Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Metal Fabrication and Railing Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Pompano Beach Water Administration Utilities involves the fabrication and installation of metal structures and safety railings for water treatment projects. The scope of work includes the delivery and installation of aluminum railings, metal decking, and general metal fabrications utilizing post-installed concrete anchors. Technical requirements specify that all work must be supported by structural calculations and adhere to MIL-PRF-8625 standards for anodic coatings. Interested parties must respond by November 2, 2026, for this project categorized under NAICS code 332323.

General Info

Fabrication and installation of metal structures and railings for Pompano Beach water projects.

Documents

This scope was carved out of ITB27-001.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Water Treatment Plant Improvements Phase 1: Buildout of the Existing Nanofiltration Facility (State Revolving Fund)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Water Administration - Utilities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs metal structures and safety railings for prime contractors on City of Pompano Beach water treatment projects. Installs aluminum railings, metal decking, and general metal fabrications with post-installed concrete anchors. Requires structural calculations and MIL-PRF-8625 anodic coatings. Delivers installed aluminum railings and metal supports.

Similar Contracts

Same NAICS industry code

More opportunities from Florida → Water Administration - Utilities

Same awarding agency

NAICS: 237110
New
SLED
Water Treatment Plant Improvements Phase 1: Buildout of the Existing Nanofiltration Facility (State Revolving Fund)
Solicitation # ITB27-001
The City of Pompano Beach is soliciting bids for the Water Treatment Plant Improvements Phase 1: Buildout of the Existing Nanofiltration Facility. This project aims to expand the existing 10 MGD nanofiltration process to a 30 MGD capacity to ensure compliance with the United States Environmental Protection Agency's National Primary Drinking Water Regulation for per- and polyfluoroalkyl substances (PFAS). The base bid includes site work, yard piping, the construction of a new raw water booster pump station and pressure filter system, modifications to the membrane process, replacement of permeate flush and clean-in-place systems, and the addition of two degasifiers. An optional Additive Alternate A may include the replacement of five membrane units and the addition of another degasifier along with associated electrical and control improvements. Funded by the State Revolving Fund, the contract requires strict adherence to the Build America Buy America provision and the Consolidated Appropriations Act of 2014 regarding iron and steel products. The award will be granted to the lowest responsive and responsible bidder who demonstrates financial solvency and a track record of completing at least 20 million dollars in similar projects within the continental United States over the last 15 years. Bidders must provide a bid bond of at least five percent of the bid amount, and performance and payment bonds are required for projects exceeding 200,000 dollars. Comprehensive insurance coverage and compliance with various federal non-discrimination and drug-free workplace acts are mandatory. All work must be performed at the Pompano Beach Water Treatment Plant and meet detailed technical specifications and Ten State Standards for color coding.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS