Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Morgan Hill Library Roof Replacement

Closed
20260618041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
San Diego Convention Center West Roof Replacement
Solicitation # K-27-2513-DB2-3
The City of San Diego is seeking a qualified Design-Builder for the San Diego Convention Center West Roof Replacement project. This effort involves the design, permitting, and construction of a complete, durable, and watertight roofing and drainage system to replace the original 1989 roof on the West Building. A critical requirement of the project is maintaining substantially uninterrupted operations of the convention center, requiring the contractor to implement strategic phasing and mitigation measures for noise, odor, and public safety to accommodate high-profile events such as Comic-Con. The scope also includes coordinating improvements with existing rooftop mechanical, electrical, plumbing, and photovoltaic systems, as well as evaluating roof safety tie-back anchor systems. The procurement process begins with a Statement of Qualifications (SOQ) due by November 4, 2026, which will be evaluated based on the proposed method of work, equal employment and contracting opportunity, technical competence, local environment knowledge, project organization, and litigation history. To be considered responsive, submitters must be pre-registered with the City's eBidding system and provide all required Equal Opportunity Contracting Program information. The project mandates compliance with State prevailing wage rates and the Subletting and Subcontracting Fair Practices Act. Additionally, contractors must adhere to CARB regulations for off-road diesel fleets, including specific vehicle labeling requirements. Payment will be managed through the City's Prism portal, with retention released based on incremental acceptances determined by the project Engineer.
City of San Diego

POSTED

about 14 hours ago

DEADLINE

in 30 days

General Info

Place of Performance

Campbell, CA, 95008, USA

Set-Aside

NONE

Documents

6

ITB-LIB-FY26-0714 Addendum #1 - Morgan Hill Library Roof Replacement

PDF, High priority: read this firstamendment
High

ITB-LIB-FY26-0714 Addendum #2 - Morgan Hill Library Roof Replacement

PDF, High priority: read this firstamendment
High

ITB-LIB-FY26-0714 Morgan Hill Library Roof Replacement

PDF, High priority: read this firstitb
High

ITB-LIB-FY26-0714 Morgan Hill Library Roof Replacement - Addendum #3

PDF, High priority: read this firstamendment
High

ITB-LIB-FY26-0714 Morgan Hill Library Roof Replacement Bid Response Package

PDF, High priority: read this firstrfb
High

ITB-LIB-FY26-0714 Morgan Hill Library Roof Replacement Bid Response Package

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara County Library District (SCCLD)
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Steven LuuManagement Analyst / Procurement Officer

Full Description

Show more
Bid #ITB-LIB-FY26-0714: This public works project involves the removal of existing roofing and the installation of a new Ketone Ethylene Ester (KEE) roofing system on a metal deck for the Morgan Hill Library. The scope includes testing drains, tearing off and disposing of existing flashings, replacing wet insulation, removing and re-installing parapet caps and metal counter flashings, fastening a ¼” Densdeck primed coverboard, adhering 60 mil Tremply KEE FB membrane with low-rise foam adhesive, adhering KEE flashings, re-installing sheet metal flashings, and installing 400 linear feet of walk-pads. All work must conform to specifications, regulations, and industry best practices.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS