Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MILITARY CONSTRUCTION PROJECT (MILCON) P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA

Closed
N6247024R0062Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 10 hours ago

DEADLINE

in about 20 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 10 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 15 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract involves a military construction project focused on the modernization of Dry Dock 3 at the Norfolk Naval Shipyard located in Portsmouth, Virginia. This design-bid-build project, identified as MILCON P1062, is being managed by the Department of Defense through the Naval Facilities Systems Command Atlantic (Navfacsyscom Atlantic) office in Norfolk, Virginia. The solicitation number for this pre-solicitation notice is N6247024R0062, and the project falls under the NAICS code 237990, which covers specialized construction activities. The key objective is to upgrade and enhance the infrastructure of the dry dock to support naval operations and maintenance more efficiently. Points of contact for this project are Daniel Rocha and Stephanie Wray, both reachable via email and telephone, who can provide further information and assistance. The contract is currently in the pre-solicitation phase, meaning that interested parties can review details and prepare for the upcoming bidding process. The place of performance is strictly at the Norfolk Naval Shipyard in Portsmouth, Virginia, affirming the military and strategic significance of the project. Further details and updates regarding this opportunity can be accessed through the provided online workspace.

General Info

Military construction contract for Dry Dock 3 modernization at Norfolk Naval Shipyard, Portsmouth, Virginia.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Portsmouth, VA, 23709, USA

Set-Aside

NONE

Documents

82

1806701-DWG-6of15 - Demolition and Section Drawings

PDF, High priority: read this firstspecifications
High

Amendment 0003 to Solicitation N6247024R0062

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation N6247024R0062

PDF, High priority: read this firstamendment
High

Amendment 0008 to Solicitation N6247024R0062

PDF, High priority: read this firstamendment
High

Amendment 0009 to Solicitation N6247024R0062

PDF, High priority: read this first25 pages · amendment
High

Appendix A2 - Additional Reference Record Drawings

PDF, High priority: read this firstspecifications
High

Appendix A2 - Additional Reference Record Drawings

PDF, High priority: read this first11 pages · specifications
High

Appendix B1 - Historical Geotechnical Data (Norfolk Naval Yard)

PDF, High priority: read this first246 pages · specifications
High

Appendix I - Project Permits: Dry Dock 3 Modernization

PDF, High priority: read this first18 pages · specifications
High

Attachment AF: DD3 EPA Schedule

PDF, High priority: read this first2 pages · specifications
High

Attachment AG - 1806701 Amendment 0004 Drawing Notes

PDF, High priority: read this firstspecifications
High

Attachment B - Past Performance Questionnaire (Form PPQ-0)

DOCX, High priority: read this first6 pages · past-performance
High

Attachment C - Construction Experience Project Data Sheet

DOCX, High priority: read this first2 pages · past-performance
High

Attachment D - Historical Small Business Utilization (N62470-24-R-0062)

PDF, High priority: read this first6 pages · past-performance
High

Attachment E - Small Business Participation Commitment Document (SBPCD)

PDF, High priority: read this first3 pages · sbpcd
High

Civil Utilities Plans - Areas 103, 104, 105, 106

PDF, High priority: read this firstspecifications
High

Criteria for Denying Access to Navy Installations

PDF, High priority: read this first1 page · specifications
High

Davis-Bacon Act Wage Determination VA20250001 - Virginia Heavy Dredging

PDF, High priority: read this firstwage-determination
High

DD3 RFP Site Visit Handout

PDF, High priority: read this firstspecifications
High

Dry Dock 3 Modernization Award-Fee Plan

PDF, High priority: read this first14 pages · award-fee-plan
High

Dry Dock 3 Modernization - Civil Demolition and Erosion Control Plan (Areas 103 & 104)

PDF, High priority: read this first44 pages · specifications
High

Dry Dock 3 Modernization - Civil Demolition and Erosion Control Plan (CD110 & CD111)

PDF, High priority: read this first22 pages · specifications
High

Dry Dock 3 Modernization - Construction Phasing Plan and Structural Elevation

PDF, High priority: read this first34 pages · specifications
High

Dry Dock 3 Modernization - Electrical Telecommunications Plans (ET101-ET103)

PDF, High priority: read this first31 pages · specifications
High

Dry Dock 3 Modernization - Elevations and Structural Demolition Plans

PDF, High priority: read this first5 pages · specifications
High

Dry Dock 3 Modernization - Fire Protection Legend Notes and Abbreviations

PDF, High priority: read this first40 pages · specifications
High

Dry Dock 3 Modernization - Miscellaneous Sections and Details (S-570)

PDF, High priority: read this first43 pages · specifications
High

Dry Dock 3 Modernization - Power Plan Roof and Control Levels

PDF, High priority: read this first48 pages · specifications
High

Dry Dock 3 Modernization - Prestressed Floor Panel Details

PDF, High priority: read this first48 pages · specifications
High

Dry Dock 3 Modernization - Price Schedule

PDF, High priority: read this firstspecifications
High

Dry Dock 3 Modernization - Price Schedule AMD0002

PDF, High priority: read this firstamendment
High

Dry Dock 3 Modernization - Structural Elevations S-203, S-204

PDF, High priority: read this first47 pages · specifications
High

Dry Dock 3 Modernization - Structural Interior Design (SID) Package

PDF, High priority: read this firstspecifications
High

Dry Dock 3 Modernization - Title Sheet and Index of Drawings

PDF, High priority: read this first19 pages · specifications
High

Dry Dock 3 Repair and Modernization FF&E Cost Estimate and Pricing Request

PDF, High priority: read this first22 pages · rfq
High

Electrical Legend and General Notes - 1806701-DWG-13of15

PDF, High priority: read this firstspecifications
High

Hazardous Materials Inspection Report - NNSY Dry Dock #3

PDF, High priority: read this firstspecifications
High

Individual Small Business Subcontracting Plan - N62470-24-R-0062

PDF, High priority: read this firstsubcontracting-plan
High

Mechanical Electrical Plumbing Fire Protection - General Notes and Symbols

PDF, High priority: read this first48 pages · specifications
High

MIL-DTL-29229B: Switches and Frogs, Track, Fabricated, for Portal Cranes

PDF, High priority: read this first16 pages · specifications
High

N6247024R0062 Amendment 0001

PDF, High priority: read this firstamendment
High

N6247024R0062 Amendment 0005

PDF, High priority: read this firstamendment
High

N6247024R0062 Amendment 0007 - PLA RFI

PDF, High priority: read this first3 pages · amendment
High

N62470-24-R-0062: P1062 Dry Dock 3 Modernization at Norfolk Naval Shipyard

PDF, High priority: read this first79 pages · ifb
High

Naval Facilities Engineering Command - Manhole Laydown EMH175

PDF, High priority: read this firstspecifications
High

NNSY Drydock Closures - Appendix B2 Historical Geotechnical Data

PDF, High priority: read this firstspecifications
High

NNSY OSHE Program Manual II-25 Rev A - Man-made Vitreous Fibers

PDF, High priority: read this first305 pages · specifications
High

Norfolk Naval Shipyard Dry Dock 3 Evaluation of Sediment Quality Final Report

PDF, High priority: read this firstspecifications
High

Norfolk Naval Shipyard Dry Dock 3 Modernization - Mechanical Details M-551

PDF, High priority: read this first70 pages · specifications
High

Norfolk Naval Shipyard Section 34 11 00 Railroad Track and Accessories

PDF, High priority: read this first46 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

19 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 20, 2024 to Jul 8, 2024. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 8, 2024 to Jul 30, 2024. The notice description changed.

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 8, 2025 to Jun 6, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jun 6, 2025 to Jun 18, 2025.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 18, 2025 to Jun 25, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 25, 2025 to Jun 30, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Atlantic
Contacts2 people available
OfficeNORFOLK, VA, 23508-1278, USA
Office AddressNORFOLK, VA, 23508-1278, USA

Full Description

Show more
Amendment 0009 is issued to: 1. Extend the proposal due date. 2. Respond to PPIs. 3. Revise the Specifications 4. Revise the Drawings 5. Provide Attachments 6. Revise the Solicitation. 7. Revise FAR 52.211-12 Amendment 0008 is issued to: 1. Respond to PPIs. 2. Revise Specifications. 3. Revise Drawings. 4. Provide attachments. Amendment 0007 is issued to request information from industry. Amendment 0006 is issued to: 1. Extend the proposal due date. 2. Respond to PPIs. 3. Provide attachment. 4. Revise the Solicitation. 5. Revise FAR 52.211-14 Amendment 0005 is issued to: 1. Respond to PPIs. 2. Revise Specifications. 3. Revise Drawings. 4. Provide attachment. Amendment 0004 is issued to: 1. Extend the proposal due date. 2. Set cut-off date for PPIs. 3. Respond to PPIs. 4. Revise Specifications. 5. Revise Drawings. 6. Provide attachments. 7. Revise the Solicitation Amendment 0003 is issued to: 1. Respond to PPIs. 2. Revise Specifications. 3. Revise Drawings. 4. Provide attachments. 5. Revise the Solicitation. 6. Add FAR Clause 52.216-4 Economic Price Adjustment-Material Amendment 0002 is issued to: 1. Extend the proposal due date. 2. Respond to PPIs. 3. Revise Specifications. 4. Revise Drawings. 5. Revise the solicitation. 6. Provide clause revisions. 7. Provide attachments. Amendment 0001 is issued to incorporate the follow ing: 1. Provide Site Visit Information 2. Provide attachments 2. Insert FAR Clause 52.223-23, Sustainable Products and Services Refer to attachment labeled N6247024R0062 for the Solicitation document.

More opportunities from Department Of Defense → Navfacsyscom Atlantic

Same awarding agency

NAICS: 236220
New
Federal
Navy Child Development Centers (CDC) Industrialized Construction (IC) Projects via Other Transaction Authority (10 U.S.C. § 2808a)
Solicitation # N6247027R0003
The Department of the Navy, through Navfacsyscom Atlantic, is seeking commercial vendors to provide Industrialized Construction solutions for the modernization of 11 Child Development Centers. This effort is being conducted via Other Transaction Authority under 10 U.S.C. 2808a to leverage advanced manufacturing methods such as volumetric modularity hybrid or Kit of Parts. The primary objectives are to reduce overall design and construction costs by at least 20 percent and accelerate delivery timelines by 30 percent or more compared to traditional construction methods. Proposed structures must be capable of being designed, reviewed, and approved within a 9 to 12 month timeframe while meeting or exceeding DoD Unified Facility Criteria and Whole Building Design Guide standards. The acquisition process consists of two phases, beginning with a white paper submission due by November 6, 2026. Vendors must demonstrate relevant experience by detailing at least three completed industrial construction commercial projects from the last 10 years valued at $25 million each, or three institutional projects exceeding 25,000 square feet. The government will use these white papers to short-list vendors for a second phase involving a Request for Project Proposal, where full proposals will be evaluated for best value based on expanded technical approaches, detailed price and schedule estimates, and data rights. Successful awardees must comply with the Buy American Act, Davis Bacon Act, Miller Act, and Cybersecurity Maturity Model Certification.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS