This Government Contract opportunity from North Carolina was posted on July 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
MEP Rough-In (Electrical, Plumbing, HVAC)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract outlines the rough-in installation of mechanical, electrical, and plumbing systems to support the operational layout and equipment requirements of Starbucks locations, including electrical conduits, plumbing lines, HVAC ductwork, and fire protection systems. This subcontract is scoped for coordination with existing building infrastructure to ensure seamless integration of utilities necessary for coffee preparation, refrigeration, ventilation, and safety compliance. The work must be completed in alignment with Starbucks standards and industry codes, with precise attention to sequencing and site-specific conditions. The solicitation was posted on July 2, 2026, with a response deadline of July 23, 2026, and is classified under NAICS code 238210 for building equipment contractors. It is administered by the North Carolina Office of University System Design and Construction, though specific performance locations and point of contact details are not provided. The contract is open for submission without set-aside provisions, and interested parties must respond through the public portal linked in the notice. All work is expected to facilitate efficient fit-out of multiple Starbucks units under a unified systems approach.
General Info
Agency
NAICS
Place of Performance
NC, USASet-Aside
Documents
This scope was carved out of 287-29139-CB.
The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.
East Carolina University
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from North Carolina → Unc - System Office Design/construction
Same awarding agency
