Minor Alteration No. WA2026047 – Ryer Island Discharge Pipe Replacement Project

Forecast
WA2026047State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Valley Flood Protection Board is initiating a minor alteration to replace a 66-foot section of existing PVC irrigation distribution pipe with a new 18-inch diameter PVC pipe, located approximately 20 feet from the landside levee toe within an SSJDD easement, extending landward toward the irrigation ditch. The repair will maintain the existing depth and elevation of the pipe, using native soil for backfill, and will not involve any maintenance or modification of the portion of the pipe passing through the levee. A flexible coupler and concrete collar will be installed to seamlessly transition from the existing steel pipe to the new PVC segment, ensuring structural integrity and hydraulic continuity. This work is authorized under Permit 948-1 and is confined strictly to the identified section outside the levee structure. The project is forecasted under Minor Alteration No. WA2026047, with primary point of contact Jennifer Calles, Senior Environmental Scientist, and Richard Hamilton, Project Manager, overseeing coordination and execution in Rio Vista, California.

General Info

Replace 66-foot PVC pipe section near levee toe under Permit 948-1, no levee modification, native backfill, certified transition.

Agency

California → Central Valley Flood Protection Board

Place of Performance

Rio Vista, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jennifer CallesSenior Environmental Scientist
Richard HamiltonProject Manager

Full Description

Show more
To replace a section of PVC irrigation distribution pipe with a new 66 foot long and 18-inch diameter PVC pipe. The irrigation pipe being repaired is located approximately 20-feet from the landside levee toe within an SSJDD easement landward of the standpipe used for distribution. A flexible coupler and concrete collar will be poured to transition from the steel to plastic pipe. Depth and elevation will remain the same. Backfill will be existing native soil. Repair will start from 20 feet from the toe of the levee and continue landward to the irrigation ditch. No maintenance will be done on the pipe going through the levee. The discharge pipe is authorized under Permit 948-1.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include site improvements, stormwater facilities, fencing, and the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide bid security, evidence of authority to sign, and M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. The successful contractor is required to furnish performance and payment bonds equal to the contract price and maintain insurance from companies with an A.M. Best rating of A-VII or better. Project administration follows EJCDC standards, with payments processed monthly via applications for payment submitted to the Engineer, and final acceptance contingent upon the Engineer's written recommendation.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project is governed by VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with strict adherence to OSHA and ADA requirements. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, submission of a bid guarantee, and the provision of performance and payment bonds equal to 100 percent of the contract amount. Additionally, the project is subject to Davis-Bacon wage determinations and requires compliance with various federal executive orders regarding non-discrimination and the use of American Iron and Steel.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS