Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Milton Road over Hoods Creek Bridge Replacement

Active
2026-200011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Stanislaus County Department of Public Works is soliciting bids for the Milton Road over Hoods Creek Bridge Replacement Project, identified as Federal Aid Project No. BRLS-5938(262), with an estimated construction cost under $5,765,000. The scope of work encompasses full bridge replacement including vegetation removal, installation of a temporary water diversion and crossing, excavation, removal of the existing structure, construction of a new bridge, placement of rock slope protection, and reconstruction of the adjacent roadway. Bidders are required to submit a bid bond amounting to 10 percent of their proposed bid. The solicitation number is 2026-200011, with bids due by 5:00 PM on August 26, 2026. The project will be executed in Stanislaus County, California, and all submissions must be made through the designated vendor portal. A virtual bid opening will be conducted via Microsoft Teams, with the link provided for participant access. Interested parties should direct inquiries to pwbids@stancounty.com, the primary point of contact for the project.

General Info

Stanislaus County seeks bids for Milton Road bridge replacement, due August 26, 2026, with 10% bid bond required.

Agency

California → Public Works Department of County of StanislausView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

1716 Morgan Rd Modesto, California 95358, CA, USA

Set-Aside

NONE

Documents

(22)

Milton Road Bridge at Hoods Creek - As-built plans

PDFother

Proposal Signature Sheet for Bid Submission

PDFproposal-signature-sheet

Environmental Commitment Record 2026-06-12

PDFenvironmental-commitment-record

Debarment and Suspension Certification

PDFcertification

Exhibit 10-Q Disclosure of Lobbying Activities

PDFdisclosure-of-lobbying-activities

Contract 200011 Milton Road over Hoods Creek Bridge Replacement Specifications Book 1 of 2

PDFspecifications

Bridge Inspection Report 38C0232 Hoods Creek 2023-09-21

PDFinspection-report

Public Contract Code Compliance Statement

PDFpublic-contract-code-statement

Bidder's List of Subcontractors for Milton Road Bridge Replacement

PDFbidders-list

Stanislaus County Milton Road Bridge Replacement Specifications Book 2 of 2

PDFspecifications

Non-Discrimination of Individuals with Disabilities Certification

PDFcertification

Foundation Report Milton Road Bridge January 2024

PDFfoundation-report

Equal Employment Opportunity Certification for Subcontractors

PDFcertification

Milton Road Over Hoods Creek Bridge Replacement Final Plans

PDFconstruction-plans

Asbestos and Lead-Containing Paint Survey Report Milton Road Bridge June 2023

PDFsurvey-report

IRS Form W-9 Request for Taxpayer Identification Number

PDFform-w9

Insurance Requirements Acknowledgement Form

PDFinsurance-acknowledgement

Equal Employment Opportunity Certification for Prime Contractor

PDFcertification

Non-Collusion Affidavit for Stanislaus County Public Works Bid

PDFnon-collusion-affidavit

Milton Road Over Hoods Creek Bridge Replacement Hydraulic Study Report April 2025

PDFhydraulic-study-report

California Levine Act Disclosure Statement

PDFdisclosure-statement

Milton Road over Hoods Creek Bridge Replacement Proposal Sheet

PDFproposal-sheet

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department of County of Stanislaus
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Public Works Department of County of Stanislaus
View Agency Profile
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: Stanislaus County Department of Public Works is now accepting bids for the Milton Road over Hoods Creek Bridge Replacement Federal Aid Project No. BRLS-5938(262). Estimated Construction cost for this project is less than $5,765,000. The work to be accomplished includes vegetation removal, installing a temporary water diversion and crossing, excavation, bridge removal and construction, rock slope protection placement and roadway reconstruction.
Notes: An electronic link is provided below to the virtual Bid Opening: https://teams.microsoft.com/meet/28741406478560?p=wxWy6fOfnMq2uMIO3x
Bid Bond: 10.00%

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
WSMR Bridge Repair RR7B0003
Solicitation # W911SG26BA016
Solicitation W911SG26BA016 is an invitation for bids for the repair of bridge RR7B0003 located on Route 7 at the White Sands Missile Range in New Mexico. This firm-fixed-price construction project is set aside for HUBZone owned small businesses under NAICS code 237310, with an estimated magnitude of construction between 500,000 and 1,000,000 dollars. The scope of work involves repairing a concrete box culvert drainage structure by addressing cracking, spalling, and delamination of the cell walls, headwall, wingwalls, and apron, as well as performing site work including backfilling, compacting, and installing wire-tied rip rap. The total period of performance is 120 calendar days, consisting of a 30-day preconstruction authorization phase and a 90-day construction phase. The procurement is conducted via sealed bidding, with the award based on price and responsibility. Bidders must provide original bid guarantees, and the awardee must submit performance and payment bonds within ten days of the award. A critical requirement is the provision of a full-time, non-subcontracted Superintendent employed directly by the prime contractor, as well as an on-site Quality Control Manager. All bids must be submitted in sealed envelopes to MICC-Fort Bliss, and offerors must maintain active registrations in the System for Award Management. Final deliverables include as-built drawings, operation and maintenance manuals, and warranties.
W6QM Micc-Ft Bliss

POSTED

1 day ago

DEADLINE

in 20 days
View Details