Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Commerce was posted on September 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sol Amendment #1 Miami HVAC Repair/Replacement

Closed
1333MF26Q0109Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
FY27 Plumbing & Gas Service @ Birmingham Air Guard
Solicitation # SRC0000037282
Solicitation SRC0000037282 is for plumbing and gas maintenance and repair services at the Birmingham Air Guard facility located at 5401 East Lake Blvd, Birmingham, AL 35217. The scope of work requires the vendor to provide all qualified personnel, equipment, tools, and supplies to perform diagnostics and repairs on water systems, including flush valves, leaks, and water heaters, as well as gas valves, lines, and controls. The primary period of performance is from October 20, 2026, through September 30, 2027, with the possibility of annual renewals for up to five years or until a total contract cost of 25,000 dollars is reached. The contract is governed by the State of Alabama Standard Terms and Conditions for Quick Quotes and requires vendors to be registered in the Alabama Buys portal for electronic submission. Key compliance requirements include E-Verify enrollment, certification of Alabama state and local tax remittance, and adherence to the Beason-H Ammon Alabama Taxpayer and Citizen Protection Act. Award evaluation is based on price reasonableness and cost realism, and the state may request professional licenses and certificates of insurance following the bid opening. All services must be coordinated with 117th ARW personnel upon arrival, completion, and departure from the facility.
Air MCA App 21B_Facilites Operations & Maintenance Agreement, State Military Department

POSTED

about 8 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a multi-building plumbing leak repair subcontracting project at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing heat pipe sections in the Administration Building and King Hall, including approximately ten linear feet of leaking heat pipe in the Wellness Department. All work must conform to the Massachusetts State Plumbing Code, International Plumbing Code, and other applicable federal, state, and local regulations. Contractors are responsible for daily site cleanup and the removal of all debris to an approved landfill. Bids are due by October 30, 2026, and must include a detailed cost breakdown of labor and materials, a proposed service schedule, and a quote valid for at least 60 days. Award selection is not based solely on the lowest price; ETR serves as the sole judge of the award. Required submission documents include a SAM.gov UEI number, active registration confirmation, Massachusetts licensing, a W-9, a signed Vendor Acknowledgement Form, and certificates of insurance. Depending on the project value, payment and performance bonds may be required for contracts exceeding 35,000 dollars. Compliance with the Davis-Bacon Act, Service Contract Act, and various FAR clauses regarding anti-lobbying and debarment is mandatory.
Westover Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning services at the Miami Job Corps Center in Florida. The period of performance runs from November 1, 2026, to October 31, 2027. This small business set-aside opportunity requires vendors to provide a detailed cost breakdown for non-emergency daytime labor, as well as emergency and weekend rates, excluding parts. Bids must be submitted on company letterhead by October 23, 2026, and must remain valid for 90 days. Award selection is based on the most responsible bidder, considering cost, licensure, experience, and the ability to meet insurance requirements. Eligible vendors must possess a valid Unique Entity ID and active SAM.gov registration to be considered for award. Mandatory requirements include holding all necessary business and employee licenses for the State of Florida and maintaining Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least 1 million dollars per occurrence. The contract is subject to Service Contract Act regulations, specifically Wage Determination No. 2005-2248, and Executive Order 13658, which mandates a minimum wage of 13.65 dollars per hour for covered workers through December 31, 2026. Additionally, contractors must adhere to strict center security protocols, including prohibited fraternization with students and mandatory security screenings. Payment terms are NET 30 days from the date of invoice.
Miami Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to remove and replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. This small business set-aside opportunity, categorized under NAICS 238220, requires the contractor to provide all labor, materials, equipment, and permits necessary for completion. Key deliverables include two sets of operation and maintenance manuals and manufacturer and installer warranties. Bids are evaluated based on overall best value, and a mandatory physical site visit and signature on the attendance roster are required prior to submission. The project is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates and fringe benefits, as well as compliance with OSHA safety standards and the provision of personal protective equipment for all site entrants. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price from a surety with at least an A- rating. Required submission documents include a detailed cost breakout, proof of insurance, three professional references, a completed MTC Supplier Packet, and a Unique Entity ID (UEI) number upon notice of intent to award. Payment is based on percentage of completion using AIA Document G702 and G703 forms, with weekly certified payroll submissions required.
San Diego Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The project scope involves inspecting, repairing, and replacing various components to ensure safe and functional operation, including replacing motors for fans 1, 2, and 4, installing missing components for fan 5, and relocating the thermostat for fan 3. Contractors must provide all necessary labor, materials, and equipment, ensuring all work adheres to applicable building codes, manufacturer requirements, and general HVAC practices. The contract will be awarded to the responsible offeror who provides a technically acceptable quote at the lowest price. Key submission requirements include a detailed cost breakdown with line-item pricing for fans 1 through 8 and separate pricing for system-wide replacements of actuators, relays, and thermostats. Offerors must be registered in the State of Kentucky, provide proof of bonding and insurance, and verify eligibility through the SAM portal. Quotes are due by October 30, 2026, following a pre-bid site visit held on October 5, 2026. Compliance with the Davis-Bacon Act and Certified Payroll Wage Rate requirements is mandatory. Contractors must submit weekly certified payroll records with every invoice to receive payment under net terms. Final payment is contingent upon satisfactory performance, a final acceptance inspection, and the delivery of lien releases from all subcontractors and suppliers. Additionally, the contractor must comply with OSHA and EPA regulations, maintain Material Safety Data Sheets for all chemicals used, and provide all necessary operating and maintenance manuals upon project completion.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 9 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the Men's Dormitory, Women's Dormitory, and Recreation Building, requiring a licensed fire sprinkler contractor to demolish existing distribution piping and failing compressors, install new infrastructure, and perform rigorous leak and operational testing. All work must adhere to NFPA 25 (2023 Edition) and other local, state, and national codes. The period of performance is 30 consecutive business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be evaluated based on overall best value. Prospective bidders must attend a mandatory site visit and provide a detailed cost breakout. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety company. This solicitation is set aside for HUBZone, Woman-owned, and Service-Disabled Veteran-owned small businesses. Compliance requirements include adherence to Davis-Bacon prevailing wage rates for building construction in Idaho, submission of weekly certified payroll reports, and completion of the SF 1413 Statement and Acknowledgement form. Contractors must also provide proof of insurance and comply with various Federal Acquisition Regulation clauses, including those regarding small business subcontracting plans for contracts over $900,000 and debarment disclosures for subcontracts exceeding $45,000. Final payment is contingent upon a joint substantial completion inspection, a final inspection, and the submission of all required closeout documentation, including operation and maintenance manuals.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation 1333MF26Q0109 is a total small business set-aside for a single-award, firm-fixed-price purchase order to provide HVAC repair and replacement services at the NMFS SEFSC Miami Campus. The scope of work includes the complete replacement of two packaged rooftop units and one split system, the repair or replacement of two additional split systems, and the replacement of defective fan-coil motors and strainer/check valves. The project has a performance period of 60 days from the date of award. All replacement equipment must be rated for outdoor coastal salt-air service and carry a Miami-Dade County Notice of Acceptance or equivalent Florida product approval for exterior-mounted units. The prime contractor is responsible for all licensing and bonding requirements in the state of Florida, as the government maintains no privity with subcontractors. While the work is classified as repairs and maintenance rather than construction, the contractor must ensure all roof penetrations are watertight and that equipment meets current federal minimum efficiency standards. Evaluation is based on technical approach, experience, and past performance, with non-price factors carrying more weight than price. Offerors must provide at least three relevant past performance references. Local municipality mechanical permits are not required as the facility is federally owned, and government acceptance will be conducted by the Contracting Officer or an authorized representative.

General Info

Small business set-aside for HVAC replacement and repair services at NMFS Miami Campus.

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

Not specified

Set-Aside

SBA

Documents

1

1333MF26Q0109 RFQ Combined Synopsis/Solicitation

PDF, High priority: read this first44 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce → NMFS Field Delegates
Contacts1 person available
OfficeKANSAS CITY, MO, 64106, USA
Office AddressKANSAS CITY, MO, 64106, USA
Contacts
Suzanne JohnstonContracting Officer

Full Description

Show more
Continued... Continuation page from block 14. The purpose of this amendment is to respond to the questions received for Solicitation No. 1333MF26Q0109. Combined Synopsis Solicitation: 1333MF26Q0109 Response to Questions: Q1 - Could you please confirm whether bid, performance, and payment bonds are required for this solicitation? A1 - The winning vendor must be licensed and bonded in the state the work is to be performed. The attached wage determination is for services not construction as we are considering this work to be repairs and maintenance not construction. Q2 - Could you please clarify whether we may use a subcontractor that is licensed and bonded in the State of Florida to satisfy this requirement, or whether the licensing and bonding requirements must be held by the prime contractor?¿ A2 - The government has no privity with a subcontractor therefore all requirements fall upon the primary contractor. Subcontractors must also be licensed and trained to work in the state. Q3 - The SOW states that vendor teams shall be licensed and bonded to work in Miami, Florida. May the prime contractor satisfy this requirement through its licensed and bonded HVAC subcontractor, or must the prime contractor independently hold the applicable HVAC license and bond? A3 - Please see responses above Q4 - For Evaluation Factors 2 – Experience and 3 – Past Performance, will NOAA consider the relevant experience, qualifications, and past-performance references of the prime contractor’s proposed HVAC subcontractor and key personnel? A4 - Both the prime and any proposed subcontractors should have the relevant past performance and experience working on this type of requirement. Q5 - For Tasks 4 and 5, should offerors price the quotation assuming complete replacement of both systems, or should anticipated repair and full-system replacement be priced separately? A5 - Complete replacement of both systems Q6 - For Task 8, should offerors assume replacement of all identified strainer/check valves for purposes of the firm-fixed-price quotation? If so, can NOAA provide the applicable valve sizes, types, and quantities? A6 - The government does not have documentation of the valve sizes, types, or quantities for these assemblies, and no as-built or submittal data is available. The scope of Task 8 is limited to inspection at the three locations identified and replacement of only those assemblies found leaking or non-operational. For pricing purposes, offerors shall assume one strainer/check valve assembly at each of the three locations, serving fan-coil equipment. Offerors should state any pricing assumptions in their quotation. Any condition materially different from the above will be addressed by the Contracting Officer. Q7 - Please confirm that offerors should provide one firm-fixed price for CLIN 0001 covering the complete 60-day requirement. The combined synopsis references monthly and annual pricing for base and option years, while the SOW appears to establish a single 60-day project requirement. A7 - There is only one CLIN in this action. Verbiage in the invoicing section is standard template language. Q8 - Is Miami-Dade County Notice of Acceptance or equivalent Florida Product Approval required for all replacement HVAC equipment under Tasks 1–5, or only for the Task 3 warehouse system? A8 - Miami-Dade County Notice of Acceptance or equivalent Florida product approval is required for all exterior-mounted replacement equipment, including the Task 1 and Task 2 packaged rooftop units and the outdoor condensing units under Tasks 3, 4, and 5. Indoor air handlers are not subject to this requirement. Q9 - Please confirm whether permits from the local municipality are required for the replacement of the HVAC equipment. A9 - The Miami campus is a federally owned facility. County mechanical permits are not required for work performed on this site. All work shall comply with the applicable standards listed in the SOW, including the National Electrical Code, ASHRAE standards, and Miami-Dade County product approval for exterior-mounted equipment. Q10 - Is a bid bond required with the proposal, or are performance and payment bonds required only from the successful contractor after award? A10 - Please see responses above Q11 - For the 4-ton and 2-ton mini-split units identified for diagnosis, repair, or replacement, based on the current condition of the equipment, we believe replacement is the most appropriate option. Please confirm whether we may submit pricing based on complete replacement of these units. A11 - See A5. Offerors shall price complete replacement of both the Task 4 and Task 5 systems, including the outdoor condensing unit and the matching indoor unit. Permitting Q12 - Does this project require a Miami-Dade County mechanical permit for each unit, or does NOAA handle permitting internally for work on this campus? A12 - See A9. A Miami-Dade County mechanical permit is not required for this work. Q13 - If a county permit is needed, who submits the application, the contractor or NOAA? A13 - Not applicable. See A9. Q14 - Is the Miami-Dade product approval (NOA) documentation required before we submit our quote, or only later at the time of permit application? A14 - Product approval documentation is not required with the quote. Offerors should identify the proposed make and model in their technical approach. Documentation of Miami-Dade Notice of Acceptance or equivalent Florida product approval shall be provided to the technical point of contact prior to installation. Q15 - Is a stamped engineer drawing required for the rooftop package unit replacements, or are manufacturer spec sheets sufficient since it is a same-capacity swap? A15 - Manufacturer specification and cut sheets are sufficient. Signed and sealed engineering drawings are not required for like-for-like capacity replacement. Q16 - Who schedules and conducts inspections once the work is complete, a county inspector or someone from NOAA? A16 - Because no county permit is required for this work, there will be no county inspection. Government acceptance will be performed by the Contracting Officer or authorized representative per CAR 1352.246-70. The contractor shall contact the technical point of contact to walk the punch list and close out the project per Deliverable 5 of the SOW. Roof Condition Q17 - The roof stands for the rooftop units appear structurally sound, with the equipment itself showing the corrosion. If we are replacing the units, can the existing roof stands be kept as-is without resealing or replacement, or is that required regardless? A17 - The SOW requirement stands. Tasks 1 and 2 require the existing roof stand be repaired or replaced as required to properly support the new unit. The contractor shall assess each stand and repair or replace as needed. Existing stands may be reused only where structurally sound and free of significant section loss. New ductwork must be installed and sealed to the roof in all cases. Site Access Q18 - Do our technicians need a badge or facility ID to access the campus for each visit? A18 - A PIV or CAC is not required. Contractor personnel will be granted visitor access. The contractor shall provide a list of personnel names to the technical point of contact in advance of each visit. Personnel must present government-issued photo identification on arrival. Q19 - Is there a laydown area near the roof that could be reserved for our crane when installing the RTUs on the Annex? A19 - Yes. A staging and crane setup area near the Annex can be made available. The specific location and duration will be coordinated with the technical point of contact after award. The contractor is responsible for protecting pavement and for maintaining clear fire lanes and emergency vehicle access at all times. Q20 - Is there power to the rooftop units, or would that require separate coordination? A20 - All five units identified in Tasks 1 through 5 are existing installed equipment, and existing electrical conditions were available for inspection during the September 9 site visit. The contractor shall reuse or modify existing circuits as required to serve the new equipment. Any electrical work necessary to connect and support the replacement equipment is the contractor's responsibility and shall be included in the firm-fixed price. The SOW requires the contractor to supply all labor, materials, equipment and supplies required to complete the listed tasks, and the government will furnish no resources toward completion of this requirement. Q21 - What are the allowed working hours on site, standard business hours only, or is night or weekend work permitted for the noisier tasks such as the rooftop units? A21 - Normal working hours are 7:00 am to 4:00 pm ET, Monday through Friday, excluding federal holidays. Work outside those hours may be permitted with advance written requests submitted through the Government POC. Approval depends on government escort availability after hours and is not guaranteed. Past Performance Q22 - Can our past performance references include general contracting projects of similar scale and complexity, not limited to HVAC-specific work, given our broader project management and delivery record? A22 - See A4. At least three past performance references are required. References should demonstrate experience installing and maintaining commercial HVAC systems comparable to those described in the SOW. General contracting references may be submitted in addition but will be evaluated on their relevance to this requirement. Coral Lab Coordination Q23 - Who should we contact directly to schedule the cooling outage for the Coral Lab, given that it supports live specimens? A23) this information is not relevant to the proposal. The government POC’s will be distributed at time of award Strainer/Check Valves (Task 8) Q24 - To confirm, is the scope for this task to inspect the strainer/check valves in rooms 319, 208, and the mechanical room, and only replace the ones found leaking or non-operational? A24 - Confirmed. Task 8 requires inspection at all three locations, with replacement of only those assemblies found leaking or non-operational. See A6 for pricing. Q25 - Regarding Task 8, the strainer/check valves in rooms 319, 208, and the mechanical room. Are there existing isolation valves on either side of the strainer/check valves that would allow us to shut off water flow locally for replacement, or would the lines need to be frozen to isolate the work area? A25 - Shutoff valves are available to isolate each of the three rooms. The government does not have documentation of whether local isolation exists immediately upstream and downstream of each strainer/check valve assembly. Line freezing is not anticipated. The contractor is responsible for the means of isolation and for draining and refilling any affected piping. Any planned outage shall be coordinated with the technical point of contact in advance. POST-SITE-VISIT CLARIFICATION QUESTIONS GENERAL / PROJECT-WIDE QUESTIONS Q26. Manufacturer / Brand Requirements Are replacement HVAC units required to be Rheem, or are equivalent manufacturers such as Carrier, Trane, Daikin, Goodman, or other approved manufacturers acceptable? A26 - The government is relying on proposals to recommend the best solution to meet the requirements Q27. Efficiency / SEER Requirements Is there a specific minimum SEER/SEER2 or other efficiency rating required for the replacement HVAC equipment? A27 - No specific SEER2 or efficiency rating is required beyond current federal minimum efficiency standards. Equipment shall meet applicable DOE minimum efficiency standards in effect at time of installation and, where available in the required configuration, ENERGY STAR or FEMP-designated efficiency levels consistent with NAO 217-104, Sustainable Facilities. Q28. Coastal / Salt-Air Protection – All Outdoor Equipment What specific manufacturer option, factory-applied coating, corrosion-protection treatment, or documentation is required for replacement equipment to be accepted as suitable for outdoor coastal/salt-air service? A28 - No specific manufacturer, product, or coating standard is required. All outdoor-mounted equipment shall be furnished with factory-applied or manufacturer-approved corrosion protection suitable for coastal salt-air service, applied in a manner that does not void or reduce the manufacturer's warranty. Offerors shall identify the proposed coastal protection package in their technical approach. Q29. Work Hours & Site Access Are there any restrictions on normal work hours, after-hours/weekend work, equipment deliveries, crane setup, rooftop lifts, traffic control, escorts, security access, or planned shutdowns? A29 - See responses to questions above Q30. Crane & Rigging Requirements For crane and rigging operations, are there any federal-facility approvals, staging-location restrictions, advance-notice requirements, or other site-specific requirements? A30 - See A19 and A21. No additional federal-facility approvals are required for crane and rigging operations. Staging location and timing shall be coordinated with the technical point of contact after award. Q31. Permits, Inspections & Submittals Please clarify which party will be responsible for permits, inspections, Miami-Dade/Florida product approvals, equipment submittals, and project closeout documentation. A31 - See responses to questions above Q32. Startup, Commissioning & Closeout What startup, commissioning, testing and balancing (TAB), refrigerant, electrical, warranty, manufacturer, or other closeout documentation will be required upon completion? A32 - Closeout is governed by the SOW deliverable schedule. Deliverable 5 requires the contractor to contact the technical point of contact to walk the punch list and close out the project within 52 days of award. The contractor shall provide manufacturer warranty documentation and equipment cut sheets for all installed equipment at closeout. No separate testing and balancing report or commissioning report is required. Q33. Specialty Subcontractor Requirements Do specialty subcontractors such as crane/rigging, sheet-metal fabrication, roofing, electrical, or other specialty trades require prior approval, credential submission, badging, or additional insurance documentation before performing work onsite? A33 - All companies performing work on this requirement shall be licensed, bonded and insured and have the relevant past performance to complete the necessary requirements. See above questions for credential and badging answers. Q34. Temporary Cooling / Outage Limits Other than the Coral Lab, are there any additional spaces with maximum allowable cooling-outage limits or that require temporary cooling while work is being performed? A34 - Other than the Coral Lab identified in Task 5, no spaces have maximum allowable cooling-outage limits and no temporary cooling is required. All outages shall be coordinated with the technical point of contact in advance. Q35. Controls / BAS Requirements For Tasks 1–5, are there any required BAS, thermostat, sensor, control, programming, or sequence-of-operation modifications beyond normal equipment reconnection that must be included in the HVAC scope? A35 - No building automation system integration, programming, or sequence-of-operation modification is required. The contractor shall reconnect to existing thermostats and controls, or furnish equipment-matched controls where the existing controls are not compatible with the replacement equipment. Q36. Workmanship Warranty Are there any specific minimum workmanship-warranty requirements for the HVAC subcontractor, separate from the manufacturer’s equipment warranties? A36 - The government does not hold privity with subcontractors. All requirements fall on the Prime contract holder. TASKS 1 & 2 – 5-TON AND 3-TON ROOFTOP UNITS Q37. Roof Stands / Roofing For replacement of the existing roof stands, should the HVAC contractor include a certified roofing contractor to open, restore, flash, and properly seal the roof? If so, is there a NOAA-approved roofer or any roof-warranty requirement we must follow? A37 - There is no NOAA-approved roofing contractor list and no requirement to engage a certified roofing contractor. The contractor is responsible for all roof penetrations, flashing, and sealing associated with the new units and ductwork, and for leaving all penetrations watertight. Q38. Ductwork Scope Does the new ductwork only need to connect from the new rooftop units to the existing roof penetrations, or must the new ductwork extend through the roof and connect to the existing ductwork inside the building? A38 - New ductwork shall extend from the new rooftop unit through the roof penetration and connect to the existing interior ductwork. The penetration shall be sealed weathertight. Replacement of existing interior ductwork is not in scope. Q39. Roof Stand Requirements Are there any specific structural, anchoring, engineering, material, or corrosion-protection requirements for the new roof stands? A39 - No stamped engineering or specific structural design is required. Roof stands shall be repaired or replaced as required to properly support the new unit, anchored in accordance with the manufacturer's installation requirements, and constructed of materials suitable for coastal salt-air exposure. See A15 and A17. Q40. Electrical Disconnects Are the existing three-phase disconnects to remain and be reused if properly rated and in good condition? If replacement is required, is that part of the HVAC contractor’s scope, or must it be performed by a licensed electrical contractor? A40 - Existing disconnects may be reused where properly rated for the new equipment and in

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS