Stormwater Improvements - Pikes Peak Park

Closed
26-029State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 14 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 20 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves stormwater improvements for the Pikes Peak Park Subdivision, a development planned since 2023 but not yet constructed. These improvements are tied to the upcoming construction of Sun Mountain Blvd, spanning from 24th St to 31st St, scheduled for the current year. The work is crucial to managing stormwater effectively, ensuring flood control and maintaining water quality in accordance with the City of Pueblo Stormwater Criteria and MS4 permit requirements. This solicitation, numbered 26-029 and posted on May 26, 2026, falls under the jurisdiction of the Colorado Public Works office in Pueblo. Interested parties must submit their responses by June 17, 2026. Key contacts for this project include Bob Quintana, Civil Engineer for Public Works, and Deborah Rivera, Purchasing Contract Administrator. The project is a state and local government endeavor focused on enhancing infrastructure to support future development safely and sustainably.

General Info

Stormwater improvements for Pikes Peak Park tied to Sun Mountain Blvd construction, deadline June 17, 2026.

Documents

8

Federal Labor Standard Provisions for Construction Contracts

PDF, High priority: read this first10 pages · wage-determination
High

IFB 26-029 Stormwater Improvements - Pikes Peak Park

PDF, High priority: read this firstifb
High

Sample Contract Documents - City of Pueblo

PDF, High priority: read this first8 pages · contract-document
High

Sample Contract Documents for CDOT Projects - Notice of Award and Contract Agreement

PDF, High priority: read this first8 pages · contract-document
High

Section 3 Utilization Plan - City of Pueblo HUD Compliance Guide

PDF, High priority: read this first16 pages · policy-guide
High

26-029 Pikes Peak Improvement Plans Stormwater Improvements Final

PDF, Low priorityother
Low

City of Pueblo Licensing and Sales Tax Information for Construction Contractors

PDF, Low priority6 pages · other
Low

FFATA Reporting Form for City of Pueblo

PDF, Low priority1 page · ffata-reporting-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Public Works
Contacts2 people available
OfficePueblo, CO, 81003, USA
Organization / AgencyColorado → Public Works
Office AddressPueblo, CO, 81003, USA
Contacts
Bob QuintanaCivil Engineer Public Works
Deborah RiveraPurchasing Contract Administrator

Interested Companies (30)

Gray Matter ConstructionPueblo, CO
ConstructconnectCincinnati, OH
Tarahumara TruckingAurora, CO

See All 30 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
These improvements were designed back in 2023 with the Pikes Peak Park Subdivision that currently has not been developed. With the construction of Sun Mountain Blvd from 24th St to 31st St scheduled for this year these improvements are necessary to safely convey stormwater flows and serve the road for flood control and water quality per the City of Pueblo Stormwater Criteria and MS4 permit requirements.

More opportunities from Colorado → Public Works

Same awarding agency

New
SLED
Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2
Solicitation # 26-067 (EW2601)
Solicitation 26-067 (EW2601) is an invitation for bid issued by the City of Pueblo Public Works department for the rehabilitation of cart paths at the Elmwood Golf Course in Colorado. The project scope involves removing existing asphalt surfaces and replacing them with new 4-inch concrete, adhering to the 2026 Standard Construction Specifications and Standard Details for the City of Pueblo. Key technical requirements include maintaining a minimum daily compaction of 95% for fill areas and prohibiting earthwork when wind speeds exceed 30 mph to control dust emissions. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid, with the City maintaining sole discretion over the award. The project must be completed within 60 calendar days from the Notice to Proceed, and the successful bidder must file the Contract Agreement along with Payment and Performance bonds within ten days of the award notice. Bids require a security deposit of five percent of the grand total bid. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance. Compliance with the Davis-Bacon Act, state and federal safety regulations, and non-discrimination laws is mandatory. Additionally, the contractor must provide a certified Traffic Control Supervisor's certification from ATSSA or CCA during the pre-construction conference.

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo has issued Invitation for Bid 26-035 for the West Side Improvements - Bus Stops Package 1, a project focused on enhancing community connectivity, mobility, and ADA compliance. Funded by a U.S. Department of Transportation Federal Highway Administration RAISE Grant, the scope of work involves the rehabilitation of 23 existing bus stops. Key deliverables include the installation of new concrete pads, sidewalks, curb and gutter, upgraded curb ramps, benches, and illuminated signs. The project is governed by the Colorado Department of Transportation 2025 Spec Book and requires strict adherence to Buy America and Build America Buy America requirements for projects receiving $500,000 or more in federal-aid highway funding. Bidders must be registered on SAM.gov and are required to perform at least 30 percent of the total original contract price with their own organization. Compliance with the Davis-Bacon Act for prevailing wages, as well as federal nondiscrimination and EEO standards, is mandatory. Submissions must be made electronically via the OpenGov portal and must include a bid security of 5 percent of the grand total bid. The contractor is responsible for a two-year warranty on all materials and workmanship from the date of final acceptance. Additionally, contractors must comply with City of Pueblo licensing and sales tax requirements, including mandatory tax prepayments for contracts valued at $100,000 or more.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Construction of Sun Mountain Boulevard
Solicitation # 26-009
The City of Pueblo has issued solicitation 26-009 for the construction of Sun Mountain Boulevard, a project designed to improve community connectivity and economic vitality. The scope of work involves constructing a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, featuring ADA-compliant curb ramps, storm sewers, water mains, and a double box culvert. This effort is part of the broader West Side Improvements Project, which also includes the implementation of 67 bus stop locations. The project is funded through a Federal Highway Administration RAISE Grant, necessitating strict adherence to federal regulations, including the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America requirements, and FHWA-1273 contract provisions. The contract will be awarded to the responsible bidder providing the lowest responsive bid. Bidders must submit their proposals electronically via OpenGov by October 21, 2026, accompanied by a bid security of 5 percent of the total bid. Successful contractors must provide performance and payment bonds within ten business days of the award and comply with various certifications, including non-collusion, tax liability, and EEO requirements. Performance is governed by the 2025 CDOT Spec Book and project-specific special provisions, with a two-year warranty on all materials and workmanship. Additionally, contractors must adhere to City of Pueblo licensing and sales tax regulations, including a 3.7 percent sales and use tax.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 7 days
View Details
NAICS: 238160
New
SLED
Roof Replacement - 442 Keeler Parkway
Solicitation # 26-056
Solicitation 26-056 is a lump sum contract issued by the City of Pueblo Public Works department for the roof replacement at 442 Keeler Parkway in Colorado. The project involves the removal and disposal of the existing roof system and insulation down to the concrete deck, followed by deck preparation and the installation of a 60-mil TPO roof system. Key deliverables include the installation of 24-gauge galvanized sheet metal slip type counter-flashings, replacement of overflow scuppers, penetration flashings, roof jacks, VTR flashings, rain collars, and damaged drain rings, as well as the installation of a new walkway. The completed work must include a 20 year NDL warranty and adhere to all manufacturer requirements. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid, based on the total base bid plus any selected alternates, such as upgrading to a 1/2 inch Dens Deck cover board or fleece backed TPO membrane. Bidders must submit responses via OpenGov by October 28, 2026, including a bid security of 5 percent of the grand total bid. The successful contractor must provide payment and performance bonds within ten business days of the award and commence work within three calendar days of contract execution. Administrative requirements include compliance with the Davis-Bacon Act, HUD Section 3 utilization for labor, and various non-discrimination and safety regulations. Payments are based on the actual number of units installed and are processed by the 21st day following the approval of a detailed monthly estimate by the Engineer. Final acceptance is contingent upon approval from the Southern Colorado Building Department and the Facilities Maintenance Superintendent. Builder's risk insurance is required with a maximum permitted deductible of 2,500 dollars.
Roofing Contractors

POSTED

5 days ago

DEADLINE

in about 4 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS