference.
Specialized Freight (except Used Goods) Trucking, Local

POSTED

14 days ago

DEADLINE

in about 23 hours
View Details
NAICS: 238220
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

19 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS