Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Port Allen Lock Forebay Bucket Dredging

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves performing mechanical bucket dredging for prime contractors on US Army Corps of Engineers projects, specifically focusing on the Port Allen Lock Forebay. The scope of work requires the use of specialized bucket dredging equipment, distinct from hydraulic systems, to remove material and ensure the lock forebay reaches specified depths. The project is managed under the Department of Defense through the W07V Endist New Orleans agency, categorized under NAICS code 237990. There is no specified set-aside status for this contract. The solicitation was posted on November 19, 2026, with a response deadline of November 17, 2028.

General Info

Mechanical bucket dredging for US Army Corps of Engineers at Port Allen Lock Forebay.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

LA

Set-Aside

NONE

Documents

This scope was carved out of W912P827BA002.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ATCHAFALAYA BASIN, GIWW, CUTTERHEAD DREDGE CONTRACT, OM-25066

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 729 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom ATCHAFALAYA BASIN, GIWW, CUTTERHEAD DREDGE CONTRACT, OM-25066
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist New Orleans
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs mechanical bucket dredging for prime contractors on US Army Corps of Engineers (USACE) projects. Removes material specifically from the Port Allen Lock Forebay using a bucket dredge to reach specified depths. Operates specialized bucket dredging equipment distinct from hydraulic systems. Delivers a dredged lock forebay to specified depths.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W07V Endist New Orleans

Same awarding agency

NAICS: 237990
New
Federal
ATCHAFALAYA BASIN, GIWW, CUTTERHEAD DREDGE CONTRACT, OM-25066
Solicitation # W912P827BA002
The Atchafalaya Basin, GIWW, Cutterhead Dredge Contract (OM-25066), solicitation number W912P827BA002, is a firm fixed price procurement issued by the Department of Defense, W07V Endist New Orleans. The project involves the removal and disposal of material from primary and secondary dredging regions, with an estimated contract value between $10,000,000 and $25,000,000. This is an unrestricted procurement with no set-aside status, although the HUBZone price evaluation preference applies. Award will be granted to the responsible bidder who provides the lowest priced responsive bid, provided they meet specific responsibility criteria and submit bids on the correct bid lot based on dredge discharge size. The contractor must deliver the hydraulic dredge and attendant plant and commence dredging within 240 hours of the Notice to Proceed, with Berwick Bay Harbor serving as the delivery site for bidding purposes. Key requirements include the submission of an Accident Prevention Plan within 24 hours of award and adherence to EM 385-1-1 safety standards. All hydrographic surveys must be certified by a Professional Land Surveyor with at least three years of experience. Payment is processed electronically via the Wide Area WorkFlow (WAWF) system. Bids must be submitted through the PIEE Solicitation Module, and a bid bond of 20 percent of the bid price or $3,000,000 is required.
Other Heavy and Civil Engineering Construction

POSTED

about 16 hours ago

DEADLINE

in almost 2 years
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS