Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Diego Convention Center West Roof Replacement

Closed
K-27-2513-DB2-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
FAC 27-10 Sinclair Roof Replacement, Building 3 Penthouses & Skylights
Solicitation # FAC 27-10
Project FAC 27-10 involves the roof restoration of Building 3 at Sinclair Community College's downtown Dayton campus, specifically covering four elevated penthouse roofs, the area around existing skylights, and the west connector roof to Building 4. The scope of work includes the installation of a fluid-applied roofing system with base flashing plies, modified membranes, and joint sealants to ensure watertight and airtight seals, as well as the provision of necessary carpentry such as wood nailers, curbs, and plywood. Work must be performed in stages to accommodate owner occupancy and comply with State of Ohio and local building codes. The estimated contract cost for General Trades is $310,000.00. Bids must be submitted electronically via bidexpress.com by 2:00 pm local time on Tuesday, December 1, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and any accepted alternates. Key requirements include the use of domestic steel per ORC 153.011, adherence to prevailing wage rates, and the provision of performance and payment bonds. Bidders must submit a bid security form, bidder's qualifications, and an EDGE affidavit. Final acceptance is contingent upon a review by the A/E and the submission of a verified punch list. There is no set-aside status for this solicitation.
Sinclair Community College - Planning & Construction

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 238160
New
SLED
Gatesville ISD - Gatesville Intermediate Roof Repair RE-BID
Solicitation # 2026-1120
Gatesville Independent School District is soliciting proposals for a re-bid project to provide all labor, supervision, equipment, and materials for roof repairs at the Intermediate campus and a high school addendum. The scope of work includes clearing debris and gravel, installing 2.5-inch ISO board or equivalent insulation, and applying 60 mil GAF-TPO or equivalent roofing. The project covers approximately 89,600 square feet for the Intermediate campus and 896.5 square feet for the high school. Contractors are responsible for ensuring proper drainage, which may include raising HVAC curbs and gas lines at their own expense. All work must adhere to manufacturer specifications, including welding seams and installing proper pipe boots and penetration details. The solicitation, identified as RFP 2026-1120, requires bids to be submitted by December 7, 2026, with an award date of December 14, 2026. Bids must remain firm for 60 days from the award date. Award decisions will be based on the most advantageous outcome for the District rather than low price alone, considering factors such as vendor reputation, quality of services, project schedule, and warranty information. Proposers must submit a comprehensive set of mandatory forms, including certifications for criminal history, felony convictions, and anti-collusion, as well as a list of three references from the last three years. There is no specified set-aside status for this solicitation.
GATESVILLE ISD

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 238160
New
SLED
TDF - PIF Rooftop Walkway SP
Solicitation # B-54956
The Illinois Department of Human Services is soliciting bids for the installation of approximately 2,000 feet of anti-slip roofing walkway pads at the TDF facility in Rushville, Illinois. The project requires 1,600 feet of pads for existing tan TPO VersiFleece roofing and 400 feet for existing white EPDM roofing. Technical specifications mandate that pads be 34 inches wide with a minimum thickness of 150 mil, featuring a raised diamond plate tread pattern and safety yellow edges where available. The vendor must be an approved installer for Firestone, which is required specifically for the Gamma housing unit roof, and Versico, which is required for all other facility roofs. A mandatory pre-bid conference is scheduled for December 1, 2026. To be considered responsive, vendors must certify compliance with the Illinois Prevailing Wage Act and adhere to strict self-performance requirements, stipulating that the prime vendor must perform at least 51% of the total work using its own permanent W-2 employees. The contract is subject to the State of Illinois Standard Terms and Conditions V23, including requirements for worker's compensation insurance, non-discrimination, and the use of Illinois laborers during periods of excessive unemployment. Payment is governed by the State Prompt Payment Act, and the contract is contingent upon the availability of funds from the Illinois General Assembly or federal sources. There is no specified set-aside status for this solicitation.
MENTHLTH444 - Mental Health

POSTED

1 day ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of San Diego is seeking Design-Build services for the San Diego Convention Center West Roof Replacement project, with an estimated cost of 7,500,000 dollars. The project involves the design, permitting, and construction of a complete, durable, and watertight roofing and drainage system to replace the original 1989 roof on the West Building. A critical requirement is the maintenance of substantially uninterrupted operations at the convention center, requiring the contractor to implement strategic phasing and mitigation measures for noise, odor, and public safety to accommodate high-profile events such as Comic-Con. The scope includes coordinating improvements with existing mechanical, electrical, plumbing, structural, and photovoltaic systems, as well as evaluating roof safety tie-back anchor systems. The procurement follows a two-step nominating and selection process. In the first step, interested firms must submit a Statement of Qualifications (SOQ) via the PlanetBids portal by November 4, 2026. Evaluation of SOQs is based on project organization, key personnel, and equal employment and contracting opportunity. A shortlist of up to three highly qualified Design-Builders will be selected to participate in the subsequent Request for Proposal (RFP) stage. The project is subject to a Project Labor Agreement, state prevailing wage rates, and the City's Small Local Business Enterprise (SLBE) program requirements. Additionally, contractors must comply with CARB regulations for off-road diesel-fueled fleets, including specific vehicle labeling requirements.

General Info

San Diego seeks Design-Build services for a 7.5 million dollar convention center roof replacement.

Place of Performance

San Diego, CA, 92101, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this first65 pages · rfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 1071201Open now, due in 25 days
  • City Hall Roof ImprovementsOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #K-27-2513-DB2-3: $18

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 237110
SLED
Pump Station 2 Improvements And Modernization
Solicitation # K-27-2502-DBB-3-C
The Pump Station 2 Improvements and Modernization project (Bid #K-27-2502-DBB-3-C) is a phase-funded construction contract issued by the City of San Diego to enhance the reliability and operability of Pump Station 2. The comprehensive scope of work includes replacing eight pumps, six motor controllers, and installing Variable Frequency Drives and reduced voltage soft starters. Infrastructure upgrades involve rehabilitating suction and discharge piping, installing a VFD room, and updating HVAC, ventilation, and architectural elements. Structural repairs are required for Wet Wells 1 and 2, influent channel liners, and discharge header systems, alongside the replacement of instrumentation and monitoring systems. The project must be completed within 1,452 working days, with construction activities for each phase requiring a separate Notice to Proceed. The contract will be awarded to the lowest responsible and reliable bidder based on the base bid and any proposed alternates. Bidders must adhere to the 2024 Greenbook and Whitebook standards and comply with Build America Buy America requirements, prevailing wage rates, and a Project Labor Agreement. Key administrative requirements include the submission of a bid bond, a confidentiality certification, and a schedule of values. Payment for major equipment is structured across six milestones, ranging from purchase orders and fabrication to final performance verification. There is no specific set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS