Milton Road Over Hoods Creek Bridge Replacement

Active
20260713041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project concerns the replacement of the existing twelve-foot, six-span Milton Road Bridge over Hoods Creek in Modesto, California, with a new two-lane, two-span cast-in-place slab bridge on the same alignment. Work includes the demolition of the old structure, construction of new abutments and a center pier using pile driving, excavation, placement of rock slope protection, vegetation removal, roadway reconstruction of the approaches, installation of a temporary shoe fly road to maintain traffic, and a temporary creek diversion system to manage water flow during construction. All work must comply with Caltrans Standard Specifications, County Improvement Specifications, and relevant federal and state environmental regulations, including those enforced by the Central Valley Water Board. The contractor is required to obtain permits under the Clean Water Act, including Section 401 Certification and Section 404 Permit, as well as a Streambed Alteration Agreement. Noise levels must not exceed 86 dBA at 50 feet between 9:00 p.m. and 6:00 a.m., and light-based warning signals are preferred. The contractor must employ a qualified superintendent with full authority over on-site operations and perform at least 30% of the work using its own workforce. Disadvantaged Business Enterprise participation is mandated under 49 CFR Part 26, and subcontractor use requires prior written approval. The solicitation, numbered 20260713041, is issued by the Stanislaus County Department of Public Works with a response deadline of August 26, 2026. Proposals must be submitted in two sealed envelopes—one for the technical proposal and one for the fee schedule—with four hard copies and one electronic copy in PDF format. The technical proposal is limited to 30 pages, excluding resumes, cover letters, and attachments, with individual resumes capped at one page per standard team member and two pages per principal, up to three principals. Proposals are to be delivered to Gary Mohler at 1716 Morgan Road, Modesto, CA 95358, with electronic submissions accepted via PlanetBids. The contract will be executed under federal-aid provisions, subject to 2 CFR 200, Davis-Bacon Act wage requirements, and prompt payment compliance. No contract value is specified as pricing is to be submitted electronically through PlanetBids, but line items for materials such as structural steel, concrete, reinforcing bar, prestressed concrete piles, and traffic striping are listed

General Info

Replace Milton Road Bridge over Hoods Creek with two-span slab bridge, install temporary road and creek diversion, Modesto, CA.

Agency

California → Stanislaus County Department of Public WorksView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Modesto, CA, 95354, USA

Set-Aside

NONE

Documents

(5)

RFP for Construction Management Services for Milton Road Bridge Over Hood Creek

PDFrfp

Specification Book 2 of 2 for Milton Road over Hoods Creek Bridge Replacement

PDFspecifications

Environmental Commitment Record for Construction Project

PDFother

Milton Road over Hoods Creek Bridge Replacement - Specification Book 1 of 2

PDFspecifications

Milton Road Over Hoods Creek Bridge Replacement Plans

PDFplans

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Stanislaus County Department of Public Works
Contacts1 person available
OfficeN/A
Organization / Agency
California → Stanislaus County Department of Public Works
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
Bid #200011: The project consists of replacing the existing Milton Road Bridge over Hoods Creek. The work includes demolition of the existing 123-foot, six-span bridge and construction of a new two-lane, two-span, cast-in-place slab bridge on the same alignment. A temporary shoe fly road and a temporary creek diversion system are required to maintain traffic and manage creek flows during construction. The scope also involves vegetation removal, excavation, pile driving for new abutments and a center pier, rock slope protection placement, and roadway reconstruction of the approaches.