This Solicitation opportunity from Ohio was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Midwest Campus Chilled Water Connection
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Project OSU-270001 involves the preparation of multiple buildings in the midwest campus area of The Ohio State University to utilize distribution chilled water from the Combined Heating Power plant. The scope includes the Agricultural Engineering building, several Veterinary Medical Center buildings, and various College of Food Agriculture and Environmental Sciences buildings. The selected Architect/Engineer will provide comprehensive services including project planning, engineering, and design to upgrade HVAC systems, air handling systems, and building automation system controls. A critical requirement of the design is a phased approach where chilled water connections occur first, followed by heating water connections, ensuring that work in occupied spaces is completed during the chilled water phase to eliminate deferred maintenance liabilities. The project will utilize a General Contracting delivery method with design documents partitioned into multiple packages. The A/E firm is responsible for the full project lifecycle, from program verification and schematic design to construction administration and electronic closeout via the e-Builder Project Management System. Key requirements include adherence to University Sustainability Standards, participation in the Encouraging Growth, Diversity and Equity program, and compliance with specific safety and professional liability insurance standards. The estimated construction budget is 8.3 million dollars, with a total project cost estimated at 10.6 million dollars. Professional services are scheduled to begin in October 2026, with substantial completion of all work targeted for March 2028.
General Info
Agency
NAICS
Place of Performance
Not specifiedSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project prepares existing buildings in the midwest campus area to receive and utilize distribution chilled water from the Combined Heating Power (CHP) plant. A future project will connect buidlings to distributed hot water from the CHP plant. The design documents shall include both chilled and heating water building modifications, phased for chilled water connects to occur first. Heating water conections shall not require chilled water re-work. All work in occupied spaces shall occur during the chilled water phase. The buildings included in this project are Agricultural Engineering; Veterinary Medical Center buildings (Vet Hospital, Vet Academic, Goss Lab, Sisson, Galbreath Equine); College of Food Agriculture and Environmental Sciences (CFAES) buildings (Howlett, Kottman, Howlett Headhouse, and Parker Food Science). Existing building equipment has reached the end of its useful life and no longer adequately supports the building’s operational needs. These connections will eliminate deferred maintenance liabilities.
Scope of Services: AE services shall include project planning, engineering and design services for the development of documents to upgrade and prepare buildings HVAC systems. Services will also include scope prioritization for repair with probable cost information. Delivery method for this project will be General Contracting. It is anticipated that the design documents will be partitioned into multiple packages. The AE design documents shall include planning and project phasing options for occupied multiple buildings. This project scope shall include, but is not limited to improving building HVAC systems, Air Handling Systems, and Building Automation System Controls. F110-02-2024-NOVPublish Date: [leave blank]Page 2 of 5 Construction Administration services shall include, but not limited to on-site visits: RFI, Submittal review, Change Management and Schedule review; Testing and Inspection. For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the Program of Requirements. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A – A/E Terms and Conditions Article 7.2.6. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. During the construction period, provide not less than 10 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. The project team (Owner / A/E / Contractor) will be required to utilize the University’s Project Management System, for all compatible services required by the University. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors, and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: •Previous experience compatible with the proposed project (e.g., type, size). •Demonstrated ability to meet Owner’s project vision, scope, budget, and schedule on previous projects. •Demonstrated experience with detailed project phasing and sequencing in occupied buildings. •Demonstrated ability with enhanced collaboration principles and processes. •Qualifications and experience of individuals directly involved with the project. •Approach to and success of using partnering and Alternative Dispute Resolution. •Demonstrated ability to meet Owner’s Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must be designed by the Lead Firm. F110-02-2024-NOVPublish Date: [leave blank]Page 3 of 5
More opportunities from The Ohio State University
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
