Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Mine Highwall Backfilling and Pit Elimination

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves large-scale earthmoving and land reclamation services for the Kentucky Energy and Environment Cabinet. The scope of work requires the backfilling of 2,000 linear feet of mining highwall and the elimination of 14 acres of mine pits utilizing adjacent onsite mine spoil. To ensure site stability, highwall areas must be graded to slopes no steeper than .3 percent, necessitating the use of heavy excavators and dozers to deliver a fully reclaimed site. The project is categorized under NAICS code 238910 and was posted on October 27, 2026. Interested parties must submit their responses by the deadline of December 1, 2026, at 2:30 PM. This opportunity is designed for contractors capable of performing heavy civil engineering and land reclamation tasks to meet the specific environmental standards of the state agency.

General Info

Earthmoving and land reclamation for Kentucky Energy and Environment Cabinet by December 1, 2026.

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-785-2700000192-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2700000192-1 | RFB-108-27 25035AMLBAML, HOPKINS COUNTY

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → Energy & Environment Cabinet
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs large-scale earthmoving and land reclamation for prime contractors on Kentucky Energy & Environment Cabinet projects. Backfills 2,000 linear feet of mining highwall and eliminates 14 acres of mine pits using adjacent onsite mine spoil. Grades highwall areas to slopes no steeper than .3%. Requires heavy dozers and excavators. Delivers a reclaimed site with stabilized highwalls and eliminated pits.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 13 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 15 hours ago

DEADLINE

in 15 days
View Details

More opportunities from Kentucky → Energy & Environment Cabinet

Same awarding agency

NAICS: 237990
New
SLED
RFB-785-2700000148-2 | RFB-87-27 24028AMLBAML, JOHNSON COUNTY
Solicitation # RFB-785-2700000148-2
Solicitation RFB-785-2700000148-2, issued by the Kentucky Energy and Environment Cabinet, seeks general construction services for abandoned mine lands remediation in Johnson County, specifically at 711 Williams Branch in Wittensville. The scope of work involves the closure of mine portals, including nine non-wildlife and six wildlife accessible closures, as well as the installation of drainage features such as a Class III ditch and concrete block-tied mat ditches. Additional requirements include the replacement of a structurally compromised culvert under Williams Branch Road with new inlet and outlet headwalls, the installation of subdrains by excavating to rock, and providing aggregate support for unstable roof areas. Bids must be submitted exclusively through the eProcurement system by November 3, 2026. Bidders are required to enter 0.00 as the contract amount in the electronic system and instead provide the actual bid amount on an Official Bid Document, which must be combined with any required bid bond into a single PDF attachment. Addendum One clarified that Armorform is not permitted as a substitute for concrete block tied mats and provided updated project sheets and location data. All site visit participants must adhere to Commonwealth of Kentucky construction health and safety guidelines.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 237990
SLED
RFB-785-2700000148-1 | RFB-87-27 24028AMLBAML, JOHNSON COUNTY
Solicitation # RFB-785-2700000148-1
Solicitation RFB-785-2700000148-1 is a request for general construction services issued by the Commonwealth of Kentucky Energy and Environment Cabinet, Division of Abandoned Mine Lands. The project, located in Johnson County at 711 Williams Branch, Wittensville, focuses on abandoned mine lands remediation. The scope of work is divided into three primary areas: an upstream area requiring the opening, draining, and closing of two portals with non-wildlife accessible closures and the installation of a Class III ditch and culvert; a middle area involving slide mitigation through excavation to rock, subdrain installation, and a mix of wildlife and non-wildlife portal closures; and a downstream area requiring the closure of five portals to protect a residence and natural stream. Additional infrastructure work includes replacing a structurally compromised culvert under Williams Branch Road with new inlet and outlet headwalls. Bids must be submitted exclusively through the eProcurement system by November 3, 2026, at 9:30 AM. Bidders are required to enter 0.00 as a placeholder for the contract amount in the system and instead provide the actual bid price on an Official Bid Document, which must be uploaded as a single PDF along with any required bid bonds. Addendum One clarified that the project requires 9 non-wildlife and 6 wildlife accessible portal closures and explicitly denied the use of Armorform in place of concrete block tied mats. Interested parties are directed to the state plan room for specifications and drawings and must be registered in the VSS system to participate.
Other Heavy and Civil Engineering Construction

POSTED

28 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS