This Solicitation opportunity from Department Of The Interior was posted on June 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION

Awarded
140L1725R0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This solicitation pertains to a campground expansion and improvement project at the Mill Creek Campground in Hinsdale County, Colorado, managed by the Bureau of Land Management. The project involves site work, road and parking construction, installation of precast concrete toilets, campsite development, and bridge deck maintenance, with work scheduled to be completed within 365 days of the Notice to Proceed. The project is estimated to cost between $250,000 and $500,000 and is designated as a Total Small Business Set-Aside under NAICS code 237990, encouraging participation from various small business sub-categories, including small disadvantaged, woman-owned, service-disabled veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. Bidders are required to submit a comprehensive response including a signed SF1442 form, Schedule B pricing, a bid bond of 20%, and technical documentation by June 16, 2025. The contract will be a firm fixed-price type, with award based on price and other factors. The work schedule is Monday through Friday, with potential pauses during snow or snowmelt periods due to the high elevation of approximately 9,500 feet. Pre-bid site visits are scheduled for May 16, 2025, and all interested parties must be actively registered in SAM.gov. The primary contracting officer is Courtni Strickland, reachable via email at [email hidden].

General Info

BLM contract for Mill Creek Campground improvements, small business set-aside, $250K-$500K, 365 days.

Contract Value

$489,500

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

COUNTRY RD 30, Lake City, CO, 81235, USA

Set-Aside

SBA

Award Issued Date

Documents

20

A06 Revised Drawings - Picnic Table, Fire Ring, and Food Storage Locker

PDF, High priority: read this first1 page · specifications
High

Amendment 0005 - 140L1725R0002 Mill Creek Campground Expansion

PDF, High priority: read this first2 pages · amendment
High

B13 Amendment Summary 0002

PDF, High priority: read this first5 pages · amendment
High

Bid Schedule - Mill Creek Campground Expansion and Improvement

PDF, High priority: read this first1 page · bid-schedule
High

Mill Creek Campground Expansion and Improvement - Basis for Award

PDF, High priority: read this first1 page · specifications
High

Mill Creek Campground Expansion and Improvements - Design Plans

PDF, High priority: read this first13 pages · specifications
High

Mill Creek Campground Expansion and Improvements - Drawings

PDF, High priority: read this first13 pages · specifications
High

Mill Creek Campground Expansion and Improvement Specifications

PDF, High priority: read this first42 pages · specifications
High

Mill Creek Campground Improvements - Pre-Bid Q&A Update 0004

PDF, High priority: read this first1 page · q-and-a
High

Sol_140L1725R0002_Amd_0003 - Mill Creek Campground Expansion

PDF, High priority: read this first2 pages · amendment
High

Sol 140L1725R0002 Amendment 0001 - Mill Creek Campground Expansion

PDF, High priority: read this first48 pages · amendment
High

Sol_140L1725R0002 Amendment 0005 - Mill Creek Campground Expansion

PDF, High priority: read this firstamendment
High

Solicitation 140L1725R0002 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

Solicitation 140L1725R0002 Amendment 0004 - Mill Creek Campground Expansion

PDF, High priority: read this first2 pages · amendment
High

Solicitation 140L1725R0002 - Mill Creek Campground Expansion

PDF, High priority: read this firstifb
High

Solicitation 140L1725R0002 - Mill Creek Campground Improvements

PDF, High priority: read this first44 pages · rfp
High

Wage Determination C020250003 - Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

B11 Pre-Bid Attendees List

PDF, Low priorityindustry-day
Low

B11 Pre-Bid Questions and Answers 0002

PDF, Low priority3 pages · q-and-a
Low

Mill Creek Campground Improvements - Pre-Bid Q&A (140L1725R0002)

PDF, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Apr 1, 2025 to May 30, 2025. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline time changed from 9:00 PM UTC to 9:00 AM UTC on Jun 16, 2025. The notice title changed. The notice description changed.

Notice updated

Response deadline time changed from 9:00 AM UTC to 9:00 PM UTC on Jun 16, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline time changed from 9:00 PM UTC to 11:00 PM UTC on Jun 16, 2025. The notice description changed.

Notice updated

Response deadline changed from Jun 16, 2025 to Jun 18, 2025. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Colorado State Office
Contacts1 person available
OfficeLakewood, CO, 80225, USA
Office AddressLakewood, CO, 80225, USA
Contacts

Full Description

Show more
BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION AND IMPROVEMENTS The purpose of this modification is to add updated pre-bid questions. CAD design files will be available after the award. The due date is June 16, 2025 5pm MD. NOTE: This is a TOTAL SMALL BUSINESS SET-ASIDE. This is a solicitation announcement for a campground expansion project located at the Bureau of Land Management Mill Creek Campground in Hinsdale County, Colorado. Mill Creek Campground is 13.6 miles South of Lake City, CO on County Road 30. Mill Creek Campground Web Site: https://www.blm.gov/visit/mill-creek-campground-co Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION The work includes, but is not limited to; site work, road and parking area construction, precast concrete toilet installation, campsite construction, and bridge deck maintenance. 1.2 LOCATION The project is located in Hinsdale County, Colorado. From Lake City, CO, travel south on CO-149, Turn right on County Road 30, travel approximately 11 miles, project location is on the left. The work location can be found by searching "Mill Creek Campground" in Google maps. Mill Creek Campground Web Site: https://www.blm.gov/visit/mill-creek-campground-co 1.3 WORK SCHEDULE Work shall occur Monday - Friday, excluding federal holidays. Work shall be completed within 365 days of the Notice to Proceed. The project elevation is around 9500 feet. Weather (snow or snowmelt) may prevent work for several months of the year. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 365 days of the Notice to Proceed. Rough Order of Magnitude - Between $250,000 and $500,000. Pre-Bid Site Visit: May 16, 2025 at 11am Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local PTAC - https://www.aptac-us.org/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Hinesdale County, CO 6. Total Small Business Set-Aside for NAICS 237990 - Size Std: $45M 7. Bid, Performance and Payment Bonding 8. Type of Contract - Firm Fixed Price 9. Basis of Award - Price and other Factors Minimum Requirements for Responsive Quote: 1. Filled in, priced, dated and signed SF1442 with acknowledgement of all amendments. 2. Schedule B filled in with prices. 3. Bid Bond - 20% of Price 4. Technical Response per Section L and M. 5. Email items 1-4 above to the POC no later than the solicitation close date. Primary POC: Contracting Officer Courtni Strickland contact@example.gov

More opportunities from Department Of The Interior → Colorado State Office

Same awarding agency

NAICS: 236220
New
Federal
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
Solicitation # 140L1726R0001
Solicitation 140L1726R0001 is a Firm Fixed Price construction project for warehouse improvements at the Montrose Public Lands Center in Montrose, Colorado. The scope of work includes asbestos abatement, bathroom remodeling, flooring replacement, installation of a new rooftop heating and cooling unit, and the replacement of a manual overhead door with an electric one. Additional requirements involve upgrading luminaires and electrical outlets, maintaining the metal roof, repairing existing overhead doors, and replacing a photovoltaic inverter. The project is a 100% Total Small Business Set-Aside under NAICS 236220, with a performance period scheduled from November 16, 2026, to May 30, 2027. The contract is governed by FAR Part 15 and FAR Part 36, with award based on Best Value using an acceptable/unacceptable rating for technical approach, experience, and past performance. Contractors must comply with Davis-Bacon Act wages for Montrose County and maintain active registration in SAM.gov. For contracts exceeding 150,000 dollars, 100% performance and payment bonds are required, and a bid guarantee of 20% of the bid price must be submitted. Invoicing is processed electronically through the Invoice Processing Platform with 14-day prompt pay and progress payments. The prime contractor is required to self-perform at least 15% of the contract value, excluding materials.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 2 days
View Details
NAICS: 237990
Federal
B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Solicitation # 140L1726R0010
Solicitation 140L1726R0010 is a total small business set-aside construction contract issued by the Department of the Interior's Colorado State Office. The project focuses on hydrologic restoration to benefit the endangered Gunnison sage-grouse in the Crawford, Colorado area. The primary objective is to improve drainage on approximately 7.75 miles of rural roads by installing 204 rolling dips and associated lead-out ditches. These structures are designed to redirect surface water off roadways and onto adjacent sagebrush vegetation to mimic natural hydrologic flow. Construction is strictly limited to a work window between August 30, 2027, and October 22, 2027, although the overall period of performance extends through October 29, 2027. The government will utilize a best-value tradeoff award method, weighing price equally against the combined factors of technical approach, past performance, and schedule. Technical requirements are stringent, requiring rolling dips to be constructed at approximately a 30-degree angle with a cross slope between 4% and 8%, and lead-out ditches not to exceed 57.5 feet in length. Performance is monitored via a Quality Assurance Surveillance Plan, with a 95% acceptance threshold for inspected structures and zero tolerance for disturbances in identified avoidance zones. The contract is subject to Davis-Bacon Act wage determinations and requires contractors to maintain liability insurance and provide resumes for key personnel demonstrating significant experience in project planning and well installation.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS