Monument Bridge at Canal Trail Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Pleasant Hill, in collaboration with the City of Concord, is planning surface stabilization and access control enhancements beneath the Monument Boulevard Bridge abutment to safeguard the adjacent flood control channel and ensure stable ground grades. The project involves subgrade preparation, the installation of an 8-inch riprap layer stabilized with grout to prevent erosion and maintain structural integrity, and the placement of prefabricated concrete vertical barriers designed to restrict unauthorized access and contribute to long-term site stability. These improvements are critical to preserving the functionality of the flood control infrastructure and mitigating potential degradation from human activity or environmental stressors. The project is formally listed under the title Monument Bridge at Canal Trail Project with a posted date of June 12, 2026, and is classified as a forecast announcement. The primary point of contact is Shawn Hung, Associate Engineer, reachable via email at shung@phillca.gov or phone at 925-671-5263. Work will be performed within the municipal boundaries of Pleasant Hill, California, with a ZIP code of 94523. While no solicitation number, NAICS code, or set-aside details are provided, the initiative reflects a coordinated local effort focused on infrastructure resilience and public safety in a flood-prone corridor.
General Info
Agency
NAICS
Place of Performance
Monument Boulevard & Mohr Lane, Pleasant Hill, CA, 94523Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
