Moccasin Powerhouse Bypass Upgrades Geotechnical Investigation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The San Francisco Public Utilities Commission is initiating the Moccasin Powerhouse Bypass Upgrades Geotechnical Investigation to analyze soil and ground conditions for a proposed water bypass pipeline in Moccasin, California. Located east of the Moccasin Reservoir, the project involves a series of technical assessments including eight geotechnical borings reaching depths of 50 feet, twelve potholing sites extending 10 feet underground, and non-invasive seismic refraction and ground penetrating radar surveys. Drilling will primarily utilize mud rotary wash with hollow stem auguring as an alternative. This forecast project is managed by the San Francisco Public Utilities Commission with primary coordination through Senior Environmental Planner Timothy Johnston and Environmental Project Manager Allison Chan. The work will be performed in California within the 95347 zip code area to ensure the site is suitable for the planned infrastructure upgrades.
General Info
Agency
NAICS
Place of Performance
CA, 95347Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
