Morada Area Streets Resurfacing 2026

Forecast
222501State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Morada Area Streets Resurfacing 2026 project, managed by the San Joaquin County Public Works Department, focuses on repairing and resurfacing existing roadways to address oxidation, alligator cracking, pavement failure, longitudinal cracking, and rutting. The scope of work covers specific sections of Hazel Road, Oak Lane, Plum Avenue, and Trenton Court. Key technical activities include cold planing and replacing pavement and base on Trenton Court and Plum Avenue, overlaying Hazel Road and Oak Lane with Hot Mix Asphalt (HMA) Type A, and repairing pavement structure failures. Additional requirements include replenishing four-foot-wide shoulder backing, applying penetration treatment at intersection radii, adjusting utility manholes and survey monument frames, and constructing various types of HMA driveways. The project is classified under a categorical exemption as it involves repairing existing roads without altering road configurations or adding travel lanes. Due to the rural environmental setting and the presence of protected species, a pre-construction survey for nesting Swainson's Hawks and other migratory birds is recommended if work occurs between February 15th and September 1st. This initiative aims to increase public safety, reduce road hazards, and decrease long-term maintenance needs within the project area. The primary point of contact for the agency is Assistant Planner Fatima Gutierrez.

General Info

San Joaquin County will resurface and repair roads in the Morada Area 2026.

Agency

California → San Joaquin County

Place of Performance

Ashley Lane, Trenton Way, Morada Lane, CA

Set-Aside

categorical_exemption

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A

Full Description

Show more
MORADA AREA STREETS RESURFACING 2026 Project Description Project Location: Hazel Road: Ashley Lane to Oak Lane; Oak Lane: Hazel Road to west end; Plum Avenue: Oakwilde Avenue to Morada Lane; Trenton Court: Trenton Way to west end. See attached Vicinity Map. Project Justification: The original construction date of the roads is unknown. The project area has been periodically slurry sealed with the most recent slurry seal in 2017. The existing roadways are oxidized and consist of the following deficiencies: alligator cracking, pavement failure, longitudinal cracking and rutting. Scope of Work: The project will consist of: 1. On Trenton Court, cold planing 0.75 feet of pavement and base (24-32 feet wide) and replacing with 0.5 feet of aggregate base and 0.25 feet Hot Mix Asphalt (HMA) (Type A). 2. On Plum Avenue, cold planing 0.17 feet of pavement (14 feet wide) and replacing with 0.17 feet HMA (Type A). 3. On Hazel Road and Oak Lane, overlaying with 0.17 feet HMA (Type A). 4. Repairing Pavement Structure failure areas with full depth 0.25 feet HMA (Type A). 5. Replenishing 4-foot-wide shoulder backing: to conform along roadway edge of pavement where needed. 6. Applying Penetration Treatment at all intersection radii plus 50 feet or to conform. 7. Adjusting utility manhole and 2 survey monument frames and covers to finished grade. 8. Constructing 2 feet HMA (Type A) driveways (Type ES). 9. Constructing 8 feet HMA (Type A) driveways (Type E). 10. Constructing 8 feet HMA (Type A) driveways (Type D). Environmental Setting: In these portions of the San Joaquin County, land usage is primarily rural with single family homes. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with these well-maintained roads. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS