Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on July 27, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MISSION LEVEE IMPROVEMENT PROJECT - MLUID - Along United Irrigation District Canal, From Military Road To 1.1 Miles Upstream of Bentsen Palm Drive in Hidalgo County, Texas

Closed
IBM12B0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a full and open competition for a firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the U.S. Army Corps of Engineers under NAICS code 237990, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive river channel widening and modifications across approximately 1.6 miles, the construction of 3.1 miles of earthen levees, and the installation of four concrete culverts with pre-cast pipes and composite flap gates. Additional requirements include the relocation of water, sewer, and electrical utilities, scour protection, demolition of abandoned structures, and wetland mitigation. The estimated period of performance is 1619 calendar days following the receipt of the Notice to Proceed, though offerors are cautioned that all real estate rights for site access have not yet been obtained and will be secured prior to the full notice. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal. Awardees are required to provide payment and performance bonds equal to the total bid price within 10 days of award, and firms other than small businesses must submit a subcontracting plan per FAR Part 19. The project also requires the delivery of an operations and maintenance manual detailing procedures for restoring levee geometry after seismic events.
W2SR Endist Caribbean(provis)

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
Federal
Gravesite Expansion Florence National Cemetery 943CM3023
Solicitation # 36C78627Q0018
The National Cemetery Administration Southeast District is seeking sources for general construction services to execute a gravesite expansion at the Florence National Cemetery in South Carolina. This project involves the installation of approximately 3,813 additional pre-placed crypt interment spaces across sections BB through FF and the expansion of the columbarium court with roughly 1,000 new double-sided niche walls. The scope of work also includes the construction of two new roads with asphalt paving and curbing, the implementation of stormwater management infrastructure featuring two detention ponds, and the extension of potable water, sanitary sewer, natural gas, and electrical/communications utilities. The total performance period is 456 calendar days from the issuance of the notice-to-proceed. This opportunity is designated as a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 237990. Eligible firms must be registered in the System for Award Management and the Vendor Information Portal, with SDVOSB or VOSB claimants requiring certification in the VETBIZ database. A critical requirement is the submission of the VA Notice of Limitations on Subcontracting certification, which stipulates that the contractor shall not pay more than 85 percent of the government-paid amount to firms that are not certified SDVOSBs or VOSBs, excluding the cost of materials. Interested parties must submit a capability statement and the required certifications by November 9, 2026, to be considered for any forthcoming solicitation.
National Cemetery Administration (36C786)

POSTED

about 10 hours ago

DEADLINE

in 19 days

General Info

Agency

N/A

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USIBWC Mercedes Field Office 325 Golf Rd., MERCEDES, TX, 78750, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
Amendment 001 is issued to respond to questions as follows: MISSION LEVEE IMPROVEMENT PROJECT ALONG UNITED IRRIGATION DISTRICT CANAL, MISSION, TEXAS RESPONSE TO CONTRACTOR INQUIRIES Q: On Sheet 84, please verify the correct details are referenced per "Typical Canal Joint Plan" (Control Joint - Detail 1 / should this be Detail 3? Construction Joint - Detail 3/ should this be Detail 1?). A: There is a correction required. On the Typical Canal Joint Plan on Sheet 84, the Control Joint callout should reference Detail 3 (not Detail 1), and the Construction Joint callout should reference Detail 1 (not Detail 3). Q: On Sheet 84, "Typical Canal Joint Plan", are control joints required if optional construction joints are not installed? A: Yes control joints are required, regardless of the presence or absence of construction joints. Q: On Sheet 84, "Typical Canal Joint Plan", may construction joints be installed in lieu of the control Joints. A: This may be allowable; however, the Contractor would need to provide an approved construction joint detail that provides for full crack control. Q: What is the required joint sealer for control joints? A: There is no joint sealer required for canal lining control joints. Please note that there is base seal required below all canal lining control joints. Q: Are construction joints required to be tooled and sealed? A: Construction joints are not required to be tooled or sealed. Please note that there is base seal required under all canal lining construction joints. Q: Does the General Contractor/Prime Contractor have to supply an additional FEM for himself at his expense? A: The specifications do not require the Contractor to provide an additional FEM. Q: Is it the Contractors job to move the species identified by the government's FEM or is the government transporting the species from the canal? A: The government's FEM will be responsible for removal of species. The Contractor shall coordinate all de-watering with the FEM, as well as the UID. Q: Sheet 3, Item 7, states all work shall be done by a contractor having a valid contractor's license issued by the State of Texas Registrar of Contractors - This does not apply and needs to be removed from the specifications A: Concur. Q: To increase the accuracy of the takeoff and to provide the owner with a more responsive proposal, are a full set of Auto CAD drawings available prior to bid? A: (USIBWC to decide on release of CAD drawings) It must be noted that the quantities shown on various "quantity summary tables" within the construction drawings shall be considered as informational only and shall not to serve as the basis of the contractor's bid. It is expressly understood and agreed that the quantities noted in these tables are not by virtue of submitting a bid, a part of the contract, and represent only an opinion by the engineer as to the quantities specific to that table. The quantity tables are included in the plans only for the convenience of bidders and their use is subject to all the conditions and limitations set forth in the contract documents relating to the examination of the contract documents and the submission of a bid. Specifically, submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality, and scope of work to be performed, the quantity of materials to be furnished, and the requirements of the contract documents. The bidder is cautioned that it is their sole responsibility to make such independent investigation and examination as the bidder deems necessary in order to satisfy their self as to the conditions to be encountered in the performance of work and the quantities required to complete the work in accordance with the contract documents. The bidder shall take no advantage of any apparent error or omission in the plans, bid schedule items, estimated quantities noted in the schedule, specifications or other contract documents. In the event the bidder discovers an apparent error or omission or be in doubt as to their meaning, the bidder shall immediately notify the USIBWC, in writing, requesting a clarification or interpretation. Any clarification and or interpretation deemed appropriate by the USIBWC shall be issued to all prospective bidders in the form of an addendum. Any addendum so issued shall form a part of the contract documents. Q: How fast can the canal be dewatered? A: The Contractor shall coordinate the time period for the dewatering process with the FEM, as well as the UID. Q: Is there are maximum rate at which we can dewater the canal? A: There is no specified maximum rate of de-watering. Contractor shall perform the work in such a manner that erosion or de-stabilization of the canal slopes is minimized. Q: Will time charges be suspended on the construction project until the FEM contractor has finished their work? A: The Contractor will be working concurrently with the FEM. The FEM will begin dewatering and relocation of species two weeks prior to Construction Contractor. If the FEM is not done with the relocation, prior to the commencement of the construction, the Contractor will have to coordinate with the FEM to commence construction on time. FEM will report directly to the USIBWC Environmental Management Division. Q: How long does the FEM contractor have to complete the removal of plants and animals from the canal? A: Contractor has from September 15, 2012 to October 01, 2012 dewater and relocate all animal species. FEM will on site from September 15, 2012 to March 30, 2012 to coordinate with Construction Contractor during construction period in case any species are encountered during construction. FEM and Contractor will have to work concurrently and in coordination to deal with any environmental issues that might come up during construction. FEM will report directly to the USIBWC Environmental Management Division. Q: Will the USIBWC be providing any borrow site(s) for the embankment material? If yes, where are they located? A: No, specified borrow areas have been removed from the specifications. Q: Sheet 3 states the concrete compressive strength at 28 days, unless stated elsewhere, shall be 4000 PSI. Specification 60.21.00-9 states the concrete for the canal lining shall be Class A (3000 PSI). What is the correct class of concrete for the canal lining? A: The specified minimum 28 day compressive strength for the canal lining is 3000 psi. The minimum 28 day compressive strength for headwalls, wing walls, turnout structures and retaining walls is 4000 psi.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS