This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Monongahela National Forest FR 81 Bridge Work
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Monongahela National Forest is seeking a contractor to design and construct a single span bridge on Forest Road 81, featuring a steel girder framework, timber deck, and full-width timber wearing surface. The scope of work encompasses all necessary preparatory and structural activities including surveying and staking, environmental and site preparation, clearing and grubbing, cofferdam installation with dewatering, excavation for riprap placement, removal of the existing bridge, installation of H-piles, subbase and aggregate roadway materials, riprap armoring, and final wearing surface application. All work must adhere to strict environmental and engineering standards to ensure long-term structural integrity and minimal ecological disruption in the forested area. The solicitation, identified as 12445526Q0100, was posted on July 15, 2026, with responses due by August 12, 2026. This is a total small business set-aside under NAICS code 237310, reserved exclusively for small businesses as defined by the SBA. The contracting office is the USDA Forest Service, represented by the CSA East 13 office in Atlanta, Georgia, and managed by primary point of contact Brad Higley, reachable via email. Despite the forest’s location, the place of performance is listed in Dyer, Nevada, which may indicate a clerical or administrative discrepancy in the record. The official opportunity can be accessed through the SAM.gov portal for detailed specifications and submission instructions.
General Info
Agency
Contract Value
$1,297,769NAICS
Place of Performance
Dyer, NV, USASet-Aside
Awardee
Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Monongahela National Forest has a requirement for furnishing and installing one (1) single span steel girder, timber deck, and full width timber wearing surface bridge on FR 81 on the Monongahela National Forest. The work shall include, but not be limited to, construction survey and staking, E&S, clearing and grubbing, installation of cofferdam and dewatering the site, excavation for placement of riprap, removal of existing structure, installation of bridge structure, wearing surface installation, H-Pile installation, roadway subbase and aggregate, and riprap armoring.
More opportunities from Department Of Agriculture → Csa East 13 Usda-Fs
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
