Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Millikan High School Aquatic Center Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Long Beach Unified School District is undertaking the Millikan High School Aquatic Center Project to demolish Building 700/3000 and adjacent portable classrooms and replace them with a new aquatic facility on the existing campus footprint. The center will feature a Myrtha modular competition pool measuring approximately 51.5 meters by 22.9 meters, equipped with a movable bulkhead to support variable programming, along with inclusive locker rooms, separate boys’ and girls’ locker rooms, showers, offices, and dedicated support buildings. The facility will include spectator bleachers for about 500 people, a snack bar and ticket booth, a scoreboard, shade structures, sports LED lighting, an integrated sound system, and enhanced security measures. Site improvements will encompass perimeter walls, circulation pathways, landscaping, and stormwater management systems designed to comply with the City of Long Beach’s Low Impact Development standards. The project aims to serve physical education classes, competitive swim and water polo teams, Special Olympics, and community swim activities, with construction scheduled to begin on June 1, 2026, and expected to last 18 to 24 months, targeting operational status by 2028. Work will be phased to minimize disruption to academic and athletic functions, starting with demolition and grading, followed by pool installation, structural construction, utility and drainage installation, and final site finishes. The project is subject to compliance with the California Environmental Quality Act, requiring a full Environmental Impact Report and consultation with the California Office of Historic Preservation due to the historical eligibility of the existing structures. It must also meet requirements from the Division of the State Architect for structural, fire, life safety, accessibility, and energy compliance under Title 24, and the California Department of Education for school site safety and environmental health under Title 5. Construction activities triggering soil disturbance of one acre or more must obtain stormwater permit coverage under the State Water Resources Control Board’s SMARTS system and NPDES permit. Tribal consultation is required under Assembly Bill 52 and Public Resources Code sections, and the project must adhere to applicable health and safety standards, including Title 8 regulations. The solicitation number is 2025120356, posted on June 26, 2026, with a deadline of August 11, 2026, under NAICS code 236220 for educational construction. No contract value, pricing details, or bonding and insurance requirements are specified in

General Info

Demolish old buildings at Millikan High to build new aquatic center with competition pool, bleachers, and stormwater systems.

Agency

California → Long Beach Unified School District

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Snowden Avenue and E Belen Street, Long Beach, CA, 90815

Set-Aside

NONE

Documents

(9)

Millikan High School Aquatic Center Initial Study Public Review Draft

PDFinitial-study

LBUSD Millikan HS Aquatic Center Project Draft Environmental Impact Report June 2026

PDFenvironmental-impact-report

2025120356 NAHC Comment on Millikan High School Aquatic Center Project

PDFcomment

Millikan High School Aquatic Center Draft EIR Notice of Availability

PDFspecial-notice

SCH 2025120356 Millikan High School Aquatic Center Project Notice of Completion

PDFnotice-of-completion

SCH Summary Form for Millikan High School Aquatic Center Project

PDFenvironmental-summary

Millikan High School Aquatic Center Project Notice of Preparation

PDFpresolicitation

Millikan High School Aquatic Center Project Notice of Completion

PDFnotice-of-completion

DTSC Comments on Millikan High School Aquatic Center DEIR NOP

PDFcomment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach Unified School District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach Unified School District
Office AddressN/A
Contacts
Ferdows FazeliSenior Program Manager
Bryana ClarkSenior Staff CEQA/NEPA Specialist

Interested Companies (1)

Show more
Terraphase Engineering
Sacramento, CA

Full Description

Show more
The District proposes to demolish Building 700/3000 and adjacent portable classrooms at Millikan High School and construct a new Aquatic Center within the existing developed campus footprint (refer to Figure 2, Site Plan). The new facility would include: • A Myrtha modular competition pool (approximately 51.5 meters × 22.9 meters) with a movable bulkhead; • Inclusive locker rooms, boys’ and girls’ locker rooms, showers, and offices; • Spectator bleachers with capacity for approximately 500 people; • A snack bar/ticket booth, scoreboard, and shade structures; • Sports LED lighting, integrated sound system, and security enhancements; • Support buildings for the pool; • Associated site improvements, including but not limited to perimeter walls, circulation, landscaping, and stormwater management features compliant with City of Long Beach Low Impact Development (LID) standards. The Aquatic Center would support physical education classes, competitive swim and water polo programs, Special Olympics, and community swim activities. Construction is anticipated to occur over approximately 18 to 24 months, beginning with demolition and grading and followed by facility construction and site improvements.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Federal
FY27 SPECIAL PROJECT USNH YOKOSUKA ALTERATION, JAPAN
Solicitation # N4008427R1027
This is a sources sought notice issued by the Naval Facilities Engineering Systems Command Far East for a major renovation project at U.S. Naval Hospital Yokosuka in Japan, with a projected scope valued between $100 million and $250 million. The notice is not a solicitation for proposals but a market research effort to identify qualified contractors capable of performing a Design-Bid-Build construction project involving three interrelated packages: Package A, the base electrical infrastructure work requiring 578 calendar days; Package B, alterations to Buildings 1400 and 1407 at 1,627 calendar days; and Package C, renovation of the operating room in Building 1400 at 986 calendar days. Package A must be completed before work on Packages B and C can commence, and those two are optional, subject to future funding and exercise after award. The work encompasses extensive civil, structural, architectural, mechanical, electrical, plumbing, fire protection, cybersecurity, hazardous material abatement, antiterrorism, and sustainability measures across multiple hospital departments including the Emergency Department, Inpatient Pharmacy, Radiology, Sterile Processing, Surgery Suites, and Laboratory, requiring full compliance with UFC and NFPA standards, ABA accessibility standards, MHS World Class Checklist, and Japanese regulations. Contractors must be legally authorized to conduct business in Japan, possess a valid construction license issued by the Ministry of Land, Infrastructure and Transport or a prefectural authority, and be capable of executing complex renovations within an active military medical facility without disrupting critical operations. The U.S. Government will not extend United States Official Contractor status or civilian component certification under the U.S.-Japan Status of Forces Agreement, meaning contractors and their personnel must operate under local Japanese law without U.S. diplomatic protections. Responses must be submitted electronically via the designated Contractor Information Form, limited to 12 single-sided pages or six double-sided pages with 12-point font, including up to five detailed project examples that demonstrate relevant experience, capability, and capacity. All submissions must be received by 1530 JST on August 10, 2026, and no reimbursement will be provided for response costs. Proprietary information will be safeguarded and used solely for acquisition planning; no contract award will result from this notice, no evaluations or feedback will be issued, and no binding obligations are formed regardless of the substance of submissions. The contract type, when awarded, will be firm-fixed-price with performance occurring entirely on the
Navfacsyscom Far East

POSTED

about 3 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, Project 7190530, involves upgrading the life health safety systems in Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs within an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 380 calendar days after the award. The basis for award is the lowest price, and the successful offeror will be issued a task order under MACC contract N4008525D. Key administrative requirements include the submission of proposals by September 24, 2026, at 3:00 PM local time. Bonding requirements are tiered based on proposal value, with bid, payment, and performance bonds required for proposals exceeding 150,000 dollars. The contract is subject to the Davis-Bacon Act and the Buy American Act, and it mandates specific paid sick leave for employees. Invoicing must be processed through Wide Area WorkFlow, and the contractor is required to maintain a comprehensive quality control system covering both onsite and offsite operations. Final acceptance is contingent upon a series of inspections, including punch out, pre-final, and final acceptance inspections.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS