Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

WS599(872)2971 - SOLPED 10(00)044(908) Obras Civiles para la construcción de punto de conexión de la prolongación de la descarga de Colector de la Calle 76 en el Río Magdalena en el Distrito de Barranquilla

Open
1000044908International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Triple A S.A. E.S.P. is soliciting bids for civil works to construct a connection point for the extension of the Calle 76 Collector discharge into the Magdalena River in the District of Barranquilla, Colombia. This abbreviated invitation to bid requires the selected contractor to complete the works within one month of the Public Order, with a delivery term of 30 calendar days. The evaluation process is based on an economic qualification criterion, with a tie-breaking priority given to the proponent offering the shortest time. Offers must be submitted exclusively in Colombian Pesos via the SAP Ariba Sourcing platform by November 30, 2026, and must utilize the mandatory Price and Quantities Annex to avoid disqualification. The contract mandates several insurance requirements, including a compliance bond and a salary and social benefits bond, both valued at 20% of the total contract value. Additionally, the contractor must provide comprehensive coverage for civil liability, patrimonial damages, and environmental pollution. Legal requirements for proponents include a current RUT, a Chamber of Commerce certificate valid for no more than 30 days, and a signed Ethics and Compliance Declaration. For critical tasks, a safety and health self-evaluation score above 85% is required. Triple A S.A. E.S.P. maintains the right to terminate the contract early without indemnity and may exclude proponents based on high-risk internal analysis regarding legal, reputational, or environmental impacts.

General Info

Triple A S.A. E.S.P. seeks bids for civil works in Barranquilla, Colombia.

NAICS

N/A

Place of Performance

COL

Set-Aside

NONE

Documents

5
PDF, High priority: read this first8 pages · contract-document
High
PDF, High priority: read this firstrfp
High
PDF, Low priority1 page · other
Low
PDF, Low priority7 pages · instructions
Low
PDF, Low priority11 pages · other
Low

Read all 5 documents

Due in 7 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 7 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 5 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTriple A S.A. E.S.P.
Contacts1 person available
OfficeN/A

Full Description

Show more
Obras Civiles para la construcción de punto de conexión de la prolongación de la descarga de Colector de la Calle 76 en el Río Magdalena en el Distrito de Barranquilla.

More opportunities from Triple A S.A. E.S.P.

Same awarding agency

New
International
WS5998(522)856 Solped 10(00)044(862) - 12(00)006(479) Suministro y mantenimiento preventivo y correctivo de estructuras PRFV para las plantas de tratamiento de agua potable de TRIPLE A S.A. E.S.P
Solicitation # 1000044862
Triple A S.A. E.S.P. is soliciting bids for the supply and preventive and corrective maintenance of Glass Reinforced Plastic (PRFV) structures for its potable water treatment plants in Colombia. The scope of work includes the supply of materials, equipment, and certified scaffolding, as well as the fabrication of new PRFV elements and the repair or replacement of manholes and flanges. The contractor is required to provide a Health and Safety Supervisor and at least three exclusive work fronts to ensure timely execution. The contract has a performance period of twelve months starting from the signing of the commencement act. The award will be based on an economic qualification criterion, provided the bidder meets all economic, legal, and technical requirements. In the event of a tie, priority is given to the bidder based on the order of receipt of offers. Bidders must submit their economic proposals via the SAP Ariba Sourcing platform in a specific Excel format by December 1, 2026. Required documentation includes a Chamber of Commerce certificate, an ethics and compliance declaration, and an SG SST self-evaluation certificate with a score greater than 85% for critical tasks. Guarantees must be equivalent to 10% of estimated unit costs, and invoicing can be completed through physical submission or electronic channels. There is no specified set-aside status for this solicitation.

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS