Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Mocho PFAS Treatment Plant

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Zone 7 Water Agency

Place of Performance

Santa Rita, Stoneridge, Pleasanton, CA, 94566

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Zone 7 Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Zone 7 Water Agency
Office AddressN/A
Contacts
Elke RankSr Water Resources Planner

Full Description

Show more
The Project includes construction of the Mocho PFAS Treatment Plant at an existing well site, including water treatment vessels, piping, pumps, electrical, and other appurtenances. The water treatment facility or a portion of the facilities will either be screened with a wall, or all of the facilities will be enclosed within buildings. The booster pumps will be enclosed in a building for noise attenuation. Zone 7 is continuing to evaluate the screening options. The Project would also include the installation of a new water transmission pipeline beneath Stoneridge Drive to deliver the treated groundwater into the existing transmission system (Figure 3) at the Mocho Groundwater Demineralization Plant (MGDP). The treated groundwater connection would be installed on the existing influent water pipeline at the Mocho Groundwater Demineralization Plant. Treated groundwater would then be conveyed into the existing transmission system. In addition, the Project includes improvements at the Mocho Groundwater Demineralization Plant to increase demineralization treatment capacity and salt removal. The Mocho Groundwater Demineralization Plant began operating in 2009 and included space for additional reverse osmosis (RO) membrane filters. The improvements will allow the Mocho Groundwater Demineralization Plant to operate at its originally designed treatment capacity. The existing RO membrane filters have a total brine concentrate discharge of approximately 1,064 gallons per minute (gpm). With the additional RO membranes, the anticipated total concentrate would be approximately 1,310 gpm. The existing Dublin San Ramon Services District (DSRSD) Pretreatment Program Industrial Wastewater Discharge Permit, dated July 1, 2025, specifies that the rate of discharge shall not exceed an average of 1.6 million gallons per day (MGD). It is anticipated that the additional RO membranes would increase the total rate of brine concentrate discharge to an average of 2 MGD. The final RO membrane brine concentrate discharge rate will be determined during the detailed design phase and the discharge modifications are subject to the review and approval of DSRSD and East Bay Dischargers Authority. The installation of the membranes will likely require replacement of ancillary mechanical and electrical equipment, potentially including the pumps, variable frequency drives (VFDs), motor control center (MCC), switchgear, and other appurtenances. The Project also includes replacing the well pumps at Mocho Wells 2, 3, and 4 due to the pumps reaching the end of their useful lives and evaluating the use of higher pressure pumps and variable frequency drives for these pumps to meet the Mocho PFAS Treatment Plant hydraulic needs. Furthermore, as part of the Mocho PFAS Treatment Plant project, the “Wells and Mocho Groundwater Demineralization Plant Electrical Modernization Project” subtask includes replacing the existing switchgear and ancillary electrical equipment at Mocho Wells 3 and 4 due to the equipment exceeding their useful lives and will be sized to accommodate the Project’s electrical demands. The Project could be constructed to treat the entire Mocho wellfield capacity of approximately 16 MGD. This full wellfield PFAS treatment project is evaluated herein. However, Zone 7 is also continuing to evaluate smaller capacity PFAS treatment options at this wellfield that may result in reducing the footprint of facilities that are initially installed without meeting the Project’s secondary objective. The Mocho PFAS Treatment Plant Project would consist of the following key components (also see Figure 4 and pre-conceptual architectural renderings Figure 5a-5c): • Water transmission line – A new water transmission pipeline beneath Stoneridge Drive to deliver treated water to the Mocho Groundwater Demineralization Plant. • Pipeline – A pipeline at Mocho Well 3 to split water between the Mocho Groundwater Demineralization Plant and the new treatment plant. • PFAS treatment vessels – Vessels containing ion exchange resin (“media”) for removal of PFAS from the groundwater. • Cartridge filters – Pre-treatment cartridge filters to remove sediment from the water before it enters the PFAS treatment vessels. • Booster pump station – A booster pump station may be needed to increase water pressure needed to enable treatment. Booster pumps to be housed in a new building to attenuate noise. • Media truck driveway – A driveway for trucks to remove and replace the media approximately once every two years. • Switchgear – As part of the “Wells and Mocho Groundwater Demineralization Plant Electrical Modernization Project” subtask, the existing switchgear and ancillary electrical equipment at Mocho Wells 3 and 4 would be replaced due to the equipment exceeding their useful lives and would be sized to accommodate the Project’s electrical demands. • Electrical building – A separate building may be constructed to house electrical facilities. • Well pumps – The existing well pumps at Mocho Wells 2, 3, and 4 would be replaced due to the equipment reaching the end of their useful lives and to meet facility hydraulic needs. • Additional Mocho Groundwater Demineralization Plant Capacity – Additional reverse osmosis membrane filters would be installed within existing facilities originally designed and constructed to house them in order to increase treatment capacity and salt removal. The existing membrane filters have reached the end of their useful life and would be replaced. Ancillary equipment, such as the associated pumps, electrical equipment, and other mechanical equipment, would be upgraded as needed within the existing project facilities. • Site lighting – The site would be designed with lighting to facilitate safe operations and maintenance of the facilities. The lighting would be designed to minimize public impacts (e.g., motion activation switches, shields or hoods directing light downward, etc. to minimize light spillover, reduce glare, and prevent light trespass onto adjacent properties or into the night sky, in accordance with local lighting standards). • Site security - The facilities would be secured within walls or a building to secure the treatment vessels, electrical equipment, piping and other mechanical equipment. • Site finishes – The facilities would utilize paint colors and exterior finishes that are visually compatible with the surrounding built environment. • Vegetative plantings (e.g., trees, shrubs) and/or other amenities for visual screening of the treatment facilities to promote integration with the surrounding area. • Stormwater management features – Stormwater treatment facilities and site drainage structures to be constructed at Mocho Well 3 in accordance with the San Francisco Bay Regional Water Quality Control Board’s Municipal Regional Stormwater Permit requirements. The bioretention stormwater treatment facility, consisting of a swale with native drought-tolerant shrubs and plants, is anticipated to be approximately 1,200 square feet, with its location on the Mocho Well 3 site to be determined upon further existing utilities and soils investigations. • Trail restoration and tree replacement for any removal or damage.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 9 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS