Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Mormon Slough Sanitary Sewer Line

Forecast
SJN-59253-R2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mormon Slough Sanitary Sewer Line Replacement Project, managed by the City of Stockton Public Works Department under solicitation SJN-59253-R2, involves the rehabilitation of sanitary sewer infrastructure in San Joaquin County, California. The scope of work includes replacing approximately 2,080 to 2,600 feet of existing 24-inch reinforced concrete pipe with 30 to 36-inch PVC pipe. Additionally, the project requires the installation of three 10-inch PVC sewer pipes connecting the mainline to existing manholes, the installation of eight new sanitary sewer manholes, and the removal or abandonment of five existing manholes. Construction will primarily utilize open trench methods, with two specific sections installed via jack and bore. To maintain operational continuity and environmental safety, the project will employ temporary sewer bypass systems and erosion control measures. The project is subject to several regulatory approvals and environmental mandates, including Permit No. 20035 under California Code of Regulations Title 23 for flood control and a Streambed Alteration Agreement (EPIMS Notification No. SJN-59253-R2) pursuant to Section 1602 of the Fish and Game Code. Environmental reviews conducted by the City of Stockton, the Central Valley Regional Water Quality Control Board, and the Department of Fish and Wildlife have determined that the project will not have a significant environmental effect, supported by a Mitigated Negative Declaration under the California Environmental Quality Act. Project administration is led by Associate Engineer Seng Lo and Project Manager Ray Deyto.

General Info

Stockton replaces sewer pipes and manholes in San Joaquin County under solicitation SJN-59253-R2.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Stockton
Contacts3 people available
OfficeN/A
Organization / AgencyCalifornia → City of Stockton
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Ray DeytoProject Manager
Seng LoAssociate Engineer

Full Description

Show more
Approval of Permit No. 20035, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: to replace approximately 2,080 feet of existing 24-inch reinforced concrete sanitary sewer pipe with 30-inch polyvinyl chloride (PVC) sewer pipe, install three 10-inch PVC sewer pipes from the mainline to existing manholes, install eight sanitary sewer manholes, remove portions of existing pipes and five manholes, and abandon-in-place and grout or remove and backfill sections of the existing 24-inch pipes. All construction will be open trench except that two sections of sewer line will be installed by jack and bore. Temporary sewer bypass systems and erosion control measures will be used during construction.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping in various diameters, the construction of standard and doghouse manholes, and the execution of trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, and the abandonment of existing pipes and manholes. Site preparation tasks encompass clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Critical project requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the procurement of railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes. Primary contact for this opportunity is John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is being solicited as a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid bond, evidence of authority to sign, and MWBE compliance documentation, including a Good Faith Efforts Form and Table A. The project is governed by EJCDC standard general and supplementary conditions, with technical requirements adhering to AWWA, NEMA, AWS, and ASTM standards. Contract administration is managed by Willis Engineers, and the contractor is required to furnish performance and payment bonds equal to the contract price, as well as insurance from companies with an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
WG Construction is seeking MBE/WBE subcontractors for the Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. Subcontracting opportunities are specifically available for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The project must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages of 1,000 dollars per day for delays. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety standards, ADA requirements for sidewalks and ramps, and the use of VDOT 2020 Road and Bridge Specifications. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount. Interested parties should contact Trish Mousavizadegan at [email hidden] or [phone hidden] for plans and specifications.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → City of Stockton

Same awarding agency

NAICS: 541320
SLED
Van Buskirk Park Revitalization ProjectThe Van Buskirk Park Revitalization Project, managed by the City of Stockton Public Works Department, involves the expansion of Van Buskirk Park by 30 acres to reach a total size of 192.71 acres on a former golf course. Located at 734 Houston Avenue in Stockton, San Joaquin County, California, the project will develop a wide array of recreational amenities. Key constructions include a community garden, nature-based waterplay splash pad, shade structures, walking pathways with nature-based furnishings, a multipurpose lawn, a skate park, a BMX track, bike trails, and two new basketball courts with an accompanying bathroom. The project also includes the renovation of existing basketball courts, as well as the addition of a playground, dog park, indoor facilities, an 18-hole disc golf course, a golf academy, and an event lawn with an outdoor pavilion. The project is subject to the California Environmental Quality Act and has been approved through the issuance of Notices of Determination, certifying that environmental impact reports and mitigation measures were considered. Financial assistance for the project is provided by the National Park Service Land and Water Conservation Fund Program, with the California Department of Parks and Recreation serving as the Responsible Agency and administrator of these funds. The project is categorized under NAICS code 541320 for architectural and engineering services.
Landscape Architectural Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS