Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Metal Flange Installation and Concrete Repair

Open
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Metal Flange Installation and Concrete Repair involves providing supplies and installation services for metal flanges and concrete patching for prime contractors on Triple A S.A. E.S.P. river discharge projects in Barranquilla, Colombia. The scope of work focuses on connecting new structures to existing ones using metal flanges and performing concrete resane to ensure a proper seal, ultimately delivering a connected and sealed structural interface. The project is categorized under NAICS code 238110 and is managed by Triple A S.A. E.S.P. The solicitation was posted on November 24, 2026, with a response deadline of November 30, 2026. There is no specified set-aside status for this contract.

General Info

Documents

This scope was carved out of 1000044908.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

WS599(872)2971 - SOLPED 10(00)044(908) Obras Civiles para la construcción de punto de conexión de la prolongación de la descarga de Colector de la Calle 76 en el Río Magdalena en el Distrito de Barranquilla

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 7 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom WS599(872)2971 - SOLPED 10(00)044(908) Obras Civiles para la construcción de punto de conexión de la prolongación de la descarga de Colector de la Calle 76 en el Río Magdalena en el Distrito de Barranquilla
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTriple A S.A. E.S.P.
ContactsNo contacts available
OfficeN/A
Organization / AgencyTriple A S.A. E.S.P.
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs a metal flange and performs concrete patching for prime contractors on Triple A S.A. E.S.P. river discharge projects in Barranquilla, Colombia. Connects new structures to existing structures using metal flanges and performs concrete 'resane' (patching/repair) to ensure a proper seal. Delivers a connected and sealed structural interface.

Similar Contracts

Same NAICS industry code

More opportunities from Triple A S.A. E.S.P.

Same awarding agency

New
International
WS599(872)2971 - SOLPED 10(00)044(908) Obras Civiles para la construcción de punto de conexión de la prolongación de la descarga de Colector de la Calle 76 en el Río Magdalena en el Distrito de Barranquilla
Solicitation # 1000044908
Triple A S.A. E.S.P. is soliciting bids for civil works to construct a connection point for the extension of the Calle 76 Collector discharge into the Magdalena River in the District of Barranquilla, Colombia. This abbreviated invitation to bid requires the selected contractor to complete the works within one month of the Public Order, with a delivery term of 30 calendar days. The evaluation process is based on an economic qualification criterion, with a tie-breaking priority given to the proponent offering the shortest time. Offers must be submitted exclusively in Colombian Pesos via the SAP Ariba Sourcing platform by November 30, 2026, and must utilize the mandatory Price and Quantities Annex to avoid disqualification. The contract mandates several insurance requirements, including a compliance bond and a salary and social benefits bond, both valued at 20% of the total contract value. Additionally, the contractor must provide comprehensive coverage for civil liability, patrimonial damages, and environmental pollution. Legal requirements for proponents include a current RUT, a Chamber of Commerce certificate valid for no more than 30 days, and a signed Ethics and Compliance Declaration. For critical tasks, a safety and health self-evaluation score above 85% is required. Triple A S.A. E.S.P. maintains the right to terminate the contract early without indemnity and may exclude proponents based on high-risk internal analysis regarding legal, reputational, or environmental impacts.

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
New
International
WS5998(522)856 Solped 10(00)044(862) - 12(00)006(479) Suministro y mantenimiento preventivo y correctivo de estructuras PRFV para las plantas de tratamiento de agua potable de TRIPLE A S.A. E.S.P
Solicitation # 1000044862
Triple A S.A. E.S.P. is soliciting bids for the supply and preventive and corrective maintenance of Glass Reinforced Plastic (PRFV) structures for its potable water treatment plants in Colombia. The scope of work includes the supply of materials, equipment, and certified scaffolding, as well as the fabrication of new PRFV elements and the repair or replacement of manholes and flanges. The contractor is required to provide a Health and Safety Supervisor and at least three exclusive work fronts to ensure timely execution. The contract has a performance period of twelve months starting from the signing of the commencement act. The award will be based on an economic qualification criterion, provided the bidder meets all economic, legal, and technical requirements. In the event of a tie, priority is given to the bidder based on the order of receipt of offers. Bidders must submit their economic proposals via the SAP Ariba Sourcing platform in a specific Excel format by December 1, 2026. Required documentation includes a Chamber of Commerce certificate, an ethics and compliance declaration, and an SG SST self-evaluation certificate with a score greater than 85% for critical tasks. Guarantees must be equivalent to 10% of estimated unit costs, and invoicing can be completed through physical submission or electronic channels. There is no specified set-aside status for this solicitation.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS