Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

MODIFY PIPING SYSTEM, TANK 20, F-900

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope elements were truncated from a previous contract that work was de-scoped from. Project will perform the following. a]. Modify 18-inch line tie-in tank #20 including installation of piping's to allow defuel into and refuel from the tank. b]. Install (1) 6” and (1) 10” double block and bleed valve. c]. Install 150-lf of 10” diameter stainless steel piping with (2) Class 150 flanges including pipeline supports. d]. Install 100-lf of 6” diameter 304L stainless steel piping with (2) end of the pipeline shall be welded into the existing 18” Tank 21 / Tank 22 hydrant loop defueling line, and the other end of the pipeline shall be welded into the existing 6” Tank 20 issue line; and e]. Pressure test the new piping. Additional scope of work includes the following: 1] Perform tank draining and gas free testing, 2] Repair metal grate stair steps [1st, 14th, 30th, 46th and 56th].