Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on September 18, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mosquito Ridge Road Repair

Closed
AG-9JGP-S-17-0148Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2027022
Solicitation # 2027022
RFP 2027022 is a unit price solicitation issued by the Spartanburg County Government for the Tier 3 Subdivision Reclamation project focusing on Group 1, specifically the Timberlake and Wicklow areas in South Carolina. The scope of work involves road reclamation and paving, with core requirements including the installation of 2 inch Surface C and 8 inch CMRB Method B, as well as the application of temporary and thermoplastic pavement markings. Technical specifications require the use of a sloped edge longitudinal shoulder joint attachment per SCDOT Standard 401.3.19.2, with devices sourced from Qualified Products List 75. Additional project components include 8 inch full depth patching, removal and disposal of existing asphalt pavement for driveway tie-ins, maintenance stone, and as-needed wrecker services. The contract is administered as a unit price agreement where final payment is based on field-verified quantities of work performed. Proposers must maintain minimum insurance coverage, including 1 million dollars in general liability, and certify compliance with the Federal Civil Rights Act, the Americans with Disabilities Act, and the Drug Free Workplace Act. Proposals must remain valid for 60 days following the opening date. Payment for undisputed invoices is due upon receipt and considered past due after 30 days, with no interest accruing on late payments. All work must adhere to industry standards and SCDOT specifications, and the contract is subject to appropriation by the county.
Spartanburg County Government

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-40 Capital Connector Construction Project
Solicitation # 2026-40
The City of Charleston, West Virginia, is soliciting bids for the Capital Connector Project, a multimodal corridor improvement initiative funded by a federal RAISE grant. The project aims to transform the Kanawha Boulevard Bike and Walkway corridor into a complete street, encompassing approximately 3.25 miles of improvements along Kanawha Boulevard East (US Route 60) from Magic Island to the 35th Street Bridge, as well as 0.25 miles of safety upgrades on Greenbrier Street. Key deliverables include lane reductions, protected intersection improvements, signal modifications, the installation of bioswale systems, and the widening of shared-use paths. All work must adhere to 2023 WVDOH Standard Specifications, ADA Section 504, PROWAG standards, and the Build America Act and Buy America requirements. Eligible bidders must be listed on the West Virginia Division of Highways' Prequalified Contractors List and must not be delinquent in Business and Occupation taxes or owe more than 1,000 dollars to the state or its political subdivisions. The contract will be awarded to the lowest responsive and responsible bidder, with a performance period of 548 calendar days from the Notice to Proceed. Bids must be submitted electronically via BidExpress by December 3, 2026, and must include a bid bond for 5 percent of the total amount. Successful vendors are required to provide performance and labor/material payment bonds for 100 percent of the contract value, maintain commercial general liability insurance of at least 1,000,000 dollars per occurrence, and comply with Davis-Bacon prevailing wage standards.
City of Charleston

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a firm-fixed-price construction contract issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. The project requires the contractor to provide all necessary equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The estimated magnitude of construction is between $25,000 and $100,000, with a period of performance of 210 calendar days from the receipt of the notice to proceed. Work is restricted to Monday through Friday, from 7:00 AM to 3:30 PM. This procurement is a total set-aside for small business vendors under NAICS code 237310. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit comprehensive documentation covering technical capabilities, price, and past performance from the last three years. Key safety requirements include strict adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer Designation Letter within 21 days of the notice to proceed. No field work may begin until these pre-construction submittals are accepted. Award will be granted to the responsible vendor whose quotation is most advantageous to the government based on a comparative evaluation of price and technical factors.
W2SD Endist New England

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Solano State Route 12 Pavement Preservation (04-0AA53)
Solicitation # 04-0AA53
The Solano State Route 12 Pavement Preservation project (EA 04-0AA53) is a Caltrans District 4 initiative located in Solano County, California, spanning State Route 12 between postmiles 14.10 and 20.68. With a total programmed cost of approximately 37.388 million dollars, the project focuses on comprehensive roadway improvements including pavement dig-outs, cold planing, asphalt concrete overlay, and the installation of AC dikes. Additional scope elements include shoulder widening, drainage improvements, the upgrade of metal beam guardrails, traffic signing panel updates, and the installation of centerline and shoulder rumble strips and pavement delineation. The project is governed by the 2025 Caltrans Standard Specifications, with specific requirements for job site management and the handling of hazardous waste and contamination. Environmental compliance is a primary focus, as evidenced by a Mitigated Negative Declaration under CEQA and the requirement for various permits, including a 1602 Lake and Streambed Alteration Agreement and a Section 401 Clean Water Act Permit. Strict protocols are in place for the delineation of Environmentally Sensitive Areas using high-visibility markings and the implementation of biological inspection measures for pipes, culverts, and open trenches. The project also adheres to Title VI of the Civil Rights Act and the Americans with Disabilities Act to ensure non-discrimination and accessibility.
Caltrans, District 4 - Bay Area/Oakland

POSTED

about 11 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
CONSTRUCTION ON STATE HIGHWAY IN SANTA CRUZ COUNTY 0.1 MILE SOUTH OF SARATOGA TOLL ROAD AT THE SAN LORENZO RIVER
Solicitation # 05-1K9014
The California State Department of Transportation (CalTrans) is soliciting bids for contract 05-1K9014 to construct a bridge structure for fish passage restoration on State Highway Route 9 in Santa Cruz County. Located 0.1 mile south of Saratoga Toll Road at the San Lorenzo River, the project involves the construction of the northbound bridge and pavement sections, the implementation of reversing traffic for vehicles and bikes, and the relocation of AT&T underground fiber to an overhead position. All work must adhere to 2025 Standard Specifications and Standard Plans, with project plans approved as of May 4, 2026. The contract is awarded on a unit price basis, with specific line items including concrete barriers, thermoplastic traffic striping, and asphalt concrete rumble strips. The project mandates strict adherence to environmental work windows for creek activities and requires a full-time, on-site Safety Quality Control Manager. Quality standards include a welding QC plan, specific test sample lengths for reinforcing steel, and compliance with the RWQCB basin plan for local materials. Contractors must comply with Buy America/Build America requirements and pay the higher of either the U.S. Secretary of Labor or the California Department of Industrial Relations prevailing wage rates. Additional requirements include the submission of DVBE quotes and certificates of reported compliance for off-road diesel-fueled vehicles. Bids are due by December 3, 2026, and contractors must provide a 72-hour notice before starting job site activities.
California State Department of Transportation (CalTrans)

POSTED

about 11 hours ago

DEADLINE

in about 1 month

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Mosquito Ridge Road (FS Road 96) east of Foresthill, mainly in the vicinity of mile posts 12 through 18., FORESTHILL, CA, 95631, USA

Set-Aside

SBA

Documents

22

2017 Mosquito Ridge FSS Specifications

DOCX, High priority: read this first80 pages · specifications
High

A1 - Title Page, Mosquito Ridge Road Rehabilitation Project

PDF, High priority: read this first1 page · sow
High

AG-9JGP-S-17-0148 Amendment 001 - Mosquito Ridge Road Repair

DOC, High priority: read this first6 pages · amendment
High

AG-9JGP-S-17-0148 Mosquito Ridge Road Repair IFB

DOC, High priority: read this first34 pages · ifb
High

AG-9JGP-S-17-0148 Mosquito Ridge Road Repair Solicitation

DOC, High priority: read this first32 pages · ifb
High

B1 - Mosquito Ridge Road Rehabilitation Site 1 Remediation Detail

PDF, High priority: read this first1 page · sow
High

B2 - Site 2 Remediation Detail

PDF, High priority: read this first1 page · specifications
High

B3 - Pile Details, Tahoe NF Mosquito Ridge Road Rehabilitation

PDF, High priority: read this first1 page · specifications
High

B4 - Mosquito Ridge Road Rehabilitation Remediation and Optional Items

PDF, High priority: read this first1 page · sow
High

B5 - Pile Facing Detail 2, Mosquito Ridge Road Rehab Site 3

PDF, High priority: read this first1 page · specifications
High

C1 Soil Nail Wall (Route 23) Typical Detail

PDF, High priority: read this first1 page · specifications
High

C2 Option - High Capacity Soil Anchoring Detail

PDF, High priority: read this first1 page · specifications
High

C3 Option – Site 3 Landslide Encapsulation

PDF, High priority: read this first1 page · specifications
High

CA170009 California Davis-Bacon Wage Determination

DOCX, High priority: read this firstwage-determination
High

CA170009 Davis-Bacon Wage Rates, Placer County

DOC, High priority: read this first1 page · wage-determination
High

Fire Plan for Construction and Service Contracts - 08/02/2012

DOC, High priority: read this first9 pages · sow
High

FS96 Mosquito Ridge Road Patching - RD 96 Cost

XLSX, High priority: read this first11 pages · sow
High

Turf Reinforcement Mat - Installation Detail and Order of Work

PDF, High priority: read this first1 page · sow
High

B7 - Tahoe NF Mosquito Ridge Road Rehabilitation

PDF, Low priority1 page · other
Low

B8 - Tahoe NF Mosquito Ridge Road Rehabilitation Site 2 Road Reconstruction

PDF, Low priority1 page · other
Low

B9 - Mosquito Ridge Road Rehabilitation / Site 3 Road Reconstruction

PDF, Low priority1 page · specifications
Low

Mosquito_Ridge_RD_SITE_VISIT_SIGN_IN_-_Copy.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Tahoe National Forest
Contacts2 people available
OfficeNEVADA CITY, CA, 95959, USA
Office AddressNEVADA CITY, CA, 95959, USA
Contacts
Matthew GagnonContracting Officer
Sarah HillProcurement Technician

Full Description

Show more
This project is a Total Small Business set-aside. The NAICS code for this project is 237310. The small business size standard is no greater than $36.5 million in average annual receipts. Only offers from firms that are certified to meet the size standard will be considered. You may contact your local U.S. Small Business Administration (SBA) office (federal, not state office) for more information on the Total Small Business program. Your local SBA office's contact information may be found by accessing the SBA website (www.sba.gov). The Contract shall be for all work associated with repair of multiple failures to the Forest Service 96 roadway out of Foresthill, California. During the 2017 winter, the 96 Road, known as Mosquito Ridge Road, experienced damage to the cut/fill bench in the form of three major failures at Mile Post 12.8, 13.9 and 17.7 along with numerous other minor erosion events. The Work Shall Commence around October 15 2017 and have a period of performance of approximately 180 Days. Work shall include: - mobilization and excavation of each site of failed material, pre-existing subbase and asphalt, - installation of steel rail pile groups into competent material below the failure plane, - replacement with suitable fill, compaction and installation of geogrid fabric in layers, soil anchors, or welded wire mesh to stabilize fill - Placement of Sub-base and drainage features - Placement of asphalt, striping, guardrails and signage - Work shall include all traffic control, storm water compliance and coordination with the USFS The Government's estimate is between $1,000,000 and $5,000,000 The solicitation package will be uploaded when ready, approximately August 2, 2017. The date of award is expected to be within 60 days after the actual response date, which will be stated in the package and may possibly be changed in one or more amendments. Please hold any technical questions until after review of the solicitation. The purpose of this notice is to meet the FAR 5.201 and 36.213-2 requirements. It is the contractor's responsibility to monitor the Federal Business Opportunities website for amendments.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS