Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Mill Street Bridge Replacement

Forecast
09-43150State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 9 - Bishop

Place of Performance

Tehachapi, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 9 - Bishop
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 9 - Bishop
Office AddressN/A

Full Description

Show more
Caltrans is proposing to replace existing concrete barriers and tubular rails with chain link railing fence and concrete barriers at Mill Street Bridge (50.355) overcrossing with State Route 58. Some minor grading and vegetation removal will be required near the embankments for the bridgework. The purpose of this project is to enhance the safety of pedestrians and bike users traveling the bridge on Mill Street and enhance the safety for travelers on the highway 58 commuting under this bridge by constructing new barriers and chain link fence. The existing concrete barrier on Mill Street (Bridge # 50.355) is deteriorated and beyond maintenance repairs, due to several cracking and delamination. There are also several existing spoils with exposed rebars. Therefore, there is a need to complete replacement of the existing concrete barrier and the existing rail tubes with Type 736 Concrete Barrier and Chain Link Railing Type 7 Environmental studies for this project were originally completed in 2020 under a different project identification number (0919000044). All previously-completed studies and avoidance measures remain valid..

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utility installation involving tunneling, boring, jacking, and micro tunneling, as well as site work such as land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including storm water pollution prevention and waste management. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Quotes are due by November 18, 2025, and should be submitted through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS