Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MI 2622 - Moorpark Storm Drain Pipe (CMP) Lining and Repair at Gainsborough

Closed
2025/2026-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

3 days ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
ITB - Paving and Drainage Improvements for Bourgeois Road for Harris County Precinct 1
Solicitation # 26/0338
Harris County is soliciting bids for paving and drainage improvements on Bourgeois Road, from Cutten Road to West Richey Road, in Precinct 1. The project involves reconstructing approximately 5,500 linear feet of asphalt roadway into a 36-foot wide concrete curb and gutter three-lane section with a two-way left turn lane, as well as a boulevard section featuring two 25-foot concrete sections separated by a raised median. Key deliverables include the installation of a drainage system with concrete storm sewer pipes, boxes, and a detention basin, along with traffic signal modifications at Cutten Road and the installation of a new signal at Hollister Road. All work must adhere to the Texas Manual on Uniform Traffic Control Devices and Harris County Pavement Marking Details and Specifications. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation based on price and performance. Bidders must provide a bid guarantee and, upon award, furnish performance, payment, and potentially warranty or maintenance bonds. Compliance with Texas Government Code Section 2258 regarding prevailing wages is mandatory, and all manual laborers must be OSHA 10 certified. Contractors are required to implement a Storm Water Pollution Prevention Plan and follow strict packaging and labeling guidelines for materials, particularly for asbestos-containing waste and large diameter pipes. Bids must be submitted via the Bonfire portal by October 26, 2026, and must include a signed Bid Acknowledgement Form and Form 1295.
Harris County

POSTED

3 days ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The City of Thousand Oaks is soliciting bids for the rehabilitation of a 24-inch Corrugated Metal Pipe (CMP) storm drain system along Moorpark Road under Project No. MI 2622, identified as the Moorpark Storm Drain Pipe (CMP) Lining and Repair at Gainsborough. The scope encompasses steam-cured-in-place pipe (CIPP) lining of the existing CMP, installation of a new 30-inch storm drain manhole at the east end of the alignment, removal and replacement of remaining CMP east of the manhole with 18-inch Reinforced Concrete Pipe (RCP), and comprehensive surface restoration including new curb and gutter, concrete sidewalk, and asphalt paving. The project also includes repair of a pre-identified pavement depression on the west side of Moorpark Road, integrating corrective paving into the original infrastructure upgrade. The work is governed by technical specifications from Fuscoe Engineering, Inc., and must adhere to the Greenbook Standard Specifications, Caltrans plans, and California MUTCD standards. All materials must be delivered and stored per manufacturer guidelines, protected from damage and sunlight, and packaging waste must be fully recycled. The contract requires strict compliance with California Labor Code provisions, including prevailing wage rates determined by the State Department of Industrial Relations, and mandates adherence to OSHA and Cal-OSHA safety regulations, with full copies of the Construction Safety Orders kept on-site. The successful bidder must provide Performance and Payment Bonds issued by an admitted California surety, along with Commercial General Liability insurance of at least $5 million per occurrence and $10 million aggregate, maintained for the contract term and five years after completion. The project must be completed within 60 calendar days after issuance of the Notice to Proceed, with mobilization required within 10 days of the Notice of Award. Bidders must submit detailed technical documentation prior to construction, including CIPP installation procedures, design and flow calculations, material certifications, and CCTV inspection reports for both initial and final evaluations. Payment is structured as monthly progress payments of 95% of completed work, contingent upon submission of lien waivers and accurate cost accounting records. The City reserves the right to adjust quantities of unit-priced items by up to 25% without affecting unit rates and will award the contract to the lowest responsive and responsible bidder whose bid accurately reflects costs without uneven allocation. All bids must be submitted electronically through the City’s procurement portal by July 29, 2026, with no paper submissions accepted. Bidders are required to execute declarations under

General Info

Rehabilitate storm drain CMP line and adjacent pavement in Moorpark, California, by July 29, 2026.

Documents

4

MI_2622 Demolition Plans and Notes

PDF, High priority: read this firstplans-and-drawings
High

MI 2622 - Moorpark Storm Drain Pipe (CMP) Lining and Repair at Gainsborough RFP

PDF, High priority: read this firstrfp
High

MI 2622 Moorpark Storm Drain Pipe Lining and Repair - Final Specifications June 2026

PDF, High priority: read this firstspecifications
High

MI 2622 Moorpark Rd. Storm Drain Pipe Lining Vicinity Map

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works - CIP
Contacts2 people available
OfficeThousand Oaks, CA, 91362, USA
Office AddressThousand Oaks, CA, 91362, USA
Contacts
Mario MazedEngineering Assistant
Andrew BeckerPurchasing Supervisor

Interested Companies (12)

Insituform TechnologiesChesterfield, MO
ConstructconnectCincinnati, OH

See All 12 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This scope of work was identified following an inspection of the existing storm drain line. The proposed improvements will rehabilitate the storm drain infrastructure in alignment with Public Works maintenance priorities. During the design phase, staff observed a pavement depression adjacent to the storm drain alignment and incorporated pavement rehabilitation into the scope of work accordingly.

More opportunities from California → Public Works - CIP

Same awarding agency

NAICS: 237310
SLED
CI 5652 - Westlake Boulevard Landscape Improvements
Solicitation # 2025/2026-25
The City of Thousand Oaks is soliciting competitive bids for the Westlake Boulevard Median Improvements Project (CI 5652), a public works initiative to retrofit approximately 151,000 square feet of center medians between Thousand Oaks Boulevard and Allyson Street, including the median island at Valley Springs Drive. The scope of work encompasses the removal and replacement of existing median curb, gutter, and hardscaping, as well as catch basin grade modifications and new pavement markings. Additionally, the project requires the full replacement of the existing irrigation system, the installation of sustainable plantings, and a comprehensive plant establishment period. The engineer's estimate for the project is 7.4 million dollars. The total contract duration is 330 calendar days, consisting of a 240-day construction phase followed by 90 days of landscape maintenance and establishment. Bids must be submitted electronically via the OpenGov portal by October 5, 2026, at 3:30 PM, with a mandatory pre-bid meeting scheduled for September 15, 2026. The successful contractor must provide payment and performance bonds equal to 100 percent of the contract price and adhere to California prevailing wage laws. Payment will be issued through monthly progress payments at 95 percent of the work value, with the final 5 percent released within 60 days of the Notice of Completion. Compliance with the Storm Water Pollution Prevention Plan (SWPPP), ADA standards, and CARB regulations is required.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS