Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Morganza to the Gulf, Reach F Construction

Closed
W912P825SS0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 13 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 13 hours ago

DEADLINE

in about 17 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 13 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 18 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

LA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist New Orleans
Contacts2 people available
OfficeNEW ORLEANS, LA, 70118-3651, USA
Office AddressNEW ORLEANS, LA, 70118-3651, USA

Full Description

Show more
THIS NOTICE IS FOR SOURCES SOUGHT ONLY. This announcement is seeking information from industry, which will be used by the Government for preliminary planning purposes. No proposals are being requested or will be accepted with this sources sought, and no reimbursement will be made for any costs associated with providing information in response to this synopsis. THIS IS NOT A SOLICITATION AND NO CONTRACT SHALL BE AWARDED FROM THIS SOURCES SOUGHT. After review of the responses to this notice, and if the Government intends to proceed with the acquisition, a separate announcement will be published on the System for Acquisition Management (SAM) website (SAM.gov). The U.S. Army Corps of Engineers, New Orleans District is issuing a Sources Sought synopsis as a means of conducting market research to identify parties having an interest in and experience with construction of earthen levees in an environmentally sensitive marsh habitat in Southern Louisiana with utilities involved and possibly requiring barged materiel for the upcoming construction of Reach F Levee for the Morganza to the Gulf, Risk Reduction System. The purpose of this Sources Sought synopsis is to gauge interest, capabilities, and qualifications of the construction community, as the Government must ensure there is adequate interest, capability, and competition amongst the potential pool of responsible contractors. The Government will use responses to this SOURCES SOUGHT NOTICE to make appropriate acquisition decisions for this procurement. Morganza to the Gulf, Reach F Construction is anticipated to be approximately four miles of earthen levee in a marsh environment over intersecting utilities. The project is located southwest of Dulac, starting approximately thirteen miles of the Gulf Intracoastal Waterway and running parallel to the Houma Navigation Canal. The Estimated Magnitude of construction is between $25,000,000.00 and $100,000,000.00. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990. General work consists of clearing and grubbing, degradation of existing levee, embankment placement up to elevation 17.0, placement of geotexile, access roads, surfacing, turf establishment, and other related incidental work. Experience working in unique local marsh/ open water conditions, around existing utilities, and with barged materiel is imperative to success. The Government intends to provide a borrow site within 20-25 miles from the project area. The plans and specifications allow for the contractor to provide alternate borrow source through the - Provision for Right of Way for Convenience (see appendix A for further details). The questions herein this Sources Sought will help the project team analyze the feasibility of using this provision. All interested firm's response to this Sources Sought Synopsis shall be limited to five (5) pages and shall include the following information: 1. The Firm's name, address, point of contact, phone number, website, and email address. 2. The Firm's interest in bidding as a Prime, Joint Venture, or Partner. 3. The Firm's single and aggregate bonding capacity. 4. The Firm's small business social economic categories certification, if applicable: Small Business, Small Disadvantaged Business, Veteran Owned Small Business, Women Owned Small Business, Historically Underutilized Business Zones, etc. 5. The Firm's capability to perform such heavy construction methodology. The Firms shall provide examples which include, at a minimum, the following information: Experience in construction of earthen levee projects. Experience with projects in a marsh habitat, open water, and around environmentally sensitive areas. Experience with barging material. Contract type, firm fixed price or cost reimbursable. Customer name Timeliness of performance Customer satisfaction Project awarded cost and final completed construction cost. This contract will include a provision allowing for Right of Way (ROW) for Convenience where a contractor, at their discretion, may locate and propose their own borrow source. If the government were to grant additional time for ROW for Convenience, what cost saving measures would you propose? See ROW for Convenience requirements in Appendix A below. Submission of your interest is not a prerequisite to any potential future posting, but participation will assist in identifying sources with required capabilities. Respondents WILL NOT be notified of the results of the evaluation. Statements that do not meet all requirements or are not submitted within the allotted time will not be considered. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation at this time. NOTE: Contractors must be registered in SAM (System for Award Management) to be eligible for contract award or payment from any DOD activity. Registration requires applicants to have a UEI number. Recommend registering immediately to be eligible for any potential procurement. Please send your responses no later than 12:00 p.m. February 28, 2025, via email to lauren.a.gandolfi@usace.army.mil AND Christopher.Nuccio@usace.army.mil. Appendix A Provision for Right of Way for Convenience If the Contractor proposes a deviation from the Government furnished rights of-way for his convenience, the Contractor shall notify the Contracting Officer or its representative in writing. Contractor shall not provide any permanent rights of-way for the project. The Contractor is cautioned that any deviation to the Government furnished rights-of-way is subject to all applicable Federal and state environmental laws and regulations. Compliance with these environmental laws and regulations may require additional National Environmental Policy Act (NEPA) documents, cultural resources surveys, coordination with the Louisiana State Historical Preservation Officer, water quality certification, modification of the Federal consistency determination, etc. The Government is ultimately responsible for environmental compliance; therefore, the Government will determine the additional environmental coordination and documentation necessary for a proposed deviation to the Government furnished rights-of-way. For any environmental investigations the Government is to perform on areas outside of Government furnished rights-of-way, the Contractor shall provide sufficient rights of entry to the Government. The Contracting Officer will advise the Contractor of the additional environmental coordination and documentation that must be completed. The Government shall be responsible for any additional environmental compliance; however, the Contractor may conduct specific tasks identified by the Government. The Government will offer advice and assistance to the Contractor in conducting these tasks. Depending on the environmental impact of the proposed deviation, obtaining the coordination and documentation may not be approved or could take as much as 180 days for approval by the Government. The Government must review, approve and ensure distribution of all environmental compliance documentation and ensure all comments on the same have been resolved before any utilization of any areas outside of the Government furnished rights-of-way. The Contractor shall reimburse the Government for actual expenses incurred for assistance in completing or attempting to complete additional environmental coordination and documentation, which expenses will not exceed two hundred thousand ($200,000) dollars. There is no guarantee that environmental compliance will be obtained; therefore, the Contractor shall assume all risks and liabilities associated with pursuing a deviation. Any delays resulting from the deviation and/or the environmental coordination and documentation shall not be made the basis of any Contractor claim for increase in the contract cost and/or increase in contract time. Deviations will be at Contractor's sole risk and liability, including, but not limited to, such liabilities associated with items such as hazardous substances regulated under the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C. 9601 et. seq.), and at no cost to the Government. Government assistance in obtaining additional environmental clearances does not relieve the Contractor of responsibility for complying with other Federal, state or local licenses and permits.

More opportunities from Department Of Defense → W07V Endist New Orleans

Same awarding agency

NAICS: 326199
New
Federal
Sources Sought for Calcaiseu River Saltwater Barrier FRP Tainter Gate
Solicitation # W912P827SS0001
The US Army Corps of Engineers, New Orleans District, is conducting market research via a sources sought notice for the design, fabrication, and delivery of fiber reinforced polymer FRP Tainter Gates for the Calcasieu River Saltwater Barrier. The requirement consists of a base bid for two gates and an option for three additional gates, totaling five units. These gates must be fully integrated into the existing structure, maintaining interchangeable installation and operation with existing steel gates, including specific bolted connections, seal locations, and machinery lifting connections. The completed gates will be delivered by barge and offloaded at the Calcasieu River Saltwater Barrier and Sector Gate facility, though the USACE will handle the actual installation. The anticipated contract will be a firm-fixed-price, Two-Phase Design Build project under NAICS code 326199, with a small business size standard of 750 employees. The government is seeking capabilities statements of no more than twenty pages to evaluate market capacity, specifically focusing on technical resources, bonding capabilities, and the ability to meet tight program schedules. Interested parties must submit their responses via email to Taylor Brandon and Karen Hargrave by 1:00 PM local time on November 4, 2026. This notice is for informational purposes only and does not constitute a formal solicitation or request for proposal.
All Other Plastics Product Manufacturing

POSTED

5 days ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers New Orleans District is soliciting bids for the Lake Pontchartrain and Vicinity Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm-fixed-price contract, under NAICS code 237990, has an estimated construction magnitude between $25,000,000 and $100,000,000. The scope of work covers Reaches 1, 2, 3, and 4 and includes demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextile, placing stone, and turf establishment and maintenance. The project requires adherence to EM 385-1-1 safety standards and the MUTCD for traffic control. The bid submission deadline has been extended to October 27, 2026, at 10:00 a.m., with the bid opening scheduled for 11:00 a.m. The contractor must commence work within 10 calendar days of the notice to proceed and complete all base work within 300 calendar days. Key contract terms include liquidated damages of $4,295.00 per calendar day of delay and a requirement for bid, performance, and payment bonds. Award will be made to a single bidder based on price responsiveness and reasonability, with a price evaluation preference for HUBZone small businesses. Invoicing must be processed through Wide Area WorkFlow.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 332911
Federal
3-Way Control Valve and Controls for the U.S. Dredge Wheeler
Solicitation # W912P826QA039
The U.S. Army Corps of Engineers, New Orleans District, is soliciting quotes for the procurement of two fully assembled pneumatic 3-way temperature control valves and a corresponding pneumatic control system with an integral temperature sensor for the U.S. Dredge Wheeler. This requirement is issued as a total small business set-aside under NAICS code 332911 for Industrial Valve Manufacturing. The contract will be awarded as a firm-fixed-price agreement to the responsible offeror representing the best value to the government. Technical requirements specify that the valves must be designed for fresh water and MarineCare Caretreat, with deliverables including operation and maintenance manuals as well as hydrostatic pressure and seat leakage certifications. Under Amendment 0001, the quote submission deadline has been extended to October 30, 2026, at 10:00 AM local time. Offerors must be registered in the System for Award Management and provide a technical quote including general arrangement drawings, piping and instrumentation schematics, and detailed product datasheets. The equipment must be delivered FOB Destination to New Orleans, Louisiana, on or before June 1, 2027. Award evaluation is based on technical acceptability and price, with payment processed electronically through the Wide Area WorkFlow system.
Industrial Valve Manufacturing

POSTED

29 days ago

DEADLINE

in 10 days
View Details
NAICS: 237990
Federal
Barataria Bay Waterway, Maintenance Dredging, Bar Channel
Solicitation # W912P826BA062
The US Army Corps of Engineers, New Orleans District, is soliciting bids for a firm fixed price contract for maintenance dredging of the Barataria Bay Bar Channel in Jefferson Parish, Louisiana. The scope of work involves the removal of shoal material and its disposal at the Grand Terre Island disposal site, with no dike work required. The project includes the dredging of an estimated 375,000 cubic yards for the primary requirement and an additional 100,000 cubic yards as an optional quantity, along with mobilization, demobilization, and bird nesting avoidance measures. The estimated time for completion is 90 calendar days after the receipt of the notice to proceed. Award will be made to a single bidder based on total price, with a 10 percent evaluation preference applied to HUBZone small business concerns and other successful small businesses. The contractor must adhere to EM 385-1-1 safety standards, the Seagoing Barge Act, and prevailing wage rates specified in General Decision LA20260007. Key deliverables include a preliminary project schedule within 15 days and an initial project schedule within 42 days of the notice to proceed. Final acceptance is contingent upon a formal inspection by the Contracting Officer, requiring 14 days advance notification from the contractor. Payments will be processed electronically through the Wide Area WorkFlow system.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

in almost 2 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS