Middle Wall Crack Stabilization, Montgomery Locks and Dam

Awarded
W911WN18B8001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Pittsburgh District, is conducting market research to identify capable sources for the stabilization of cracks in the middle lock wall at the Montgomery Locks and Dam in Monaca, Pennsylvania. This project falls under NAICS 237990 and involves critical repairs to concrete walls that support two lock chambers used for commercial and recreational navigation. The primary objective is to stop water leakage and ensure structural integrity through specialized engineering and construction methods. The scope of work includes the installation of approximately 45 high-capacity, galvanized steel stressing anchors, which must be core drilled horizontally and recessed into the wall without penetrating the backside. Following anchor installation, the contractor must perform pressure grouting to seal vertical and horizontal cracks and implement an instrumentation program to monitor the wall throughout construction. Work must be coordinated with the Lockmaster and other government contractors, adhering to strict 12-hour daily closure windows to minimize navigation disruptions. The estimated project duration is between 360 and 550 days.

General Info

Contract Value

$1,115,696.77

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Montgomery Locks and Dam, Ohio River 100 Montgomery Dam Road, MONACA, PA, 15061-2221, USA

Set-Aside

NONE

Award Issued Date

Documents

12

Amendment_0001.pdf

PDF

Amendment_0002.pdf

PDF

Attachment_1_Certified_Final_Specifications.pdf

PDF

Attachment_2_Certified_Plans_February_2018.pdf

PDF

Attachment_3_Reference_to_Certified_Plans.pdf

PDF

Attachment_4__Wage_Determination_4-20-18.pdf

PDF

Bid_Results.pdf

PDF

Pre-Bid_Contracting_Discussion.pdf

PDF

Site-Visit_Attendees.pdf

PDF

Technical_Specification_%28Revised%29_Section_01_35_00.00_08.pdf

PDF

Technical_Specification_%28Revised%29_Section_03_01_30.72_08.pdf

PDF

W911WN18B8001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts
Janie L. RoneyContract Specialist
Carole M. HouseholderContracting Officer

Full Description

Show more
The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves stabilization of two critical sections of the middle wall at Montgomery Locks and Dams, Ohio River, Pennsylvania. Montgomery Locks and Dam is located on the Ohio River near Monaca PA, at river mile 31.7 below the "Point" in Pittsburgh, PA. The locks are open to commercial navigation and recreation traffic, which are staffed and operated 24 hours a day, 7 days a week. The facility has two lock chambers with the locks located on the left descending bank. The land lock chamber has a size of 110'x600' and the river lock chamber has a size of 56'x360'. The existing middle lock wall supports the continual operation of the two lock chambers at the facility. The lock walls are constructed of concrete walls bearing directly on the rock for foundation support. Existing cracks are located with many areas of the lock walls. The cracks are orientated vertically and horizontally within the lock walls with water leakage occurring from the cracks. Required work requirements as part of the crack stabilization will include: 1. Installation of steel stressing high capacity rock/concrete anchors within the lock wall with the following specifications, a. The anchors will be around 20 to 22 feet long to prevent the anchor hole from penetrating past the back side of the lock wall which will be of upmost importance that the penetration does not occur. The nominal lock wall concrete width is 24 feet. b. The anchors will be required to be installed horizontally through the width of the lock wall at multiple horizontal planes within the lock walls. Approximately 45 ASTM A722 galvanized 1.25-inch diameter high capacity anchors are required with an expandable mechanical wedge on one end of the anchor and a bearing plate for seating the anchor stressing loads onto the concrete lock wall. c. Holes for the high capacity anchors will be required to be core drilled on a near horizontal arrangement from the vertical lock wall face within the land lock chamber. It is the Contractor's responsibility to determine the equipment, means and methods to best drill holes. It is anticipated the holes will be drilled off a temporary floating barge platform with floating plant, fixed or elevated platform or other methods that will achieve the approximate 2.5-inch hole diameter and horizontal alignment for the anchor. d. The anchor heads with the bearing plate will be required to be recessed within in a larger sized hole or recess opening at a nominal depth within the vertical lock wall. This recess will be filled with grout to protect and encapsulate anchor head. e. The anchors will be stressed at two different intervals and each of the anchor groups will be stressed according to a specified sequence pattern to provide to an initial stress and final lock off stress for each anchor. Stressing and grouting of the high capacity anchor could be done using a floating plant or another means for the Contractor to determine. 2. Scheduling of the anchor installation. a. The anchor installation must occur during specified multiple temporary lock closures in order to minimize the time the land lock chamber is closed. The Contractor must develop a detailed schedule to perform the work in a timely manner during these multiple temporary closures. It is anticipated the work must occur within a maximum 12-hour temporary daily lock closure period and within the planned Government maintenance 16-hour daily shutdown period scheduled to occur simultaneously over a part of the contract period of performance. Daily equipment set-ups and removals will be required as part of the contract work. A floating plant mooring area will be provided to the Contractor for performance of the contract work. 3. After the completion of the anchor installations, the existing cracks will be required to be pressure grouted to seal the water leakage. This pressure grouting will be performed from inside the existing gallery opening containing the lock service utilities and from vertical wall recesses opening using specialized grouting equipment. This will require the Contractor to select the appropriate grouting methods, pressures and techniques to successfully seal the cracks. The required pressure grouting will need to seal vertical and horizontal cracks within the concrete. Depending on the results of the initial grouting program, a secondary grouting of the cracks may be required. 4. The contract will require the installation of an instrumentation program to monitor, record and track the existing cracks within the lock wall during all period of the construction period. A qualified instrumentation monitoring individual shall be required as part of the contract. Construction work will occur in close proximity to commercial navigation and recreation traffic which will require close coordination of the construction activities with the Lockmaster at the facility. The locks are staffed and operated 24 hours a day, 7 days a week. Also, although the Government efforts will not directly impact the Contractor's work, the work will require close coordination with other Government Contractors and the Government repair fleet that will be working on other features at the facility and utilization of the land chamber for temporary closures. Disposal of excavated materials, concrete rubble and other construction waste material will be at a commercially permitted facility licensed to accept the waste or recycled if applicable. The magnitude of the project is between $1,000,000 and $5,000,000. This procurement will be advertised on an Unrestricted basis. The resulting award will be for one (1) Firm-Fixed-Price (FFP) contract. All responsible offerors are encouraged to participate. The work shall be completed 540 calendar days after written Notice to Proceed. The Invitation for Bid (IFB) will be issued approximately April 17, 2018, online through Federal Business Opportunities (FBO.gov), therefore, requests for hardcopies of the solicitation will not be honored. In order to receive notification of any amendments to this solicitation, interested vendors must register as an interested vendor on the FBO.gov website. If you are not registered, the Government is not responsible with providing notification of any changes to this solicitation. Contractors must be registered in the System for Award Management (SAM) before receiving a contract award (go to www.sam.gov to register). The NAICS for this procurement is 237990, "Other Heavy and Civil Engineering Construction" and the small business size standard is $36,500,000. ATTENTION: For companies new to the Army Corps of Engineers, Pittsburgh District, the link below will take you to a training Powerpoint slide presentation which will provide information essential to new contractors to help them navigate our bidding process. It will also help to make bid-no bid decision as it contains information on what will be required on a Post-Award performance basis - submittals, timelines, deadlines & milestones, necessary paperwork you need to supply, etc. This will help you capture everything needed in your bid so that there are no surprises later on. This training is not mandatory to be considered qualified to bid; it is meant as a means to assist you in becoming better prepared to work with the Corps of Engineers, Pittsburgh District. You can access the training using the link below: http://www.lrp.usace.army.mil/Portals/72/docs/SmallBusiness/Solving%20the%20Mystery%20-Understanding%20USACE%20Pittsburgh%20Contracting%20Process.pptx You may give feedback on the training package to the District's small business specialist using the email address of contact@example.gov

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for a 100% Small Business Set-Aside project to replace the structural standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project, categorized under NAICS 238160, has a rough estimate between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of the existing roof system, box gutters, scuppers, and lightning protection, as well as the refurbishment of up to 95 linear feet of cold-formed metal sub-framing. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall, sealing and insulating the concrete roof slab to R-30, and installing a new gutter system and a certified, non-penetrating Lightning Protection System compliant with LPI 175, NFPA 780, and UL 96A. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Key personnel requirements include a Project Superintendent and a Quality Control System Manager, each with at least five years of relevant experience, and a Site Safety and Health Officer meeting EM 385-1-1 qualifications. Performance and payment bonds are required if the contract price exceeds $150,000. Final acceptance is contingent upon successful watertightness testing per AAMA 501:2 procedures and the delivery of a UL Master Label or LPI Certificate of Conformance.
Roofing Contractors

POSTED

6 days ago

DEADLINE

in about 23 hours
View Details
NAICS: 237990
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS