Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Monache Meadow Access Road

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife (CDFW) is planning the Monache Meadow Access Road project in Tulare County, California. This initiative involves the construction of a new 1,400-meter, 8-foot-wide access road designed to traverse rocky and sagebrush-dominated upland terrain. The primary objective is to redirect traffic away from sensitive meadow and riparian habitats, allowing for the permanent closure and ecological restoration of the existing access road. The new route will connect the southwest boundary of the Monache Meadows Wildlife Area to the existing cabin site and link with Beck Meadow/Deer Island Road. Key project deliverables include the installation of a secure gated entrance at the transition between U.S. Forest Service land and CDFW property, as well as the implementation of erosion control measures such as water bars and out-sloping to maintain hydrologic stability. The project is categorized as a forecast and is currently exempt under California Code of Regulations Title 14, Sections 15307 and 757(7)(D), as it is a regulatory action for the protection of natural resources. Administrative oversight is managed by the CDFW Region 4 - Central office in Fresno, with Evan King serving as the primary environmental scientist contact. No specific contract value, award basis, or federal FAR clauses are applicable as this is a state-level environmental project.

General Info

CDFW builds 1,400m low-impact road to replace sensitive habitat access, closes original, restores land, ensures controlled entry.

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

Place of Performance

Tulare, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Evan KingEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) proposes the construction of a new access road across upland terrain to enable the rehabilitation and eventual decommissioning of the existing access road, which currently traverses meadow and riparian habitat. Following construction, the existing road will be permanently closed and restored to its natural condition to support ecological recovery and habitat integrity. The proposed access road will extend approximately 1,400 meters (4,593 feet) from the southwest boundary of the Monache Meadows Wildlife Area to the existing cabin site. The road will have an approximate width of 8 feet and will be sited primarily within rocky and sagebrush-dominated upland habitat, thereby minimizing environmental disturbance. Construction will involve minimal grading, and appropriate erosion control measures - such as water bars and out-sloping - will be employed on steeper segments to maintain hydrologic stability and prevent sediment transport. The proposed alignment will connect with Beck Meadow/Deer Island Road just west of the existing South Fork Kern River crossing. A new gated entrance will be installed at the point where the new access route transitions from U.S. Forest Service land to CDFW-managed property, to ensure secure and controlled access. This project has been designed with careful consideration of ecological sensitivity and long-term land stewardship goals.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 13 hours ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS