Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on November 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mira Loma Safe Routes to School Sidewalk Gap Closure Project 23108

Closed
25-26-08State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Mira Loma Safe Routes to School Sidewalk Gap Closure Project aims to enhance pedestrian safety and accessibility near Mira Loma Middle School and Van Buren Elementary School through a series of improvements within existing City right-of-way. Funded by a state Active Transportation Program grant, the project involves constructing asphalt street sections widened to approximately 18 feet from the street centerline to the curb face, along with concrete curb and gutter, and a 5.5-foot-wide concrete sidewalk. Additional features include accessible curb ramps compliant with ADA standards, street signage and striping, and the installation of actuated solar-powered pedestrian flashing beacons at multiple crosswalks. The project also encompasses the development of designated DG trails and fencing to improve safety and connectivity for pedestrians and cyclists. All work must adhere to the detailed Bid Documents, which include Special Provisions, Plans, Standard Plans, Standard Specifications, and Reference Specifications, ensuring compliance with established city and state standards. The contract, managed by the City of Jurupa Valley, has a project size estimated between one and five million dollars and is open for responses until December 10, 2025. The project is designed to improve safety, accessibility, and walkability in the area, supporting the community’s active transportation goals. For inquiries, the primary contact is Rebecca Abeyta at the city’s purchasing office.

General Info

Documents

1

RFB 25-26-08: Supply and Delivery of Ferric Chloride

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Sep 3, 2025 to Dec 10, 2025. The notice title changed. NAICS code changed from 325180 to 237310. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Jurupa Valley
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Project includes various safety and sidewalk improvements within existing City right-of-way (where possible) near Mira Loma Middle School and Van Buren Elementary School where none currently exist. The Project is made possible through the award of state-funded Active Transportation Program (ATP)grant. The street section will be constructed with asphalt pavement typically widened about 4’ to achieve a total of 18’ from street centerline to proposed curb face, concrete curb and gutter, and a 5.5-foot-wide concrete sidewalk. Improvements will also include drive approaches, accessible curb ramps conforming to current ADA standards, street signing and striping, actuated pedestrian solar flashing beacons for multiple crosswalk locations, and construction of DG trails and trail fencing. All work shall be performed in accordance with the Bid Documents (including, but not limited to the Special Provisions, and Plans), the Standard Plans, the Standard Specifications, Reference Specifications, and other Contract documents on file with the City of Jurupa Valley, California.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS