Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on June 10, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Monitor Well Installation - Drilling Services Project Shoal Area in Churchill County, Nevada

Closed
5158-PZFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

6 days ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This contract, solicitation number 5158-PZ, covers drilling services for monitor well installation within the Shoal Area of Churchill County, Nevada. The scope of work includes drilling two new boreholes to a maximum depth of 2100 feet below ground surface, performing geophysical logging, and completing these boreholes with monitoring wells, piezometers, and electric submersible pumps. Additionally, the project requires the modification of existing infrastructure by removing the casing from well HC-2, deepening that borehole to 2100 feet, and completing it with a new well and pump. The contractor is also responsible for installing a PVC water access tube in water supply well HS-1 to facilitate the collection of hydraulic head data.

General Info

Drilling and installing monitor wells and pumps in Churchill County, Nevada, solicitation 5158-PZ.

Agency

N/A

NAICS

213111 - Drilling Oil and Gas Wells

Place of Performance

From Fallon drive east on US Hwy 50 approx. 32 miles to the intersection of State Hwy 839. Turn South, (right) on State Hwy 83, Churchill County, NV, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jun 12, 2014 to Jun 23, 2014. The notice description changed.

Deadline changed

Response deadline changed from Jun 23, 2014 to Jun 12, 2014.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Julie M. HendricksContract Administrator
Fred HudsonContract Administrator

Full Description

Show more
Drill two boreholes to a maximum depth of 2100 feet below ground surface (bgs), geophysically log boreholes, complete boreholes with monitoring wells and piezometers, develop wells and piezometers, and install electric submersible pumps in the wells. Remove well casing from existing well HC-2, deepen the existing borehole to a maximum depth of 2100 fee bgs., geophysically log borehole, complete borehole with a well, develop well, and install an electric submersible pump in the well. Install a PVC water access tube in the water supply well HS-1 to allow the collection of hydraulic head data.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS