Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on June 12, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MISSION LEVEE IMPROVEMENT PROJECT - MLUID - Along United Irrigation District Canal, From Military Road To 1.1 Miles Upstream of Bentsen Palm Drive in Hidalgo County, Texas

Closed
IBM12B0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a full and open competition for a firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the U.S. Army Corps of Engineers under NAICS code 237990, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive river channel widening and modifications across approximately 1.6 miles, the construction of 3.1 miles of earthen levees, and the installation of four concrete culverts with pre-cast pipes and composite flap gates. Additional requirements include the relocation of water, sewer, and electrical utilities, scour protection, demolition of abandoned structures, and wetland mitigation. The estimated period of performance is 1619 calendar days following the receipt of the Notice to Proceed, though offerors are cautioned that all real estate rights for site access have not yet been obtained and will be secured prior to the full notice. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal. Awardees are required to provide payment and performance bonds equal to the total bid price within 10 days of award, and firms other than small businesses must submit a subcontracting plan per FAR Part 19. The project also requires the delivery of an operations and maintenance manual detailing procedures for restoring levee geometry after seismic events.
W2SR Endist Caribbean(provis)

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
Federal
Gravesite Expansion Florence National Cemetery 943CM3023
Solicitation # 36C78627Q0018
The National Cemetery Administration Southeast District is seeking sources for general construction services to execute a gravesite expansion at the Florence National Cemetery in South Carolina. This project involves the installation of approximately 3,813 additional pre-placed crypt interment spaces across sections BB through FF and the expansion of the columbarium court with roughly 1,000 new double-sided niche walls. The scope of work also includes the construction of two new roads with asphalt paving and curbing, the implementation of stormwater management infrastructure featuring two detention ponds, and the extension of potable water, sanitary sewer, natural gas, and electrical/communications utilities. The total performance period is 456 calendar days from the issuance of the notice-to-proceed. This opportunity is designated as a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 237990. Eligible firms must be registered in the System for Award Management and the Vendor Information Portal, with SDVOSB or VOSB claimants requiring certification in the VETBIZ database. A critical requirement is the submission of the VA Notice of Limitations on Subcontracting certification, which stipulates that the contractor shall not pay more than 85 percent of the government-paid amount to firms that are not certified SDVOSBs or VOSBs, excluding the cost of materials. Interested parties must submit a capability statement and the required certifications by November 9, 2026, to be considered for any forthcoming solicitation.
National Cemetery Administration (36C786)

POSTED

about 10 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract IBM12B0006 involves the Mission Levee Improvement Project along the United Irrigation District Canal in Hidalgo County, Texas. The project covers approximately 2.9 miles of canal from Military Road to 1.1 miles upstream of Bentsen Palm Drive. The work includes excavation and filling alongside the existing canal to create a smaller canal section, installing reinforced concrete lining for this new canal section, and building a maintenance road on its south side. Specific tasks involve constructing temporary cofferdams and de-watering the canal, clearing and grubbing the right of way, soil excavation and compaction to establish the canal invert, placing compacted fill and reinforced concrete lining, as well as building supporting structures like canal turnouts, retaining walls at bridge crossings, and a flexible base road with access ramp. The contract sets a projected budget range between $10 million and $13 million, with performance milestones beginning on or about September 15, 2012. Initial work involves mobilization and de-watering, followed by canal draining, grading, and concrete lining from October 1, 2012 through March 15, 2013. Final construction activities, including roadway and retaining walls, must be completed by June 1, 2013. Coordination with the Environmental Consultant and the U.S. International Boundary and Water Commission’s Environmental Management Division is essential, particularly during dewatering, to manage the relocation of wildlife prior to construction. There will be a non-mandatory site visit at the USIBWC Mercedes Field Office, and contractors are required to submit a schedule that meets these deadlines. No other contractors are expected to perform physical construction concurrently on-site.

General Info

Mission Levee Improvement: canal excavation, concrete lining, maintenance road, $10-13M, Sept 2012-June 2013.

Agency

N/A

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USIBWC Mercedes Field Office, 325 Golf Rd., Mercedes, Texas 78750, MERCEDES, TX, 78750, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

The response deadline was removed. Set-aside removed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
IBM12B0006 - MISSION LEVEE IMPROVEMENT PROJECT - MLUID - Along United Irrigation District Canal, From Military Road To 1.1 Miles Upstream of Bentsen Palm Drive in Hidalgo County, Texas PROJECT IDENTIFICATION. The Project to be constructed under this contract is identified as follows: International Boundary and Water Commission - United States Section, Mission Levee Improvement Project - MLUID - Along United Irrigation District Canal, From Military Road To 1.1 Miles Upstream of Bentsen Palm Drive (From Levee Sta. 192+79.56 to Sta. 346+59.95 = 2.9 miles) Hidalgo County, Texas GENERAL DESCRIPTION OF WORK. The scope of work for this project generally includes excavation and filling in the area of the existing United Irrigation District (UID) Canal adjacent to Mission Levee in order to construct a smaller canal section, lining of the new canal section with reinforced concrete, and a maintenance road on the south side of the new canal section. The work is anticipated to include the following tasks:(1) Construction of temporary cofferdams and de-watering of the UID canal within the project limits. (2) Preparation of right of way (clearing and grubbing). (3) Excavation of material to establish the proposed canal invert, including over-excavation and re-compaction of soil below the canal invert as shown on the Contract Drawings. (4) Benching into competent soil prior to placement of fill as shown on the Contract Drawings. (5) Placement of compacted fill to establish the design grade. (6) Placement of reinforced concrete within the invert and side slopes of the new canal section. (7) Construction of appurtenant structures including canal turnouts and retaining walls at bridge crossings. (8) Constructing 6-inch Flex Base along top of new maintenance road constructed on the south side of the new UID canal and an access ramp at the upstream end of the project. Note: There is a non -mandatory site visit ( non-mandatory date site visit details to be provided in forthcoming solicitation, which will include Plans and Specifications attachments) at the USIBWC Mercedes Field Office, 325 Golf Rd., Mercedes, Texas 78750. Please remember this is only a pre-solicitation. This requirement is UNRESTRICTED. The magnitude of this project is between $10,000,000.00 and $13,00,000.00. PERFORMANCE PERIOD/SEQUENCE OF WORK A.The Work is to be performed as shown on the Contract Drawings. B. The Work under this Contract shall be completed as follows: 1. On-Site mobilization will begin on or about September 15, 2012. Construction of cofferdams and de-watering of UID canal shall begin on September 15, 2012. 2. Draining of existing canal and construction of the new canal including grading and 3. Construction of reinforced concrete lining shall commence after October 1, 2012 and shall be completed by March 15, 2013. Construction Contractor shall be responsible to provide a construction schedule to the government that will meet the performance period. 4. Construction of project elements beyond the limits of the canal lining, including retaining walls and maintenance roadway shall be completed by June 1, 2013. WORK UNDER OTHER CONTRACTS No physical construction work is anticipated to be performed at the Project site, under separate contract with other contractors, during the Contractor's performance under this Contract. Construction Contractor will have to coordinate with Environmental Consultant and USIBWC's Environmental Management Division (EMD) during the dewatering stage of the contract. The Environmental Consultant will be responsible for the relocation of all animal species prior to commencement of any Construction activities. This activity and coordination is crucial to the success of the project.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS