Merced Pavement Anchor Project

Forecast
19862State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Merced Pavement Anchor Project, identified by Permit No. 19853, involves the removal and replacement of the structurally deficient Mariposa Creek/Duck Slough Bridge (Bridge No. 39-0063) located on State Route 59 in Merced County, California. Situated approximately 4.3 miles south of the City of Merced, the project is led by Caltrans District 10 and overseen by the Central Valley Flood Protection Board. The scope of work includes the construction of a new 100-foot-long by 44-foot-wide single-span bridge featuring two 12-foot travel lanes, two 8-foot shoulders, and concrete guardrails. The new structure will consist of a concrete superstructure with concrete pile-supported abutments. To ensure long-term stability, the project includes the placement of rock slope protection at the abutments and banks for erosion control and scour protection, as well as necessary temporary works such as channel dewatering, falsework, and shoring. The project was approved under the California Code of Regulations, Title 23, Article 3, Section 6, following a Mitigated Negative Declaration prepared by the lead agency. The Central Valley Flood Protection Board determined that the project will not have significant environmental effects within its jurisdiction and has not imposed additional mitigation measures or monitoring plans. Related infrastructure work for this site includes the relocation of approximately 2,100 feet of 70 kV power line aerial crossings over Mariposa Creek to accommodate the bridge replacement. The administrative record for these determinations is available for public review, and the project was officially approved by the Board on September 26, 2025.

General Info

Caltrans will replace the Mariposa Creek Bridge on State Route 59 in Merced.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Full Description

Show more
Approval of Permit No. 19862, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To relocate approximately 2,100 feet of 70 kV power line aerial crossing over Mariposa Creek on Highway 59. The project also includes relocation of two PG&E poles more than 100 feet from top of the bank.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → Caltrans, District 10 - Stockton

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS