Metal Fabrication & Catwalk Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Metal Fabrication and Catwalk Installation involves the fabrication and installation of a replacement inlet catwalk for projects managed by the California Department of Water Resources. The scope of work requires the use of structural steel and galvanized grating to construct metal walkways, with hoisting cranes utilized for the final installation to ensure a fully secure structure. The project is classified under NAICS code 238120 and mandates strict adherence to CDFW mitigation measures. The primary objective is the delivery of a complete, installed catwalk system that meets all specified safety and structural requirements for the facility.

General Info

Subcontract for fabricating and installing a structural steel inlet catwalk for California DWR.

Agency

California Water Resources, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of COL-52026-R2.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Butte Slough Outfall Gates (BSOG) Repair Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs a replacement inlet catwalk for prime contractors on California Department of Water Resources facility projects. Fabricates metal grating and walkways and installs the catwalk structure at the inlet using structural steel, galvanized grating, and hoisting cranes. Must comply with CDFW mitigation measures. Delivers a fully installed and secure inlet catwalk.

Similar Contracts

Same NAICS industry code

NAICS: 238120
New
SLED
CAP26-0258
Solicitation # CAP26-0258
Solicitation CAP26-0258 is a stipulated sum contract issued by the Oklahoma Office of Management and Enterprise Services for the construction of a new roof deck support structure and roof replacement for Building 55A at the Oklahoma Department of Human Services Human Services Center in Oklahoma City. The project has an estimated cost of 1,250,000.00 dollars and a performance period of 270 calendar days. The scope of work includes the installation of structural support systems and roofing, with bidders providing a base bid and alternate pricing for either a Modified Bitumen or a Thermoplastic Polyolefin (TPO) roofing system. All work must adhere to the 2018 IBC, IEBC, ADA standards, and specific technical requirements for demolition, metals, and thermal protection. The contract will be awarded to the lowest responsible bidder based on responsiveness and the sum of the base bid and accepted alternates. Bidders must submit a completed bid form, a contractor qualification statement, and a bid security of five percent for bids exceeding 100,000.00 dollars. Awarded contractors are required to provide performance, payment, and defect bonds for 100 percent of the contract value. Project administration requires the submission of a key personnel list within 15 days of starting operations, and payments are processed via invoices submitted to the consultant, with specific requirements for off-site stored materials. Quality control is managed through the use of mock-ups and site inspections by a testing agency, though final acceptance rests with the owner.
State of Oklahoma, Division of Capital Assets Management, Construction & Properties

POSTED

1 day ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS