Mitchell Park Restroom Site Work

Closed
197232State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 10 hours ago

DEADLINE

in 15 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 238910
New
Federal
Y--Hickman Wildlife Water Catchment and Pipe Fence
Solicitation # 140L1726Q0054
Solicitation 140L1726Q0054 is a Total Small Business Set-Aside request for quote issued by the Department of the Interior, Bureau of Land Management, for the Hickman Wildlife Water Catchment and Pipe Fence project in Socorro County, New Mexico. The project is a firm-fixed-price contract involving the demolition and removal of existing infrastructure and the construction of a 1,000 square-foot metal catchment consisting of two 20 by 25 foot structures with galvanized gutters and propanel tops. Additionally, the contractor is required to install two BOSS tanks and erect 1,000 linear feet of pipe-and-cable fencing. The updated period of performance is scheduled from November 17, 2026, to January 25, 2027. Award will be based on the most advantageous offer, with price serving as the primary factor, followed by technical approach, nongovernmental experience, and a detailed work breakdown schedule illustrating the critical path. Contractors must adhere to Davis-Bacon wage determinations for Socorro County and comply with OSHA, EPA, and ADA regulations. Key submission requirements include a signed SF 1442, a price schedule, and a payment bond or irrevocable letter of credit due within 10 days of award. The final deadline for proposal submission is November 9, 2026, at 3:00 PM ET, with a site visit scheduled for October 29, 2026, at the Socorro Field Office.
New Mexico State Office

POSTED

about 16 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves site work at Mitchell Park in Palo Alto, California, to replace an existing two-stall restroom building with a new four-stall prefabricated restroom. The scope includes demolition and disposal of the current restroom, new concrete paving, installation and relocation of utility connections, removal of a light pole, and replacement of a concrete pathway section adjacent to the restroom. The prefabricated restroom building itself will be provided separately and is not included in this contract. The solicitation for bids was posted on March 18, 2026, with a response deadline of April 10, 2026, managed by the City of Palo Alto’s Public Works Department. Primary contacts for the project include the Project Engineer and Contract Administrator, who oversee project execution and contractual compliance. The formal agreement is governed by the City of Palo Alto’s standardized construction contract terms, which cover contractor responsibilities, project timelines, compensation, indemnification, insurance requirements, and legal compliance including prevailing wage laws. Contractors are required to submit a bid bond guaranteeing their proposal, along with performance and payment surety bonds to secure faithful completion of the work and payment of labor and materials. Utility infrastructure information related to the project will be accessed through a formal request and confidentiality process to protect sensitive details. Overall, the contract establishes a comprehensive framework to ensure the site work for the restroom replacement is executed professionally, with financial and legal safeguards in place to protect the city’s interests and ensure timely project delivery.

General Info

Replace two-stall restroom with four-stall prefab, including demolition, paving, utility work, and pathway replacement.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

16

Bid Bond Form for City of Palo Alto Project

DOCX, High priority: read this first2 pages · bid-bond
High

City of Palo Alto Utility Map Request Form and Confidentiality Agreement

PDF, High priority: read this first3 pages · request-form
High

Construction Contract General Conditions and Change Orders - City of Palo Alto

PDF, High priority: read this first104 pages · contract-document
High

IFB 197232 Mitchell Park Restroom Site Work Bid Form

DOCX, High priority: read this firstbid-form
High

IFB 197232 Mitchell Park Restroom Site Work Special Provisions

PDF, High priority: read this firstspecial-provisions
High

IFB Mitchell Park Restroom Site Work Special Provisions

PDF, High priority: read this firstspecial-provisions
High

IFB Package for Mitchell Park Restroom Site Work

DOCX, High priority: read this firstifb
High

Mitchell Park Restroom Construction Plans

PDF, High priority: read this firstspecifications
High

Mitchell Park Restroom Construction Plans 3.13.2026

PDF, High priority: read this firstspecifications
High

Mitchell Park Restroom Engineers Estimate

XLS, High priority: read this firstengineers-estimate
High

Mitchell Park Restroom Site Work IFB 197232

PDF, High priority: read this firstifb
High

Mitchell Park Restroom Technical Specifications

PDF, High priority: read this firsttechnical-specifications
High

Mitchell Park Restroom Technical Specifications

PDF, High priority: read this firsttechnical-specifications
High

Performance Bond for City of Palo Alto Public Improvements

DOCX, High priority: read this first2 pages · performance-bond
High

Liquidated Damages Calculation for Mitchell Park Restroom PG-19000

PDF, Low priorityother
Low

Payment Surety Bond for City of Palo Alto Agreement

DOCX, Low priority2 pages · payment-bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts2 people available
OfficePalo Alto, CA, 94301, USA
Organization / AgencyCalifornia → Public Works
Office AddressPalo Alto, CA, 94301, USA
Contacts
Chelsea LaxaProject Engineer
Steven DimterContract Administrator

Interested Companies (15)

EntramPORT CHARLOTTE, FL
Andrew M JordanOakland, CA
Kerex EngineeringMartinez, CA

See All 15 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The project includes site work for a new four-stall prefabricated restroom at Mitchell Park to replace the existing two-stall restroom building onsite. Project includes demolition and disposal of existing two-stall restroom building, new concrete paving, installation and relocation of associated utility tie-ins for the new restroom, light pole removal, and replacement of existing concrete pathway section fronting the building. The prefabricated restroom building to be provided by others.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT
Solicitation # IFB No. PW-0332
The HSIP Cycle 11 and 12 Unsignalized Crossing Improvement Project, managed by the City of Santa Cruz Public Works Department, involves comprehensive roadway and pedestrian safety enhancements across five specific locations. The scope of work includes the installation of concrete curbs, gutters, curb ramps, roadway signs, pedestrian activated beacons, and thermoplastic striping and pavement markings. Work must be performed in accordance with the 2025 State of California Department of Transportation Standard Specifications, City Standard Specifications, and ADA standards. The project is divided into Cycle 11, covering Laurel Street at Blackburn Street, Broadway at Pennsylvania Avenue, and Seabright Avenue at Logan Street, and Cycle 12, covering High Street at Cardiff Place and Soquel Avenue at Poplar Avenue. This solicitation is an Invitation for Bids with a response deadline of November 5, 2026. The contract will be awarded to the lowest responsible and licensed bidder based on the City's estimated quantities of work. The successful contractor must complete the project within 50 working days and provide Faithful Performance and Labor and Material bonds each equal to 100 percent of the contract price within 10 calendar days of the award. Key administrative requirements include compliance with Department of Industrial Relations prevailing wage laws, the submission of a DIR Compliance Affidavit, and adherence to the City of Santa Cruz Quality Assurance Program. Payment terms include a 10 percent retention on the estimated value of work performed and a 20 percent retention on unused materials delivered.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 562111
New
SLED
Request for Proposals for Services Related to the City of Tustin's Solid Waste Management Franchise Agreement
Solicitation # Requests for Proposals
The City of Tustin is seeking proposals for an exclusive ten-year Solid Waste Management Franchise Agreement to provide collection services for garbage, recyclable materials, organic waste, and construction and demolition debris. The selected contractor will be responsible for the collection, transportation, and delivery of materials to city-approved facilities, ensuring strict compliance with flow-control requirements and state mandates, including SB 1383 for organic waste diversion. The contract requires the contractor to provide specific color-coded and labeled containers, with new carts manufactured from at least twenty percent recycled material. Performance is monitored through strict reliability and quality standards, including a requirement to commence new customer service within seven business days. Proposals are evaluated on a 100-point scale based on service rates, financial ability, qualifications, and customer service reliability, though the city is not obligated to select the lowest bidder. Financial requirements include a one million dollar performance bond, a twenty-five thousand dollar security check, and proof of assets covering start-up and three months of operating costs. The agreement includes a structured pricing model for residential, multi-family, and commercial services, alongside specific fees for solicitation and annual administration. Awardees must adhere to ADA compliance for on-premises collection and maintain rigorous safety and regulatory standards as overseen by the Director of Public Works.
Solid Waste Collection

POSTED

6 days ago

DEADLINE

in 3 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS