Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Midwest Guardrail Systems (MGS) Installation

Open
State & Local
Response DeadlineDue in 22 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Malibu, CA, 90265, USA

Set-Aside

NONE

Documents

This scope was carved out of 2087.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Latigo Canyon Retaining Walls Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 22 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Latigo Canyon Retaining Walls Rehabilitation Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Malibu
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Malibu
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs Midwest Guardrail Systems (MGS) and associated components for prime contractors on City of Malibu projects. Installs MGS rail, posts, end anchor assemblies, terminal system end treatments, delineators, and transitions to concrete barriers per Caltrans Standard Plans RSP AT742, AT741, and AT7313. Delivers a fully installed and anchored MGS guardrail system.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located in California with an estimated contract value between 18.5 million and 19.5 million dollars. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of small and large diameter steel and ductile iron pipes, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the installation of new slide gates and access platforms. The project also encompasses excavation, trench work, and surveying of key points around the reactors. This solicitation is designated as a Small Business set-aside, encompassing SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. Ranger Pipelines Incorporated is soliciting quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, concrete rehabilitation, electrical and instrumentation, welding, and crane services. The bid opening is scheduled for December 2, 2026, and all subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details
NAICS: 238990
New
SLED
Eclwrf Fence Replacement Project
Solicitation # 20261125033
The Eclwrf Fence Replacement Project is a lump sum contract issued by the West Basin Municipal Water District for the removal and replacement of perimeter fencing at the Edward C. Little Water Recycling Facility in El Segundo, California. The scope of work includes the phased removal of 2,030 linear feet of existing tubular steel fencing, the construction of 2,030 linear feet of new 8-foot high tubular steel fencing, and the installation of a 240-linear foot steel fencing extension on an existing CMU wall. Additional requirements include the replacement of 180 linear feet of privacy screening, the repair and painting of existing gates and fencing, and the management of temporary rental fencing. All new fencing must feature a black factory-applied polyester powder coating with a minimum film thickness of 2.0 mils, and buried hardware must be 316 stainless steel with bitumastic waterproofing. The project must be completed within 150 calendar days from the Notice to Proceed, with a baseline schedule due within 30 days of contract execution. Bids are evaluated primarily on the lowest price, though the District considers bidder qualifications, financial ability, and compliance with requirements. Bidders must submit electronic bids via OpenGov by December 22, 2026, including a bid bond of at least 10 percent of the bid amount, a vendor reference form, and CARB Certificates of Reported Compliance. The contract is a public work subject to state prevailing wage rates and requires adherence to Cal/OSHA and local health guidelines. There is no specified set-aside status for this solicitation.
West Basin Municipal Water District

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → City of Malibu

Same awarding agency

NAICS: 237310
New
SLED
Latigo Canyon Retaining Walls Rehabilitation Project
Solicitation # 2087
The Latigo Canyon Retaining Walls Rehabilitation Project, solicitation number 2087, is a public works project issued by the City of Malibu, California. The scope of work involves the rehabilitation of retaining walls and guardrails along Latigo Canyon Road, specifically requiring the demolition of existing Midwest Guard Rail Systems (MGS) and retaining wall lagging, followed by the installation of new MGS and precast concrete lagging. Additional requirements include the construction of new asphalt concrete dikes, excavation, grading, clearing and grubbing, and the implementation of traffic control measures. Technical specifications mandate that precast concrete lagging must have a minimum compressive strength of 4,000 PSI at 28 days and conform to severe exposure requirements. The project must be completed within 130 consecutive working days. The contract will be awarded to the lowest responsible bidder. Eligible bidders must hold a State of California Class A or Class C12 license and be registered with the California Department of Industrial Relations. Required bid documentation includes a construction bid, bidder's bond, non-collusion affidavit, and a debarment and suspension certification per Title 49 CFR Part 29. The awarded contractor must provide a faithful performance bond and a labor and materials bond, each for 100% of the contract value, and maintain them for one year after project acceptance. Compliance with California Labor Code prevailing wage requirements and the provision of worker's compensation, general liability, and automobile liability insurance are mandatory. Bids are due by 3:30 p.m. on December 17, 2026.
Highway, Street, and Bridge Construction

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS