Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

MF 26-2 Willamette Complex SR Road Maintenance

Awarded
1240BE26Q0071Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract award covers all line items, including optional ones, for comprehensive road maintenance services within the northern end of the Middle Fork Ranger District of the Willamette National Forest in Oregon, specifically addressing damage caused by the 2024 Willamette Complex fire. The contractor is responsible for furnishing all labor, supervision, equipment, materials, transportation, and non-personal services required to perform road surface repairs, drainage structure maintenance, vegetation control, and related operations in accordance with the Performance Work Statement and all applicable federal, state, and local regulations. Key work includes surface maintenance of Level 2 roads, hauling and placing surface materials, cleaning ditches and culverts, installing water bars and entrance berms, roadside brushing, and mobilization, with all services measured by completed and accepted units specified in the Schedule of Items. Work is limited to the period from award through October 30, 2026, and must be performed during standard government working hours Monday through Friday, excluding holidays. The contract is a Firm Fixed Price service award issued under a Total Small Business Set-Aside, with the solicitation number 1240BE26Q0071 and NAICS code 237310, administered by the Ochoco National Forest under the Department of Agriculture. Payment is strictly tied to the Schedule of Items through the Invoice Processing Platform (IPP), with invoices required within 10 business days of work completion and submission via CLINs. The contractor must submit multiple deliverables within five business days of award, including a personnel list, work schedule, quality control plan, and equipment list, along with ongoing activity reports tied to invoicing. Government oversight is conducted by a Contracting Officer’s Representative who performs inspections and monitors compliance but cannot alter contract terms. All equipment must be inspected and weed-free before entering federal lands, with spill kits required on-site and protective plating maintained. The contractor must comply with strict anti-discrimination and DEI certification requirements, certify adherence to federal laws including Buy American and trafficking-in-persons provisions, and ensure all subcontractors meet the same standards. Failure to meet any material requirement, including pricing all items or DEI compliance, may result in loss of payment eligibility or contract termination. The contract includes specific clauses governing whistleblower rights, electronic funds transfer, subcontractor payments, government property, security, and protest procedures, all of which supersede any conflicting terms.

General Info

Road maintenance and vegetation management for Willamette fire damage, small business set-aside.

Contract Value

$1,472,554

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Prineville, OR, USA

Set-Aside

SBA

Award Issued Date

Documents

3

Amendment 0001 to Solicitation 1240BE26Q0071

PDF, High priority: read this firstamendment
High

Amendment 002 - Solicitation 1240BE26Q0071

PDF, High priority: read this firstamendment
High

Solicitation 1240BE26Q0071 - MF 26-2 Willamette Complex SR Road Maintenance

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jun 16, 2026 to Jun 24, 2026. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Ochoco National Forest
Contacts1 person available
OfficePRINEVILLE, OR, 97754, USA
Office AddressPRINEVILLE, OR, 97754, USA
Contacts
Andrea Pollock

Full Description

Show more

AWARD WAS MADE FOR ALL LINE ITEMS INCLUDING OPTIONAL ITEMS.


The purpose of this contract is to maintain roads and manage vegetation growth to ensure safe and productive road conditions. Specifically, to repair damage to road surfaces and drainage structures during suppression of the 2024 Willamette Complex fire.



The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items and non-personal services necessary to provide road maintenance services to the Willamette NF road system.



The contractor shall provide services in accordance with (IAW) this Performance Work Statement (PWS), and all applicable federal, state and local laws and regulations.



The work shall be performed throughout the Northern end of the Middle Fork Ranger District of the Willamette NF in Oregon.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work encompasses site preparation, pipeline and utility installation, and surface improvements. Key activities include land surveying, site clearing, subsurface investigation, shoring, tunneling, boring, jacking, and micro tunneling. Additionally, the project requires the installation of steel casing, cathodic protection, valves, asphalt paving, landscaping, and the provision of traffic signs, signals, and lighting. Material requirements include ready mix supply, precast concrete, and manhole materials, alongside environmental support such as storm water pollution prevention. This solicitation is open to qualified subcontractors and suppliers, with a strong emphasis on Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise certified firms. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for responses is November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
Solicitation 08-1N8804 is a construction project issued by the California Department of Transportation for work on a state highway in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and involves the installation of hot mix asphalt, imported borrow, and signal and lighting systems. Key technical deliverables include the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and the integration of network equipment at the Inland Empire Transportation Management Center. The estimated cost of the project is 3,530,000 dollars, with bids required on a unit price basis. The contract mandates strict adherence to Buy America standards per 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing manufacturer certificates of compliance and ensuring hardware meets NEMA TS-1/TS-2 and IEEE 802.3 standards. Environmental and safety requirements include MASH compliance for highway safety features and certifications from a registered civil engineer or professional geologist regarding pH and lead levels in local materials. Additionally, the project requires the payment of prevailing wages as determined by the California Department of Industrial Relations and includes specific submittal requirements for Disabled Veteran Business Enterprise quotes. Final acceptance is contingent upon the successful completion of physical, performance, and functional tests, including specific network metrics such as latency and packet loss.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County About 8 Miles South Of Willits From 0.2 Mile North Of Ridgewood Ranch Road To 0.4 Mile South Of Black Bart Road
Solicitation # 01-OL3804
Solicitation 01-OL3804 is a cost-plus-time construction contract issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project is located approximately 8 miles south of Willits, extending from 0.2 mile north of Ridgewood Ranch Road to 0.4 mile south of Black Bart Road. With an estimated project cost of 13.7 million dollars, the scope of work includes roadway excavation, the placement of Hot Mix Asphalt and High Friction Surface Treatment, and the installation of asphalt concrete pavement and concrete barriers. Additional deliverables include the construction of concrete curbs, sidewalks, railings, fences, and the implementation of a lead compliance plan and erosion control measures. The contract is governed by 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Key compliance requirements include adherence to Buy America/Build America standards for manufactured products, the use of LCPtracker Pro for electronic certified payroll records, and strict environmental regulations regarding aerially deposited lead. Performance is subject to specific time constraints, notably that work within drainage channels is only permitted from June 15 to October 15. Bidders must comply with California Department of Industrial Relations prevailing wage rates and provide certifications for off-road diesel-fueled vehicle compliance. The response deadline for this solicitation is December 8, 2026.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Santa Barbara County Near Santa Ynez From 0.1 Mile North Of Route 246 To 0.1 Mile South Of Route 246
Solicitation # 05-1R5704
Solicitation 05-1R5704 is a unit price basis contract issued by the State of California Department of Transportation for infrastructure upgrades on State Highway 154 in Santa Barbara County. The project scope focuses on lighting, striping, and signage improvements from 0.1 mile north to 0.1 mile south of Route 246. Key technical requirements include micro-surfacing, tack coat application, thermoplastic traffic striping, and the installation of pavement markers. The work also involves relocating and installing roadside signs, modifying flashing beacon systems, and implementing erosion control through hydroseed and compost application. Specialized construction tasks include the installation of Cast-In-Drilled-Hole concrete piles, requiring a contractor with a proven track record of at least three similar foundation projects in the last five years. The project has an estimated value of 820,000 dollars and must be completed within 50 working days. Bids are due by 2:00 p.m. on November 19, 2026, via the Bid Express website and must include bidder security of at least 10 percent of the bid. Compliance requirements are stringent, including adherence to Buy America/Build America standards, DIR general prevailing wage rates, and environmental product declarations for concrete and asphalt. Quality control is managed through specific survey accuracy standards for horizontal and vertical coordinates and requires personnel with ACI Concrete Field-Testing Technician Grade 1 certification. The contract also emphasizes diversity through submittal requirements for Disabled Veteran Business Enterprise quotes and small business preferences.
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

POSTED

about 3 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS