Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Rio Americano High School Stadium Improvements Project

Forecast
2026010094State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Rio Americano High School Stadium Improvements Project, led by the San Juan Unified School District, aims to upgrade the existing Raider Stadium in Sacramento, California, to enhance its role as a community center and increase capacity for events. The scope of work includes the installation of four 80-foot high-mast LED light poles for the stadium and six 15-foot-tall light poles along the paved fire lane to ensure pedestrian safety. Additionally, the project involves replacing existing bleachers with new seating for approximately 2,500 to 2,575 people, installing a new prefabricated press box with HVAC and data equipment on the south side, and upgrading the public address system. The project also requires the removal of existing metal storage sheds and SMUD wood light poles. The project is subject to rigorous environmental and regulatory compliance under the California Environmental Quality Act (CEQA). Key requirements include adhering to International Dark-Sky Association guidelines to minimize light pollution and following strict protocols for the protection of tribal cultural resources and the handling of inadvertently discovered Native American human remains. The project has undergone extensive review, including a Draft Environmental Impact Report and consultations with the Native American Heritage Commission and the Department of Toxic Substances Control regarding soil testing and hazardous materials. Project administration is managed by Nicholas Arps of the San Juan Unified School District and Suzanne McFerran of AECOM.

General Info

San Juan Unified School District upgrading Rio Americano stadium lighting, seating, and press box.

Place of Performance

Saverien Drive, Sacramento, CA, 95864

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Juan Unified School District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Nicholas ArpsDirector of Facilities
Suzanne McFerranProject Manager

Interested Companies (1)

AecomDenver, Colorado

Full Description

Show more
San Juan Unified is proposing to improve the existing Raider Stadium within the existing Rio Americano High School Campus, by adding high mast light standards, additional bleacher seating, an upgraded public address (PA) system, and a new press box. New light standards would also be installed along the existing paved fire lane between the stadium and the main campus parking lot, to provide for pedestrian safety. Four permanent high mast LED light poles (approximately 80 feet tall) would be installed at the existing Raider Stadium. In addition, six new approximately 16-foot-tall light poles would be installed between the south end of the existing main parking lot (which is accessed at the campus entrance from American River Drive at Saverien Drive) and the stadium entrance, along the existing paved fire lane, which would serve as the proposed pedestrian travel route; this lighting would provide nighttime visibility for pedestrian safety. The existing bleacher seating would be replaced with new bleacher seating on the north (visitor side) of the stadium and new bleacher seating on the south (home side) of the stadium accommodating a total capacity of approximately 2,500 people. A new press box would also be installed as part of the bleacher seating on the south (home side) of the stadium. The proposed project also includes removing the existing metal storage sheds on the northwest side of the stadium, and a small storage shed on the south side of the stadium. Two existing Sacramento Metropolitan Utility District (SMUD) wood light poles within the campus fire lane (which would be used for pedestrian ingress and egress) would also be removed after the installation of new lighting. Finally, the existing PA system would be upgraded.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 10 hours ago

DEADLINE

in about 1 year
View Details

More opportunities from California → San Juan Unified School District

Same awarding agency

NAICS: 541519
New
SLED
Firewall Appliance And Support Erate YR 2027 (YR30)
Solicitation # 27-109
The San Juan Unified School District is soliciting proposals under RFP 27-109 for Category Two Network Equipment, specifically for Firewall Appliance and Support. The scope of work includes the procurement, configuration, and installation of three PA5540 appliances across two locations, configured as active clusters for traffic load balancing. The contract requires the provision of 400GBase-AOC direct attach cables and a five-year term of premium support. This procurement is Erate eligible, and the successful service provider must comply with all Erate labeling and certification requirements, including the submission of the Service Provider Annual Certification form. The contract will be awarded based on best value, with evaluation weights distributed across responder cost (35%), experience with the District (25%), recurring annual support costs (15%), quote thoroughness (15%), and client references (10%). Bidders must meet strict insurance requirements, including commercial general liability and automobile liability of 2 million dollars per occurrence. Additionally, responders must certify they are not debarred from federal transactions and must conduct criminal background checks for all employees with campus access. Invoicing is handled through USAC via Form 474, with the District responsible for the non-discounted share of costs. Proposals are due by December 8, 2026, at 4:00 PM.
Other Computer Related Services

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 423690
New
SLED
Switch Equipment - Erate YR 2027 (YR30)
Solicitation # 27-108
The San Juan Unified School District is soliciting proposals under RFP 27-108 for the procurement of Erate eligible Category Two network switch equipment. This fixed price contract focuses on the acquisition of HPE Aruba Networking CX 6200F switches and 10G SFP+ direct attach copper cables for various district locations, including Carmichael, Greer, and James R. Cowan elementary schools. The project is scheduled to commence on April 1, 2027, with a response deadline of December 9, 2026. Qualified bidders must be certified resellers and maintain FCC Green Light Status, as those in Red Light Status will be disqualified. Evaluation criteria include the provider's length of experience, the submission of three reference sites with at least three years of service, a proposed implementation timeline, and a detailed cost proposal covering hardware, shipping, and taxes. Providers must comply with FCC Lowest Corresponding Price rules and certify that equipment does not contain components from vendors listed under The Secure Networks Act. Administrative requirements include the submission of the Service Provider Annual Certification (SPAC) and adherence to specific insurance minimums, including 2 million dollars for Commercial General Liability and Automobile Liability. Payment will be processed partially through USAC via Form 474, with billing prohibited before July 1 of the funding year. Proposals must be submitted in a non-bound format and include all required submittal pages and pricing schedules.
Other Electronic Parts and Equipment Merchant Wholesalers

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 517311
New
SLED
RFP 27-107 Data Transport Service - Erate YR 2027 (YR30) Ethernet Service
Solicitation # 27-107
The San Juan Unified School District is soliciting proposals under RFP 27-107 for a multi-year contract to provide point-to-multi point Lit Fiber Optic Ethernet Transport Service. The scope of work involves the installation and ongoing operation of transport services, with specific options for 10 Gbps and 20 Gbps Ethernet services. The contract offers two term options: a five-year term or a three-year term with two optional annual extensions, with a scheduled start date of July 1, 2027. The awarded service provider must own and maintain all equipment and comply with Federal Erate Year 2027 (Year 30) and California Teleconnect Funds requirements. Proposals are due by December 8, 2026, and must be submitted in a non-bound format. Selection will be based on best value, with evaluation weights assigned to responder cost (35%), experience with the district (20%), implementation timeline (20%), service level agreement (15%), and quote thoroughness (10%). Mandatory requirements include a valid Service Provider Identification Number (SPIN), annual SPAC certification, and compliance with the Secure Networks Act. Additionally, providers must provide proof of comprehensive auto liability insurance of $2 million per occurrence and $4 million aggregate, issued by an A+ rated insurer. Bidders must also certify that all employees with campus access have passed required criminal background checks per Education Code Section 45125.1.
Wired Telecommunications Carriers

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS