Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Mise en forme et pavage chemin Passe-Partout

Active
20156375Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

La municipalité de la Pêche invite les soumissionnaires à soumettre des offres pour la mise en forme et le pavage du chemin Passe-Partout, dans la région de l'Outaouais. Les travaux incluent la pose de bordures, la construction de trottoirs et le revêtement pavé, à réaliser sur la fondation granulaire déjà installée, dont les travaux de drainage et de sous-base ont été complétés. Le contrat est ouvert aux soumissionnaires qui doivent répondre à la demande officielle numérotée 20156375, avec une date limite de soumission fixée au 21 juillet 2026 à 19 h. La procédure est gérée directement par la municipalité, bien que l’agence affiliée apparaisse sous le nom du gouvernement du Canada dans les données, et les offres doivent être soumises selon les exigences techniques et administratives établies par la municipalité. Le point de contact principal pour toute information est Sandra Martineau, autorité contractuelle, joignable par courriel à s.martineau@villelapeche.qc.ca.

General Info

Pavage et bordures du chemin Passe-Partout, soumissions jusqu’au 21 juillet 2026, contact Sandra Martineau.

Agency

Government of Canada → La Municipalité de La PêcheView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Outaouais, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Canada → La Municipalité de La Pêche
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → La Municipalité de La Pêche
View Agency Profile
Office AddressN/A
Contacts
Martineau SandraContracting Authority

Full Description

Show more
La municipalité de la Pêche demande des soumissions pour l'exécution de travaux de bordures, trottoirs et pavage du chemin Passe-Partout. La municipalité a déjà complété les travaux de drainage et de fondation sur ce chemin. Le présent contrat débute au niveau de la fondation granulaire à compléter, des travaux de bordures et trottoir et du pavage.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad scope of asphalt paving and striping services to be performed across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haulage and disposal of grinding debris, removal of existing pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road drainage systems, which may require permitting. All tasks are to be completed in accordance with port standards and safety protocols. This is a forecasted unit price contract titled Asphalt Paving & Striping Portwide Unit Price 2026, issued by the Port of Seattle under NAICS code 237310. The contract is administered by Port Construction Services, with primary point of contact Heather Bowden and project manager Lesley Miles available for inquiries. Performance will occur across various port-wide sites, and all work is expected to align with the port’s infrastructure maintenance and development goals. There is no solicitation number provided at this time, and the contract is not yet open for bidding, serving as a planning indicator for future procurement.
Port Construction Services

POSTED

about 5 hours ago

DEADLINE

N/A
View Details