Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Module 5, Phase E Liner System Project - Extended

Closed
757-7524-01AState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 9 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract, identified as Solicitation Number 757-7524-01A and titled Module 5, Phase E Liner System Project - Extended, encompasses the full scope of construction activities for the landfill liner system at the Neal Road Recycling and Waste Facility in Butte County, California. Work includes subgrade preparation, general fill placement, installation of advanced landfill liner components such as high-density polyethylene geomembranes, geosynthetic clay liners, geocomposite drainage layers, and nonwoven geotextile filters, as well as the furnishing and installation of landfill gas collection piping, LCRS pump systems, HDPE piping, and associated water supply infrastructure. Additional required services include electric leak location surveys conducted by a third-party firm, traffic control, excavation, earthwork, clearing and grubbing, construction surveying with as-built documentation, and compliance with strict environmental controls for air and water pollution. All work must adhere to the 2025 Standard Specifications and Standard Plans of the California Department of Transportation, supplemented by project-specific Special Provisions that take precedence in case of conflict, and must align with the approved CQA Plan, which mandates independent third-party verification of material quality, installation methods, seam integrity, and nondestructive testing procedures for all liner components. The contract requires the successful bidder to submit a sealed proposal by the deadline of June 2, 2026, and includes mandatory bid security of at least ten percent of the total bid amount in the form of cash, certified check, cashier’s check, or a bidder’s bond. Bidders must certify compliance with federal and state debarment, suspension, and employment equity requirements, including adherence to Executive Orders on equal opportunity and submission of EEO-1 reports. Contractors must hold valid California licenses, and all subcontractors are subject to the same licensing and compliance obligations. Performance and payment bonds are required upon award, along with workers’ compensation and liability insurance meeting state standards. The project is subject to prevailing wage rates, OSHA regulations, and the use of designated management systems including CMIS for document submission and LCP Tracker Pro for certified payroll reporting. Work must commence within 15 calendar days of contract signing and be completed within the timeframe stipulated in the Special Provisions, with progress monitored weekly by the Engineer who provides detailed status reports to the Contractor. Final payment is contingent upon Engineer recommendation, Board of Supervisors acceptance, and the filing of a Notice of Completion. The contract is awarded to the lowest responsible

General Info

Construction of Module 5, Phase E landfill liner in Butte County, including prep, installation, and gas piping.

Documents

5

Module 5 Phase E Liner Project Addendum No. 2

PDF, High priority: read this firstamendment
High

Module 5, Phase E Liner System General and Special Provisions Proposal and Contract

PDF, High priority: read this firstrfp
High

Butte County Neal Road Recycling and Waste Facility Module 5 Phase E Base Liner System Plans

PDF, Low priorityconstruction-drawings
Low

M5E Base Liner Plan - External - 20260506

TXT, Low prioritydrawing-transmittal
Low

M5E BASE LINER PLAN - EXTERNAL - 20260506.dwg

DWG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Butte - Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The work, in general, to be done under this contract consist of, but is not limited to preparing the subgrade for construction of the landfill liner, placement of general fill, furnishing and installing landfill liner components and related items, furnishing and installing landfill gas collection piping and related items, electric leak location services, and traffic control, within the limits of Module 5, Phase E all in conformance with the Standard Specifications, and these Special Provisions, unless specified herein, and shall include the furnishing of all tools, equipment, materials, supplies, incidentals, and manufactured articles for the project, all in conformance with State of California, Department of Transportation 2025 Standard Specification and Standard Plans, Butte County Standard Details, and the attached contract specifications and the details as shown on the contract plans entitled Module 5, Phase E Liner System. THIS IS A CONTINUATION OF THE ORIGINAL BID POSTED ON MAY 5, 2026 SEE: Public Purchase: Bid IFB #757-7524-01A - Module 5, Phase E Liner System Project

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS