NASA Kennedy Space Center is issuing a firm-fixed price delivery order under the Multiple Awards Schedule program to procure a 40 by 24 foot modular structure for the Tropospheric Doppler Radar Wind Profile facility. The contract is anticipated to be awarded to Red Guard Cover Six to provide a commercial off the shelf structure that functions as a Faraday Cage. This acquisition is being expedited due to urgent national security requirements and the discovery of structural deficiencies and mold at the existing site, which necessitated the immediate replacement of the facility to avoid delaying critical Eastern Range launches. The modular structure must be deployed within 14 calendar days to ensure the installation of upgraded radar equipment and to maintain operational support for approximately 100 launches per year, including the Artemis III mission. Failure to procure this facility quickly would jeopardize the schedule for future launches and the overall functionality of the J5-0341 facility. The project is managed by the NASA Kennedy Space Center in Florida under solicitation number 80KSC026Q0007.
General Info
Agency
NAICS
Place of Performance
FL, 32899, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Requirement: This acquisition is conducted under the Multiple Awards Schedule (MAS) Program (Title 41 U.S.C. 152(3)). This action is for a new firm-fixed price delivery order for a 40’ by 24’ Modular Structure delivered to the Tropospheric Doppler Radar Wind Profile (TDRWP) at KSC (J5-0341) and assembled into a conjoined double-wide structure similar to a modular trailer.
It is anticipated that award will be made to Red Guard Cover Six under General Services Administration (GSA) Federal Supply Schedule (FSS) GS-07F-0761X, Special Item Number (SIN): 332311P, SIN Title: Pre-Engineered and Prefabricated Buildings and Structure.
Rationale: FAR 8.401(b)/GSAM 538.7104-3(b)(i), urgency justification:
- Chronology: In late 2025, the United States Space Force entered into an interagency agreement with NASA KSC to provide upgraded radar capabilities at the J5-0341 TDRWP facility owned and operated by NASA. This multi-million-dollar upgrade required refurbishment of a small hardware trailer to install new upgraded equipment. Unforeseen site conditions, including mold, structural deficiencies, and rotted framework were not discovered until recently, necessitating a stop-work condition to repair or replace the facility. NASA determined that it was in the Government’s best interest to quickly replace the building with a readily available Commercial Off the Shelf (COTS) modular structure that met the EMI intent of a Faraday Cage structure, with enough square footage to allow for the efficient installation of the new hardware. Due to critical national security requirements and support for multiple critical Eastern Range launches in the fall of 2026, this modular structure must be ready to deploy in the field within 14 calendar days and must not involve custom design work or require substantial site preparation or construction support.
- Planning: The schedule agreed to by stakeholders to complete the project by September 2026 included a critical path through the effort to incrementally disassemble parts of J5-0341 for refurbishment while maintaining operational capabilities for as long as possible. The facility serves every Eastern Range launch – averaging 1 every 3.5 calendar days. The unforeseen site conditions at the facility were discovered in June 2026, and the Government worked to find a solution and funding as quickly as possible. The project was constrained by the Artemis II launch and refurbishment of the existing facility structure could not start prior to the launch.
- Harm to the Government: The Government will face irreparable harm by not procuring this facility quickly and the equipment cannot be installed until this modular structure is assembled in place on-site. This would jeopardize all future TDRWP support for an estimated 100 launches per year, including Artemis III in the spring of 2027.
Similar Contracts
Same NAICS industry code
More opportunities from National Aeronautics And Space Administration → NASA Kennedy Space Center
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS